Professional Documents
Culture Documents
Lampiran 14 Perhitungan Material Balance Dan Recovery Jig
Lampiran 14 Perhitungan Material Balance Dan Recovery Jig
a. Jig Primer
F =C+T
= (199.620 Kg/Jam) + (36261 Kg/Jam + 12117.60 Kg/Jam)
= 48578.22 Kg/Jam
Feed (Ff) = Cc + Tt
= (199.620 Kg/Jam x 5.86195 %) + ((36261 Kg/Jam x 0.00107 %)
+ (12117.60 Kg/Jam x 0,00131 %))
= 11.70 Kg/Jam + 0.546 Kg/Jam
= 12.2467 Kg/Jam
Cc+Tt
f (kadar feed) = 100 %
F
12.2467Kg/Jam
= 100 %
4878.22 Kg/Jam
= 0,025 %
96 Universitas Sriwijaya
97 (Lanjutan)
Cc
Recovery = 100 %
Cc+Tt
11.70 Kg/Jam
= 100 %
12.2467 Kg/Jam
= 94.53 %
b. Jig Clean Up
F =C+T
= 199.620 Kg/Jam + 12117.60 Kg/Jam
= 12317.22 Kg/Jam
Feed (Ff) = Cc + Tt
= (199.620 Kg/Jam x 5.86195 %) + (12117.60 Kg/Jam x 0.00131
%)
= 11.7016 Kg/Jam + 0,1587 Kg/Jam
= 11.8603 Kg/Jam
Cc+Tt
f (kadar feed) = 100 %
F
11.8603 Kg/Jam
= 100 %
12317.22 Kg/Jam
= 0,096 %
Cc
Recovery = 100 %
Cc+Tt
11.7016 Kg/Jam
= 100 %
11.8603 Kg/Jam
= 98.66 %
Universitas Sriwijaya
98 (Lanjutan)
Cc+Tt
f (kadar feed) = 100 %
F
12.25Kg/Jam
= 100 %
48578.62 Kg/Jam
= 0,025316854 %
Cc
Recovery Total = 100 %
Cc+Tt
11.70
= 100 %
12.25 Kg/Jam
= 94,51 %
Universitas Sriwijaya