PROGRESS
Location : POWER HOUSE
Section : COLUMN EL. 443.3 - 449.25 (Unit 3-4)

SKETCH / DRAWING DESCRIPTION / CALCULATION QUANTITY UNIT

1. Concrete C25
area L Jumlah
A = 1.500 m2 x 3.80 m x 1 nos = 5.70 m3
Total 5.70 m3

2. Form work expose

area L Jumlah
A = 5.000 m x 3.80 m x 1 nos = 19.00 m2
Total 19.00 m2

Column EL. 443.3-449.25


3. Form Tie
= 5.70 m2 x 4 nos = 22.80 nos
Total 22.80 nos

Axis 13

section column