Professional Documents
Culture Documents
Formula 2
Formula 2
:
Project :
HYDRAULIC CALCULATIONS
Mannings Formula
2 1
1
Qc = n A2 R3 S 2
Qc = Capacity of drain (m3/s)
n = Roughness coefficient = 0.015 (for concrete drains)
A2 = Flow Area (m2)
A2
R =
P
P = Wetted perimeter
S = Bed Gradient
Formula.doc