Test ID: G4m-275#1213 Ring: R2F04(3661)

Pipe: Piping Plant Config: 1.0FR, T(0,1)


Site: PT PTM RU V Calibration: Auto (1234,04 mV)
Location: HCC Area Plant 3 A Version: 3.103, Wavemaker G4m-475
Size: 4 inch (5.8mm) GPS: 114.7399'S, 11649.1741'E
Tested: 14/03/2017 13:22 Client: PT. PERTAMINA RU V BALIKPAPAN
Tested by: Syarif Abas [NSK] Procedure: GU 1.1 bisa ga sih bikin
DACs: Call=7%, Weld=23% laporan lebih
care,tanggung
General Notes: TP #04 LN 3-P-205/B20/4", Thickness at ring position 0 o'clock 5.93 mm, 3 o'clock 6.34 mm, 6 o'clockjawabmu
6.28 mm, sama
9 o'clock 5.96 mm, no general internal corrosion was detected. kerjaan dimana

Feature Location Length Class Notes


S1 0.69 0 Support 1 The first Support from the ring position, seen from positive direction
W1 1.18 0 Weld 1 The first weld from the ring position, seen from positive direction
END -2.97 ~ End End of Inspection
END 10.85 ~ End End of Inspection
B1 -2.37 0 Bending 1 The first elbow from the ring position, seen from negative direction
B2 10.34 0 Bending 2 The second elbow from the ring position, seen from positive direction