Professional Documents
Culture Documents
Costing
Costing
Note: The cost estimates is based on approximately 12382 ft2 gross built up area.
Estimated
Item M&E Services Installation Cost
(RM)
A. Electrical Services Installation 270,500.00
B. Fire Protection Services Installation 83,000.00
C. Air-Conditioning and Mechanical Ventilation Services Installation 86,000.00
D. Swimming Pool and Water Features Equipments 227,000.00
E. TNB Contribution Fees 5,400.00
Grand Total 671,900.00
OPTIONAL :
A. Operational and Maintenance / Month 21,500.00
Exclusion:
1 PABX
2 IT Structural Cabling
3 Key Phone
4 Landscape Fitting
5 Projector Screen
6 Display TV