‘SCHEDULE 1 CONNECTION CHARGES FOR CATEGORY 3 CONSUMER KWo TYPE OF CONNECTION ‘CONNECTION METERING ‘CHARGE ‘CHARGE (where the substation | _ (where the substation bulding and the land sto | busing ls to be but and be leased to TNB ata | the land has tobe ‘ominal cost of RM10 or | purchased by TNB at 2 ‘no substation is required) | price agreed withthe owner) @ © © @ RM 260 RM400 ice (Low cost House | (LowCosT HOUSE ese < RM 25,000)