HCB's

Period (time) Total time


Item no Dates
Start End (hours)

1 9/12/2016 7:30 12:30 5

2 9/20/2016 7:30 12:30 5

3 14/09/2016 11:00 16:00 5


4 15/09/2016 7:00 12:00 5
5 9/16/2016 7:00 16:00 9
6 9/17/2016 7:00 16:00 9
7 9/18/2016 7:00 16:00 9
8 9/19/2016 7:00 16:00 8
9 9/20/2016 7:00 16:00 8
10 9/21/2016 7:00 16:00 8

11 10/24/2016

12 10/24/2016

13 10/27/2016 10
7:30 17:30
14 10/28/2016 10
7:30 17:30
15 10/29/2016 7:30 17:30 10

16 10/30/2016 10
7:30 17:30
17 10/31/2016 10
7:30 17:30
18 11/1/2016 7:30 17:30 10
19 11/2/2016 7:30 17:30 10

20 11/3/2016 10
7:30 17:30
21 11/4/2016 7:30 17:30 10

22 11/11/2016 7:30 12:30 5

23 11/18/2016 7:30 17:30 10


24 11/19/2016 7:30 17:30 10
25 11/20/2016 7:30 17:30 10
26 11/21/2016 7:30 17:30 10
27 11/22/2016 7:30 17:30 10
28 11/23/2016 7:30 17:30 10
29 11/24/2016 7:30 17:30 10
30 11/25/2016 7:30 17:30 10
31 11/26/2016 7:30 17:30 10
32 11/27/2016 7:30 17:30 10
33 11/28/2016 7:30 17:30 10
34 11/29/2016 7:30 17:30 10
35 11/30/2016 7:30 17:30 10
36 31/11/2016 7:30 17:30 10
37 12/1/2016 7:30 17:30 10
38 12/2/2016 7:30 17:30 10
39 12/3/2016 7:30 17:30 10
40 12/4/2016 7:30 17:30 10
41 12/5/2016 7:30 17:30 10
42 12/6/2016 7:30 17:30 10
43 12/7/2016 7:30 17:30 10
44 12/8/2016 7:30 17:30 10

45 12/1/2016 7:30 16:30 8

46 1/1/2017 7:00 14:30 7.5

47 27/1/2017 9:30 12:30 3

48 2/9/2017 8:00 17:00 9

49 2/10/2017 7:00 12:00 5

50 14/2/2017 9:00 16:00 7


51 23/2/2017 15:00 16:00 1
52 4/24/2017 14:00 17:30 3.5
53 4/25/2017 7:30 17:30 10
54 4/26/2017 7:30 17:30 10
55 4/27/2017 7:30 17:30 10
56 4/28/2017 7:30 17:30 10
57 4/29/2017 7:30 17:30 10
58 4/24/2017 16:00 17:30 1.5
59 4/25/2017 7:30 17:30 10
60 4/26/2017 7:30 17:30 10
61 4/27/2017 7:30 17:30 10
62 4/28/2017 7:30 17:30 10
63 4/27/2017 11:00 17:00 6
64 4/25/2017
65 5/22/2017 14:00 17:00 3

GRAN
HCB's records of service provided to HVT
COST (MZN)/Per unit
Request made via mail
Mobilization Demobilization

Fork Lift for Removal of Steel


Structures 35,000.00 35,000.00
email dated 12/09/2016;

Use of Crane Trucks (Forklift) 35,000.00 35,000.00


email dated 20/09/2016;

10,000.00 10,000.00
10,000.00 10,000.00
Aircompressor - to break 10,000.00 10,000.00
concrete (existing ground);
- Note that Diesel was purchased 10,000.00 10,000.00
by contractor; 10,000.00 10,000.00
- HCB labour force used
email dated 14/09/2016; 10,000.00 10,000.00
10,000.00 10,000.00
10,000.00 10,000.00

Repair TLB

Gate Access

10,000.00 10,000.00
Aircompressor - to break
concrete (rock) email dated 10,000.00 10,000.00
18/10;
Excavator was used to remove 10,000.00 10,000.00
rocks;
HCB's truck to remove rocks
from sitr 10,000.00 10,000.00

10,000.00 10,000.00

10,000.00 10,000.00
Aircompressor - to break 10,000.00 10,000.00
concrete (fence) email dated
25/10 10,000.00 10,000.00

10,000.00 10,000.00

Use of Forklift 35,000.00 35,000.00


email dated 10/11/2016;

10,000.00 10,000.00
10,000.00 10,000.00
10,000.00 10,000.00
10,000.00 10,000.00
10,000.00 10,000.00
10,000.00 10,000.00
10,000.00 10,000.00
10,000.00 10,000.00

Use of Air compressor


email dated 14/11/2016;
10,000.00 10,000.00
10,000.00 10,000.00
Use of Air compressor 10,000.00 10,000.00
email dated 14/11/2016; 10,000.00 10,000.00
10,000.00 10,000.00
10,000.00 10,000.00
10,000.00 10,000.00
10,000.00 10,000.00
10,000.00 10,000.00
10,000.00 10,000.00
10,000.00 10,000.00
10,000.00 10,000.00
10,000.00 10,000.00
10,000.00 10,000.00

Use of Forklift 35,000.00 35,000.00

Use of Fork lift


Contacted via phone on the 31st 35,000.00 35,000.00
Dec
Use of forklift 35,000.00 35,000.00

Use of forklift 35,000.00 35,000.00

Use of forklift 35,000.00 35,000.00

Use of forklift 35,000.00 35,000.00


Use of crane with basket 35,000.00 35,000.00
35,000.00 35,000.00
35,000.00 35,000.00
35,000.00 35,000.00
30 Ton crane with basket
35,000.00 35,000.00
35,000.00 35,000.00
35,000.00 35,000.00
35,000.00 35,000.00
35,000.00 35,000.00
Buldozer 35,000.00 35,000.00
35,000.00 35,000.00
35,000.00 35,000.00
Teodolito
12 Manilhas de 120 KN
30 Ton crane 35,000.00 35,000.00

GRAND TOTAL
Claim Pipe re-routing (44,431,66) + EMVT Foundations (17,344,98)
r unit Total COST (MZN) including IVA
per hours (17%)

6,000.00 117,000.00

6,000.00 117,000.00

3,000.00 40,950.00
3,000.00 40,950.00
3,000.00 54,990.00
3,000.00 54,990.00
3,000.00 54,990.00
3,000.00 51,480.00
3,000.00 51,480.00
3,000.00 51,480.00

0.00

0.00

3,000.00 58,500.00

3,000.00 58,500.00

3,000.00 58,500.00

3,000.00 58,500.00

3,000.00 58,500.00

3,000.00 58,500.00
3,000.00 58,500.00

3,000.00 58,500.00

3,000.00 58,500.00

6,000.00 117,000.00

3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00
3,000.00 58,500.00

6,000.00 138,060.00

6,000.00 134,550.00

6,000.00 102,960.00

6,000.00 145,080.00

6,000.00 117,000.00

6,000.00 131,040.00
6,000.00 88,920.00
6,000.00 106,470.00
6,000.00 152,100.00
6,000.00 152,100.00
6,000.00 152,100.00
6,000.00 152,100.00
6,000.00 152,100.00
3,500.00 88,042.50
3,500.00 122,850.00
3,500.00 122,850.00
3,500.00 122,850.00
3,500.00 122,850.00
0.00
0.00
6,000.00 102,960.00

4,972,792.50

EURO 72,069.46
VT Foundations (17,344,98) 61,776.13