Download as pdf
Download as pdf
You are on page 1of 11
ee) NL 9s tiez/Ai/91 Molt er _s10re)0 vonron soa en 0s Jo aoe one) arb uersader | ers 5 ne same doy pun 8 pao 99 ose yen ay pe Pte 9 sepa sng Wai Gul eGR! 9OE HOPG UM Og SSN TST FT Pap ET} aus syynson 74 mon oy pA sey Bau en jo weds a Vee DT aT TY BIST ATS Wp om ep UENS pep aM SH Pe SNA RIE A =a Frag oT UAT HDA 2-v2gor une psagunaoge una sins quely me soqeporee ran ed] 0 unt: pevupoes 90 stndeEnepu pee s00 0 uepunut| (Gas are Por opapaveo=K em poe HTN a esndse oy panngn 9313345 Se se a pe ste fed} 306 pe "BE ae dena] wou oa NO Sa] ED TET ERT ORT TTS| “Wal poe vou oad eo UA, Tie wna yt raid oes Dome aD Ton pu pa Fe Nea GN oN MET TT ST v1 vale oe Koo NTS Ha Poe VOU 9 Bos UOT APO MeN ATT] “ISR DEAD Hing ON FS Pa OTA] —E TT A TATE ays ToRRTsou Ta TER] —F DeLunl veyed oes Loom Ta SOT pon Hah UAT iene FaNT —P aT Tape saa TOE TaN aT SF TT RTT RTT TOP wa = TET RTT RE CERT] Tao TROT Te z WEE) evo eae pues a9 99 pas "Si pe na RT RTI ST ze z Saar Paupon syarsum Po RATT "Won pa BOR wae HTS POA svav20a 40 Wdwee¥ 40s TWLIIWENS WO SINSHUNOD aya ments Method Statement for Installation of Masonry Block Work DOCUMENT TITLE: INTERNATIONAL CONVENTION CENTER Method Statement for installation of Masonry Block Work Prepared ewe ye ewe Reseed Method Statement for 1xhiasowied) | Installation of Masonry Block Work poy ence 1.0 Score. 2.0 PURPOSE 3.0 REFERENCES 40 DEFINITIONS: 5.0. RESPONSIBILITIES 58. SAFETYENGINEER 60 EQUIPMENTS 10 HEALTH AND SAFETY HAZARDS PROCEDURE 81 PREPARATION 82 INSTALLATION 9 10.0 ATTACHMENTS MONITORING AND INSPECTION Method Statement for ‘amiaibus801 | Installation of Masonry Block | [EMH ssc Work 20 30 60 procedure ito describe the methods for ntl of masonry Secion shown on Architectural plan or crawings. RPO: ‘Te purpose of tis Method statement is to establish guidelines adsressing all the tre thet’ masonry block work acti 34 Project Technical Speciicatons 3.2 Approved Shop Drawings: Pan and Detals 33 Approved Material Submit: ll types of Blocks a per ste required including socnssones 3.4 Approved inspection and Testing Plan 3.5. Approved Project Safety plan and procedues DEFINITIONS ac ‘AbAunaaip Contracting Company Method Statement for Bidar | Installation of Masonry Block | [BBE sass SEE ew 1 ad) Method Statement for Sawicidvsesl | Installation of Masonry Block | [BBP ssininn Work 80 PROCEDURE 8:1 Preparation ance am MEP for ll the MEP rings and bult-n tems 81.5 Ensure al block materials, accessories and method statement are proved. Method Statement for Installation of Masonry Block podion and approval forthe surface preparation proceed fo instalation. very 2 courses (700mm long) on ing os on comer slant w/ backer red up to 2 hou fre rated rection 28 per approved sho leveled and vertical joints sha be aligned be done by power driven saw. peat? Method Statement for astidvses) | Installation of Masonry Block | [AMM irimine Work 182.45 Maintain oyng of blocks on an allowable vertical and horizontal afgnment 8.2.46 Bul the block work tothe respective dimension, thickness and height ln 8.0 MONITORING AND INSPECTION nt day montoring and inspection to ensure progressing 1 secordance with the approved plan 400 ATTACHMENTS. 10.1. Approved Material Submittal fo Block works and Accessories 10.2 Block work drawing deals eso: ptr i dil cael

You might also like