ee) NL 9s tiez/Ai/91
Molt er
_s10re)0 vonron soa en 0s Jo aoe one) arb uersader |
ers
5 ne same doy pun 8 pao 99 ose yen ay pe Pte 9
sepa sng Wai Gul eGR! 9OE HOPG UM Og SSN
TST FT Pap ET}
aus syynson 74 mon oy pA sey Bau en jo weds a
Vee DT aT TY BIST ATS
Wp om ep UENS pep aM SH Pe SNA RIE A
=a Frag oT UAT HDA
2-v2gor une psagunaoge una sins quely me soqeporee ran ed]
0 unt: pevupoes 90 stndeEnepu pee s00 0 uepunut|
(Gas are Por opapaveo=K em poe HTN a
esndse oy panngn 9313345 Se se a pe ste fed} 306 pe
"BE ae dena] wou oa NO Sa]
ED
TET ERT ORT TTS| “Wal poe vou oad eo UA,
Tie wna yt raid oes Dome aD Ton pu pa Fe Nea GN oN MET TT
ST v1 vale oe Koo NTS Ha Poe VOU 9 Bos UOT APO MeN ATT]
“ISR DEAD Hing ON FS Pa OTA] —E
TT A TATE ays ToRRTsou Ta TER] —F
DeLunl veyed oes Loom Ta SOT pon Hah UAT iene FaNT —P
aT Tape saa
TOE TaN aT SF TT RTT RTT TOP wa =
TET RTT RE CERT] Tao TROT Te z
WEE) evo eae pues a9 99 pas
"Si pe na RT RTI ST ze z
Saar Paupon syarsum Po RATT
"Won pa BOR wae HTS POA
svav20a 40 Wdwee¥ 40s TWLIIWENS WO SINSHUNODaya
ments
Method Statement for
Installation of Masonry Block
Work
DOCUMENT TITLE:
INTERNATIONAL CONVENTION CENTER
Method Statement for installation of Masonry Block Work
Prepared
ewe ye
ewe
ReseedMethod Statement for
1xhiasowied) | Installation of Masonry Block
Work
poy ence
1.0 Score.
2.0 PURPOSE
3.0 REFERENCES
40 DEFINITIONS:
5.0. RESPONSIBILITIES
58. SAFETYENGINEER
60 EQUIPMENTS
10 HEALTH AND SAFETY HAZARDS
PROCEDURE
81 PREPARATION
82 INSTALLATION
9
10.0 ATTACHMENTS
MONITORING AND INSPECTIONMethod Statement for
‘amiaibus801 | Installation of Masonry Block | [EMH ssc
Work
20
30
60
procedure ito describe the methods for ntl of masonry
Secion shown on Architectural plan or crawings.
RPO:
‘Te purpose of tis Method statement is to establish guidelines adsressing all the
tre thet’ masonry block work acti
34 Project Technical Speciicatons
3.2 Approved Shop Drawings: Pan and Detals
33 Approved Material Submit: ll types of Blocks a per ste required including
socnssones
3.4 Approved inspection and Testing Plan
3.5. Approved Project Safety plan and procedues
DEFINITIONS
ac ‘AbAunaaip Contracting CompanyMethod Statement for
Bidar | Installation of Masonry Block | [BBE sass
SEE
ew 1 ad)Method Statement for
Sawicidvsesl | Installation of Masonry Block | [BBP ssininn
Work
80 PROCEDURE
8:1 Preparation
ance am MEP for ll the MEP
rings and bult-n tems
81.5 Ensure al block materials, accessories and method statement are
proved.Method Statement for
Installation of Masonry Block
podion and approval forthe surface preparation
proceed fo instalation.
very 2 courses (700mm long) on
ing os on comer
slant w/ backer red up to 2 hou fre rated
rection 28 per approved sho
leveled and vertical joints sha be aligned
be done by power driven saw.
peat?Method Statement for
astidvses) | Installation of Masonry Block | [AMM irimine
Work
182.45 Maintain oyng of blocks on an allowable vertical and horizontal afgnment
8.2.46 Bul the block work tothe respective dimension, thickness and height ln
8.0 MONITORING AND INSPECTION
nt day montoring and inspection to ensure
progressing 1 secordance with the approved plan
400 ATTACHMENTS.
10.1. Approved Material Submittal fo Block works and Accessories
10.2 Block work drawing deals
eso: ptridil cael