Capital Improvement Programme: City Development Plan, Raipur City
Capital Improvement Programme: City Development Plan, Raipur City
The City investment plans have brought out a detailed examination of various elements
involved in the plan and highlight the options for implementing the programmes under
various plan periods. Therefore to work out a viable capital improvement programme, it is
suggested to select the short-term programme identified from various elements involved in
the City Investment plan. The implementation of short-term programme i.e. 7 years City
Development programme, aiming to bring out the beneficial projects required to improve the
existing level of services for the future development of the town.
The projects identified as part of the programme are discussed with stakeholders during the
consultation meeting and extensive discussion held with them. In addition, the issues
highlighted in each element are discussed with the elected representatives, Municipal
officials and other stakeholders in detail for inclusion of the same in the report.
An extensive
discussion held with
Mayor in Council and
Commissioner in
council
165
City Development Plan, Raipur City Capital Improvement Programme
• Project Identification
• Project Selection
• Investment Requirement for Capital Improvement Programme
Project selection was carried out to short-list the immediate projects that can be taken up to
improve the level of services based on the following:
• To bridge the gap in the level of services to meet the need for the immediate and
future population
Based on the above selection criteria, the projects identified as part of short-term
programme are selected for implementation for the financial year 2006-2012. The projects
that can be taken up as part of the 7-year programme, and investment requirement for
implementation carried out in the next section.
The investment required for 7 years Capital Improvement programmes was carried out
based on the element identified as part of CDP.
166
City Development Plan, Raipur City Capital Improvement Programme
The water supply programme is being implemented in the town at a capital cost of Rs
37483 Lakhs, which can satisfy the water supply, demand for 7 years period.
Raipur is not provided with Under Ground Drainage systems. To cover the town with pucca
sanitation system, the ULB has initiated an effort to obtain the financial assistance from
Central and State Governments.
Apart from that, the local body has identified to strengthen the Kutcha drains into new pucca
drains and procuring storm water drain cleaning equipment for regular maintenance of
existing drains in the town. This requires an investment of Rs 11037 lakhs for the next 7
years.
The existing solid waste collection system covers 59 % of the total waste collection. This
reflects the high deficiency in collection of remaining waste of 41%, which are left behind in
the town. It is anticipated that the gap may expect to widen future due to increase in
population with same percentage of solid waste collection. Therefore, there is a need to
strengthen this sector with additional storage material cost from storage to transportation Rs
780 lakhs and Rs 5286Lakhs for treatment plants including the purchase of land for
treatment facilities, equipment and other facilities. The total investment requirement for this
sector is Rs 6066 Lakhs for 7 years.
The Raipur Municipal Corporation proposes to provide public transport facility. It is also
proposed to upgrade all the existing roads with BT and Cement Concrete surface. This will
also provide Vehicle transshipment facility, pedestrian subway, mini bus parking and
167
City Development Plan, Raipur City Capital Improvement Programme
8.3.6 Others
Table: 8.1 Total Investment required for 7-years Capital Improvement Programme
Investment required
Sectors % to total
( Rs. In Crores)
Water Supply 374.83 30.89
Sewerage and Sanitation 132.07 10.88
Storm water drainage 110.37 9.09
Solid Waste Management 60.66 5.00
Roads and Transport 275.00 22.66
Others (Shifting of Dairies From Inner
28.69 2.36
Areas to Outer Ares)
Slum Rehabilitation 232.00 19.12
Total 1213.62 100.00
The above investment priorities are need to be evaluated based on the financial status of
the ULB through Financial Operating Plan for Identifying their resource generation capacity
to sustain for undertaking capital works. Mentioned in Chapter 6
168
City Development Plan, Raipur City Capital Improvement Programme
169
City Development Plan, Raipur City Capital Improvement Programme
Bus stands √ √ √
Taxi stands √ √ √
Roads (construction/improvements)
ROB's
170
City Development Plan, Raipur City Capital Improvement Programme
Pedestrian subways/FOBs' √ √ √
Intersection improvements √ √ √ √ √ √ √
171
City Development Plan, Raipur City Capital Improvement Programme
172
City Development Plan, Raipur City Capital Improvement Programme
Sub Total 1270 1321 1459 1523 1682 1810 1972 11037
Sewerage and sanitation Three STP’s 35 MGD 600 630 650 700 760 800 860 5000
Laying of Secondary and Tertiary Sewers 300 300 500 500 650 650 527 3427
Laying of Main Sewers 125 200 200 300 300 250 225 1600
173
City Development Plan, Raipur City Capital Improvement Programme
Surface Drainage Network in all areas 125 150 200 200 250 225 210 1360
Sub total 1450 1642 1755 1925 2192 2160 2082 13207
Roads(construction/improvements)
Laying/improvement/widening of arterial roads 500 500 500 1000 1000 500 500 4500
174
City Development Plan, Raipur City Capital Improvement Programme
ROB's
New bridges (ROB) 200 200 500 450 400 400 400 2550
Pedestrian subways/FOBs' 200 200 500 450 400 400 400 2550
Laying of ring roads and bypasses 500 1000 1000 1000 1000 1000 1000 6500
Sub Total 2660 3920 5040 5500 4480 3200 2700 27500
Construction of OHSR/GLSR (20*5ML) 800 1200 1000 700 300 300 200 4500
Clear Water Pumping Mains (55 km) 800 1200 1200 1000 800 800 800 6600
Extension of distribution network with in the city
750 750 900 900 950 950 900 6100
(222km)
Development of distribution in newly developed
300 350 500 600 500 500 500 3250
areas (130km)
175
City Development Plan, Raipur City Capital Improvement Programme
Sub Total 5029 6597 6971 5784 4860 4273 3969 37483
176
City Development Plan, Raipur City Capital Improvement Programme
Training and Institutional Strengthening 1.00 1.00 1.00 1.00 1.00 4.00
177
City Development Plan, Raipur City Capital Improvement Programme
8.4 Recommendations relating to Local Body availing loan for 7-Year Capital
Improvement Programme
Raipur Municipal Corporation possesses limited capacity to absorb the future investment for
implementing various Capital Improvement programmes formulated as part of the CDP. The
options available to improve the financial status of Raipur Municipal Corporation is as
follows:
• Regular repayment of annuities for the existing and new loans Collection of
deposit and revenue through new House service connection.
Based on the recommendations and the amount of capital investment required for a tune of
Rs. 121362 Lakhs over a period of 7 years. It is very difficult to fund the new projects based
on the surplus available from the Raipur Municipal Corporation. Therefore, the ULB may
sick the help of Financial Institutions like TUFISIL, HUDCO, ILFS etc, for obtaining the
required loan amount to implement the new capital works.
Refer Chapter 7 for Financial Status of Raipur Municipal Corporation, Which highlight the
existing financial status and various alternatives to undertake the new capital works with out
revision and with revision, and Grant for 30% for service projects.
178
City Development Plan, Raipur City Capital Improvement Programme
Existing
Knowledge
Workshop for Workshop for
Compilation
Commitment Stakeholder
and
Identification
Counterpart
Implementation set-up
& Monitoring
City Stakeholder
Assistance 8 Identification &
Program 1 Participation
Formulation 7 Planning
2 Workshop for
Discussion on the Issue
6 3 Identification
Draft & Issues &
Responsibility 4 Constraints
5
Assignment Opportunity
Draft Strategy
Identification
Making
Workshop for
Prioritization
179