Tramo Material N Buzon Diametro (MM) Longitud (M) Diametro (M) Cota de Terreno (MSNM)

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

COTA DE

DIAMETRO MATERIAL LONGITUD DIAMETRO


TRAMO n BUZON TERRENO
(mm) (m) (m) (msnm)
TUBERIA-1 160 PVC 0.009 45 Bz-1 1.20 200.00
TUBERIA-2 160 PVC 0.009 45 Bz-2 1.20 199.00
TUBERIA-3 160 PVC 0.009 25 Bz-3 1.20 198.40
TUBERIA-4 160 PVC 0.009 25 Bz-4 1.20 197.00
TUBERIA-5 160 PVC 0.009 25 Bz-5 1.20 195.60
TUBERIA-6 160 PVC 0.009 25 Bz-6 1.20 194.20
TUBERIA-7 160 PVC 0.009 30 Bz-7 1.20 192.80
TUBERIA-8 160 PVC 0.009 30 Bz-8 1.20 198.60
TUBERIA-9 160 PVC 0.009 45 Bz-9 1.20 198.00
TUBERIA-10 160 PVC 0.009 30 Bz-10 1.20 197.20
TUBERIA-11 160 PVC 0.009 45 Bz-11 1.20 196.60
TUBERIA-12 160 PVC 0.009 45 Bz-12 1.20 195.20
TUBERIA-13 200 PVC 0.009 85 Bz-13 1.20 199.00
TUBERIA-14 200 PVC 0.009 85 Bz-14 1.20 197.60
TUBERIA-15 200 PVC 0.009 85 Bz-15 1.20 196.20

COTA
DESCARGA TERRENO
PTAR 192.60
COTA DE
COTA DE TAPA PROFUNDIDAD DEMANDA
FONDO BUZON
(msnm) (m) (L/s)
(msnm)
200.00 199.00 1.00 Bz-1 0.60
199.00 197.80 1.20 Bz-2 0.80
198.40 197.20 1.20 Bz-3 0.20
197.00 195.80 1.20 Bz-4 0.40
195.60 194.40 1.20 Bz-5 1.20
194.20 193.00 1.20 Bz-6 0.60
192.80 191.60 1.20 Bz-7 0.80
198.60 197.60 1.00 Bz-8 0.20
198.00 196.80 1.20 Bz-9 1.20
197.20 196.20 1.00 Bz-10 0.60
196.60 195.40 1.20 Bz-11 0.80
195.20 194.00 1.20 Bz-12 0.20
199.00 198.00 1.00 Bz-13 1.20
197.60 196.60 1.00 Bz-14 0.60
196.20 195.20 1.00 Bz-15 0.80

COTA DE
COTA DE TAPA PROFUNDIDAD
FONDO
192.60 192.00 0.60