12 MM 16 MM 6,565.03 25 MM - 20 MM - : Isolated Footing Formworks (M2) Reinforcement (KGS) Concrete (M3)

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 12

SUMMARY

ISOLATED FOOTING FORMWORKS (m2) REINFORCEMENT (kgs) CONCRETE (m3)

12 mm
16 mm 6,565.03
25 mm -
20 mm -
Grade 60 6,565.00

163.00 94.00

413.00 m2
8,418.00 kgs
169.00 m3
WALL FOOTING/FTB FORMWORKS STEEL BAR CONCRETE

1,853.00

Grade 40

250.00 1,853.00 75.00


TABLE OF LAP SPLICE & ANCHORAGE LENGTH
BAR UNIT AREA ANCH. STANDARD HOOK LENGTH OF EMBEDMENT/ LAP SPLICE MIN. LAP SPLICE COLUMN LDh
DIAMETER WEIGHT LENGTH LENGTH OF COL. REINF,
INDIVIDUAL BARS
m TENSION BARS COMP BARS TIED SPIRAL
mm kg/m mm m 90 180 135 TOP BAR BOT BAR TOP BAR BOT BAR W/ TIES W/ SPIRAL m m m
10 mm 0.617 0.600 0.160 0.110 0.120 0.390 0.390 0.420 0.300 0.300 0.300 0.300 0.300 0.15
12 mm 0.889 0.600 0.200 0.120 0.130 0.420 0.390 0.420 0.300 0.300 0.300 0.300 0.300 0.15
16 mm 1.580 0.670 0.260 0.130 0.160 0.830 0.640 0.870 0.620 0.520 0.470 0.490 0.490 0.25
20 mm 2.469 0.840 0.320 0.160 0.320 1.040 0.810 1.100 0.780 0.650 0.580 0.620 0.620 0.31
25 mm 3.858 1.050 0.400 0.200 0.400 1.640 1.260 1.400 1.000 0.800 0.730 0.970 0.970 0.39
28 mm 4.840 1.190 0.480 0.260 1.830 1.400 1.530 1.090 0.900 0.820 1.080 1.080 0.44
32 mm 6.327 1.550 0.550 0.290 2.090 1.610 1.740 1.240 1.030 0.930 1.240 1.240 0.50
36 mm 8.000 1.960 0.850 0.360 2.350 1.810 2.000 1.400 1.200 1.050 1.390 1.390 0.56
PROJECT : Windjammer Resort and Spa
LOCATION : Masbate City

FOOTING SCHEDULE EXCAVATION (m3)

FOOTING Height/ Footing


QTY L W P Area VOLUME
MARK Thickne Depth
ss

F1 6.00 2.80 2.80 13.60 11.56 1.50 0.35 17.34

F2 6.00 2.50 2.50 12.40 9.61 1.50 0.35 14.42

F3 12.00 2.70 2.70 13.20 10.89 1.50 0.35 16.34

F4 4.00 2.30 2.30 11.60 8.41 1.50 0.30 12.62

F5 6.00 2.40 2.40 12.00 9.00 1.50 0.30 13.50

F6 4.00 2.00 2.00 10.40 6.76 1.50 0.30 10.14

F7 4.00 1.50 1.50 8.40 4.41 1.50 0.30 6.62

F8 17.00 1.20 1.20 7.20 3.24 1.50 0.30 4.86

MF1 1.00 2.70 2.90 13.60 11.55 1.50 0.30 17.33

WF1 12.00 5.70 0.60 15.00 7.56 0.25 0.30 1.89

WF2 5.00 5.00 0.60 13.60 6.72 0.25 0.30 1.68

WF3 4.00 5.00 0.60 13.60 6.72 0.60 0.30 4.03

FTB1 47.00 5.70 0.20 14.20 5.04 0.10 0.30 0.50

FTB2 12.00 3.00 0.20 8.80 2.88 0.20 0.30 0.58

Volume
Gravel
EXCAVATION (m3) Backfill Material (m3)
Bedding (m2)

TOTAL TOTAL Column Footing VOLUME TOTAL


Area
Volume Area Volume Volume of Fill Volume

104.04 7.84 47.04 9.02 2.74 5.58 33.48

86.49 6.25 37.50 7.19 2.19 5.04 30.24

196.02 7.29 87.48 8.38 2.55 5.40 64.80

50.46 5.29 21.16 6.35 1.59 4.68 18.72

81.00 5.76 34.56 6.91 1.73 4.86 29.16

40.56 4.00 16.00 4.80 1.20 4.14 16.56

26.46 2.25 9.00 2.70 0.68 3.24 12.96

82.62 1.44 24.48 1.73 0.43 2.70 45.90

17.33 7.83 7.83 9.40 2.35 5.58 5.58

22.68 3.42 41.04 (0.17) 1.03 1.04 12.42

8.40 3.00 15.00 (0.15) 0.90 0.93 4.65

16.13 3.00 12.00 0.90 0.90 2.23 8.93

23.69 1.14 53.58 (0.23) 0.34 0.39 18.33

6.91 0.60 7.20 (0.06) 0.18 0.46 5.47

763.00 Area 414.00 Volume 307.00

41.40
PROJECT : Windjammer Resort and Spa
LOCATION : Masbate City

FOOTING SCHEDULE CONCRETE (m3)

TOTAL
Mark QTY L W T P Area VOLUME
Volume

F1 6.00 2.80 2.80 0.35 11.20 7.84 2.74 16.46


6.00 2.80 2.80

F2 6.00 2.50 2.50 0.35 10.00 6.25 2.19 13.13


6.00 2.50 2.50

F3 12.00 2.70 2.70 0.35 10.80 7.29 2.55 30.62


12.00 2.70 2.70

F4 4.00 2.30 2.30 0.30 9.20 5.29 1.59 6.35


4.00 2.30 2.30

F5 6.00 2.40 2.40 0.30 9.60 5.76 1.73 10.37


6.00 2.40 2.40

F6 4.00 2.00 2.00 0.30 8.00 4.00 1.20 4.80


4.00 2.00 2.00

F7 4.00 1.50 1.50 0.30 6.00 2.25 0.68 2.70


4.00 1.50 1.50

F8 17.00 1.20 1.20 0.30 4.80 1.44 0.43 7.34


17.00 1.20 1.20

MF1 1.00 2.70 2.90 0.30 11.20 7.83 2.35 2.35


1.00 2.70 2.90

Volume 94.00

PhP 564,000.00
FORMWORKS (m2) REINFORCEMENT (kgs)

TOTAL
AREA Bar Designation Spacing No. Of Bars Bar LENGTH
AREA

3.92 23.52 Longitudinal 0.20 15.00 16 mm 2.65


Transversal 0.20 15.00 16 mm 2.65

3.50 21.00 Longitudinal 0.10 26.00 16 mm 2.35


Transversal 0.10 26.00 16 mm 2.35

3.78 45.36 Longitudinal 0.15 19.00 16 mm 2.55


Transversal 0.15 19.00 16 mm 2.55

2.76 11.04 Longitudinal 0.20 13.00 16 mm 2.15


Transversal 0.20 13.00 16 mm 2.15

2.88 17.28 Longitudinal 0.20 13.00 16 mm 2.25


Transversal 0.20 13.00 16 mm 2.25

2.40 9.60 Longitudinal 0.15 15.00 16 mm 1.85


Transversal 0.15 15.00 16 mm 1.85

1.80 7.20 Longitudinal 0.15 11.00 16 mm 1.35


Transversal 0.15 11.00 16 mm 1.35

1.44 24.48 Longitudinal 0.10 13.00 16 mm 1.05


Transversal 0.10 13.00 16 mm 1.05

3.36 3.36 Longitudinal 0.10 30.00 16 mm 2.55


Transversal 0.10 28.00 16 mm 2.75

Area 163.00

PhP 138,550.00
CEMENT (kgs)

TOTAL Unit mass


HOOK mass (kgs)
LENGTH (m) (kg/m)

0.13 41.70 1.58 395.32


0.13 41.70 1.58 395.32

0.13 64.48 1.58 611.27


0.13 64.48 1.58 611.27

0.13 50.92 1.58 965.44


0.13 50.92 1.58 965.44

0.13 29.64 1.58 187.32


0.13 29.64 1.58 187.32

0.13 30.94 1.58 293.31


0.13 30.94 1.58 293.31

0.13 29.70 1.58 187.70


0.13 29.70 1.58 187.70

0.13 16.28 1.58 102.89


0.13 16.28 1.58 102.89

0.13 15.34 1.58 412.03


0.13 15.34 1.58 412.03

0.13 80.40 1.58 127.03


0.13 80.64 1.58 127.41

6,565.00

PhP 367,640.00
0.85
PROJECT : Windjammer Resort and Spa
LOCATION : Masbate City

FOOTING DETAILS CONCRETE (m3) FORMWORKS

TOTAL
QTY L W T P Area VOLUME AREA
Volume

WF1 12 5.70 0.60 0.3 12.60 3.42 1.03 12.31 3.42


WF1 12 5.70 0.60

WF2 5 5.00 0.60 0.3 11.20 3.00 0.90 4.50 3.00


WF2 5 5.00 0.60

WF3 4 5.00 0.60 0.3 11.20 3.00 0.90 3.60 3.00


WF3 4 5.00 0.60

FTB1 47 5.70 0.60 0.3 12.60 3.42 1.03 48.22 3.42


FTB1 47 5.70 0.60

FTB2 12 3.00 0.60 0.3 7.20 1.80 0.54 6.48 1.80


FTB2 12 3.00 0.60

Volume 75.00 Area


FORMWORKS STEEL BARS

TOTAL No. Of TOTAL UNIT WT


Bar Designation Spacing Bar LENGTH HOOK
AREA Bars LENGTH RSB

41.04 Longitudinal 3 12 mm 5.55 0.12 17.01 0.889


Transversal 0.30 20 12 mm 0.45 0.12 11.40 0.889

15.00 Longitudinal 3 12 mm 4.85 0.12 14.91 0.889


Transversal 0.30 18 12 mm 0.45 0.12 10.26 0.889

12.00 Longitudinal 3 12 mm 4.85 0.12 14.91 0.889


Transversal 0.30 18 12 mm 0.45 0.12 10.26 0.889

160.74 Longitudinal 3 12 mm 5.55 0.12 17.01 0.889


Transversal 0.30 20 12 mm 0.45 0.12 11.40 0.889

21.60 Longitudinal 3 12 mm 2.85 0.12 8.91 0.889


Transversal 0.30 11 12 mm 0.45 0.12 6.27 0.889

250.00
Weight in
Kilograms

181.46
121.62

66.27
45.61

53.02
36.48

710.73
476.33

95.05
66.89

1,853.00

You might also like