Download as pdf
Download as pdf
You are on page 1of 1
LIZ Pembinaan Usadaya won FOO sesh 276s re. 0 ara. oe, [/ACE ES 9 ‘Tas 7310718 Fox: 0759718 mal wsadye?iSgmal com OurRef _ : PUDIETDSB-BeoTropies/FallingMain/16(18) Date 138 July 2017 ‘Mis Ki. Goh & Associates Sdn Bhd 15.02 Susur Dewata | Jalan Dewata ‘Taman Larkin Perdana {80350 Johor Bahra Johor Darul Takin, Dear Si, PROPOSED WATER FALLING MAIN AND ANCILLARY WORKS FOR STRATA, HOUSING DEVELOPMENT AT LOT PID 144145 (LOT 117743), PLOT 1 TO 5, LIVING GARDEN, ECO TROPICS, MUKIM PLENTONG, PASI GUDANG, JOHOR FOR M/S ECO TROPICS DEVELOPMENT SDN BHD Magnetic Flowmeter With eference tothe above, we would lke to informed that during ar test for 7500 mm pipe With Encik Fan, SAJ Inspector dated 13/7/2017, he had highlighted that magnetic flow meter ‘are required for 750mm and 3000mm to outlet pipe fom reservoir which tated and found in SAS approved overall concept approval drawing plan However, we are regret to inform tha the flow meters are not captured in our contract and also not provided in constuction drawing. We would appreciate if your good side can confi on ‘the above said mater as soon as possible so that we ean place order for it s the goods ordering, may take along time for delivery Thank you, Yours faithfully PEMBINAAN USADAYA bp (v) ¥e Project Director Ms Eco Tropics Development Sdn Bhd — copy enclosed File: Eco Tropes Falling Main

You might also like