SUMMARY OF DOCUMENTS BETWEEN CONSILIUM AND IDOM

PENDING FOR
SR. TOTAL COMMENTED
NO DESCRIPTION DOCUMENTS SUBMITTED FRESH DOCUMENTS
SUBMISSION

1 PROJECT DOCUMENTS 3 3 0 0
2 DATASHEETS 15 15 0 0

3 LAYOUT DRAWINGS 30 29 0 10

4 GENERAL DOCUMENTS 21 14 7 4

TOTAL 69 61 7 14

SUMMARY OF DOCUMENTS BETWEEN CONSILIUM AND OWNER / OWNER ENG

PENDING FOR
SR. TOTAL COMMENTED
NO DESCRIPTION DOCUMENTS SUBMITTED FRESH DOCUMENTS
SUBMISSION

1 PROJECT DOCUMENTS 3 3 0 0
2 DATASHEETS 15 15 0 0

3 LAYOUT DRAWINGS 30 28 2 1

4 GENERAL DOCUMENTS 21 5 16 0

TOTAL 69 51 18 1
ETWEEN CONSILIUM AND IDOM
PENDING WITH APPROVED
IDOM/SEPCO FROM IDOM REMARKS BY CONSILIUM
FOR REVIEW

2 1
0 15

3 17 * Major of the commented documents


are regarding Civil foundation. Consilium
confirms to resubmit all the drawings on
or before 07.07.2017

* Pending fresh submission documents


5 5 shall be submitted only after approval of
layout drawings.
* For Pending Commented documents
shall be submitted on or 07.07.2017
10 38

ONSILIUM AND OWNER / OWNER ENGINEER


PENDING WITH APPROVED
OWNER FROM REMARKS
ENGINEER FOR OWNER/OE
REVIEW
2 1
10 5

* Pending fresh submission


12 15 drawingsshall be submitted only after
approval received from IDOm
* Pending fresh submission documents
shall be submitted only after approval
5 0 received from IDOm and Layout
drawings.
29 21