DEPT.

PEMELIHARAAN UNIT RENDAL HAR MECHANICAL

No Dokumen BEST.TE.02.FR.01
Revisi 0
WORK ORDER LIST Berlaku Efektif
Halaman 1 dari 1
Periode : JAN 2017

WO List

Wor Follow-up Information


k by
Type Target Mechanic
WO Description Finish Team
CM 1. Paryanto Closing (Electrode SS308 OK 1Kg, E6013
BHMCM02/0117 Rekondisi dan Install Impeller Intake Pump No.2 20/12/16 OK46 0.5Kg, Batu Gerinda 100mm dan
Coating Plastic Steel 10gram)
BHMCM03/0117 Setting Scraper Conveyor C#2 ke Hoper C#3 CM 29/12/16 2. Daryono Closing (Majun 1/4Kg)
CM 3. Agung JS Closing (Valve DN20PN100 1Ea dan
BHMCM10/0117 Install Valve Desuperheater Fenting DN20PN100 15/01/17
Packing SWG LP DN20PN100 2Ea)
CM 4. Alvian
BHMCM11/0117 Install Rekondisi Screen Vibro CHS 17/01/17 Closing (Screen Vibro Rekondisi 1Set)
Agus
Cleaning Housing Pump dan Setting Impeller Intake CM 5. Agus H Closing (WD 40 1Tube, Sealtape 1Ea dan
BHMCM12/0117 10/12/16
Pump No.2 Majun 1/4Kg)
Penampalan Kebocoran pipa Suction di Pompa CM 6. Agunawa Closing (Kasa Fiber, Aspal Coating dan
BHMCM13/0117 23/01/17
Domestik No.2 n Majun 1/4Kg)
CM 7. Andri Closing (Wire Rope 19mm IWRC
BHMCM14/0117 Install Wire Rope 19mm Grabe Crane CHS 23/01/17
Dinata (6x34mm))
8. Juni
Ander
9. Septa TP
10. Andre S

RENDAL HAR MECHANICAL Created by OKSILAN


DEPT. PEMELIHARAAN UNIT RENDAL HAR MECHANICAL

No Dokumen BEST.TE.02.FR.01
Revisi 0
WORK ORDER LIST Berlaku Efektif
Halaman 1 dari 1
Periode : JAN 2017

Di Setujui Oleh,

Rusli N.
Spv. Rendal Har

RENDAL HAR MECHANICAL Created by OKSILAN