Document Filing Record
Document Filing Record
HTC, including
subcontractors and
suppliers
(in-coming letters)
1
LTA LETTERS
FROM LTA TO HTC/C&V/&
OTHERS
(in-coming letters)
2
LETTERS
FROM LTA TO HTC/C&V/&
OTHERS
(in-coming letters)
3
LETTERS
FROM Authorities including
LTA,BCA/PUB/PG/NParks
(in-coming letters)
4
HTC (Reply to OKP but
Through LTA)
(outgoing letters)
5
LTA
(outgoing letters)
6
QP(D), QP(TERS), AC
(outgoing letters)
7
Authorities including
LTA,BCA/PUB/PG/
NPArks
(outgoing letters)
8
Minutes of Meeting
LTA/CV/HTC
11A
Minutes of Meeting
11B
MATERIAL
SUBMISSION AND
APPROVAL
BY HUATIONG CONTRACTOR
PTE LTD
12
METHOD
STATEMENTS
BY HUATIONG CONTRACTOR
PTE LTD
14
TEMPORARY
WORKS
BY HUATIONG CONTRACTOR
PTE LTD
15
SITE DAILY
REPORT- HTC
RD259 LOYANG BUS DEPOT
21A
SITE DAILY
REPORT-
C&V
RD259 LOYANG BUS DEPOT
21B
SITE
INSPECTION
FORMS
RD259 LOYANG BUS DEPOT
21B
NON-CONFORMANCE
RECORD
(NCR)
BY C&V ENGINEERING PTE
LTD
24
SITE RECORDS-
CONCRETE TEST
CUBES
BY C&V ENGINEERING PTE
LTD
24A
SQN- SAFETY QUALITY
NOTES
24C
SITE RECORDS- PRE-
STRESSING
24B
SITE RECORDS-
BORED PILING
BY C&V ENGINEERING PTE
LTD
24C1
SITE RECORDS-
PILE LOAD
TEST RESULTS
BY C&V ENGINEERING PTE
LTD
24C2
SITE RECORDS-
PAVEMENT
TEST RESULTS
BY C&V ENGINEERING PTE
LTD
25
SEWER TEST
BY C&V ENGINEERING PTE
LTD
25
NParks
RECORD
BY C&V ENGINEERING PTE
LTD
25
DELIVERY
ORDER
BY C&V ENGINEERING PTE
LTD
31
MONITORING
RESULTS
BY C&V ENGINEERING PTE
LTD
41
MONTHLY
REPORT
BY C&V ENGINEERING PTE
LTD
51
AD HOC
REPORT
BY C&V ENGINEERING PTE
LTD
52
MISCELLANEOUS
REPORT
BY C&V ENGINEERING PTE
LTD
53
SITE
INSTRUCTION-
SAFETY
BY C&V ENGINEERING PTE
LTD
61
SAFETY
MEETING
BY C&V ENGINEERING PTE
LTD
62
SAFETY
MEETING
PGI
BY LTA, C&V, HTC, & OTHERS
62A
SAFETY
REVIEWS
BY C&V ENGINEERING PTE
LTD
63
SAFETY
BRIEFINGS
BY C&V ENGINEERING PTE
LTD
71
GENERAL
BY C&V ENGINEERING PTE
LTD
81