Download as pdf
Download as pdf
You are on page 1of 1
Project Page t Owmerts Location BILL OF MATERIALS: Unit Totar Description of Material Quantity | unit | Oo pe 1. FOUNDATION, CONCRETE COLUMNS, BEAMS AND CONCRETE HOLLOW BLOCKS WALLS _ Portand Cement, ATLAS brand 450 | Bg | 6500 | 2925000 \Weshed Sand 30 | Cum | 25000 7,500.00 Gravel or Crushed Stones 45 | Cum | 35000 | 1575000 Earh Fil 15 | cum | 000 4,350.00 Conc. Hol Bike, 100 x200x 400%, JACKBILT 1350 | Pece | 400 5,400.00 Do, | 150% 200x 400mm, JACKBILT 2300 | Piece | 450 | 1035000 ‘Steel Reinforcing Bars, Deformed: (PAG-ASA brand) 40mm 6.00 meters 350 | Pece | 4500 | 1575000 ‘mm x 6.00 meters 120 | Piece | 9500 | 11,400.00 ‘6mm x 6.00 meters 65 | Pece | 15000 975000 Wire No. 16 for Tying 30 | Kio | 3000 £0000 Common Wre Nai: ‘Somm (2 30 | Kio | 2500 750.00 75mm (3) 25 | Ke | 2500 62500 100mm (6°) 20 | Kio | 2500 500.00 125mm (5) 48 | Kio | 2500 375.00 Fishing Nails: Simm (1-14) 10 | Kio | 2500 250.00 0mm (2) 8 | Kio | 2500 22500 Barren (2-172) 8 | Kio | 2500 200.00 Conerete Nais, 7Smm(3) 3 | Kio | 3800 405.00 Form Lurber, Rough Tanqule: ‘50 Ps, - SOmmx 75mm x 360mm (23% 12) so | sar | 1250 375000 \ 90Pes - SOmmx SOmmx 3 60mm (2*2%12) sso | bak | 1250 450000, Weterproct Piwood, Sm x 4 20mx 240m 18 | Sneet | 20000 1000.00 2. FLOOR FRAMING “ P. Floor Beams, Guij-Rovgh: 2 Pes = SOrme x 200mm x Oem (2°%8°x 10} 2 | Bon ‘3s - 50mm x 250mm x 4 20m (2x10x14") 70 | Bat 5 Pos. SOrnmx 250mm x 360m (2°x10% #2) 100 | Bat Floor Joists and Bridgings, Apitong Rough 30 Pes. «50mm x 150mmx 300m (2x6%10) soo | Bat 40 Pes. SOx 150mm 420m (238%) 560 | Bak Prepared by. Approved: "ARCHTECTIENGINEER “OWNER DATE DATE ‘55 ESTIMATING BILL OF MATERIALS - Tagayun

You might also like