Gate and Diversion schedule

Mail 150 of 1,459


Iswar Rauf (gmail.com)

COMPOSE Promotions 4 new


Primary
Gate and Diversion schedule Social

Inbox (99)
Dear Mr. ... Agung Febrianto BQ ECE POSO 1 PENSTOCK HEADRACE - TERLAMPIR... Agung Febrianto PT. Poso Energy Jl. Raya Narogong Bekasi KM
Starred Considering the effectiveness of 2nd stage diversion of Poso I project, we are proposing the schedule arrangement as follows :
Sent Mail 1. Radial Gate #2 installation and testing.
Supriyanto _ Kebutuhan tangki Oli - Assalamualaykum, wr,wb. Selamat sore pak joko, Kami dari PT. Poso Energy yang bergerak dalam bid
2. Lift Radial gate #2.
Drafts (30)
3. Insert the maintenance gate to Release Sluice #1 (preparation of Radial gate #1 installation)
[Imap]/Trash Procurement,
4. 2nd stage Diversion of Intake Slamet (2) DKM ALAT MONITORING TURBIN - EVALUASI URGENSI Vibrometer adalah alat pengukur Vibrasi Turbin Generator, alat uji

More 5. Radial Gate #1 Installation and testing(safety protected by maintenance gate and sand bag at downstream)
6. Lift maintenanceAgung Febrianto
gate and Radial gate #1. DKM gabungan plat penstock dan PH - keterengan ada di remark nya... Agung Febrianto PT. Poso Energy Jl. Raya Narogong
7. Move the maintenance gate to Release Sluice #3 (under flow condition)
Iswar Google and testing.
8. Radial gate #3 installation New sign-in from Firefox on Linux - New sign-in from Firefox on Linux Hi Iswar, Your Google account iswar@posoenergy.co

Regarding above arrangement


MBudi, me (4)please recommend us for
Fw:: THE DRAFT DOCUMENTS FOR 2ND SHIPMENT - Kita anggap saja, tp isinya bener, tidak usah resume nya yg diliat, de
1. The possibility for lowering the maintenance gate at above situation.
2. Safety consideration for above
me, GEG (4) arrangement. Valve Drawing - Dear Mr. yang, The attached file are our comment for your last drawings. Considering the equipment factory a
3. Another solution if above arrangement not possible to be done.
MBudi, lzm24, Ali (4) Fw: OHC200t - Pada Selasa, 16 Mei 2017 21:59, lzm24 <lzm24@139.com> menulis: Dear sir, We enclose the relevant calcula
Thanks
Agung Febrianto BQ line 1 dan line 2 - terlampir data detail BQ line 1 dan line 2 sesuai dengan Erection drawing. Agung Febrianto PT. Poso En

No recent chats Sans Serif Agung Febrianto Posisi plat penstock poso 1 - Terlampir data plat penstock untuk Poso 1, Status plat yg sdh di site dan akan masuk ke site sert
Start a new one
Agung Febrianto ILUSTRASI PLAT YG SDH ADA - TERLAMPIR POSISI (AREA) PLAT YG SDH DI BELI. KONDISI UNTUK LINE-1 Agung Feb
Send

Recruitment Poso Energy PR Mechanical Engineer - Dear Bu Santi, Berikut kami kirimkan PR untuk permintaan Supervisor & Material Control Mechanic

me .. Muchammad, Jack (20) Inquiry of Vane Axial Fan - Quotation terakhir dari Air Trade Singapore utk exhaust fan Best Regards Iswar Rauf Mechanical E

1 of 1 5/18/17, 4:56 PM