Table 1: Existing Road Features at RAMP 3

No Items Site Visit Photos

View from Ramp 3 towards Shah


Alam Interchange (direction is
marked by arrow), street lights
Street Lights
are located 40 m apart along the
ramp.
1. 10 street lights will be removed
in the ramp upgrade project

2. Existing specifications:
1
a) Type: Single arm
b) Height: 12 m
c) Wattage: 250 Watt
View from the exit of Ramp 3
3. All affected street lights will be towards the entry, arrow marks
replaced on one to one basis the direction towards Shah Alam
Interchange
High Mast Lighting

1. 1 high mast lighting will be


removed in the ramp upgrade
project Existing
RAMP 3
2
2. Removal is necessary since the
proposed ramp design passes
through its current location
Towards
Shah
3. A new high mast lighting will be
Alam
replaced

View of the high mast (circled)


(a)

Electrical Services
Existing location of
(b)
the involved
1. The services which are to be
electrical services
removed and replaced are as (c) for the upgrade of
follows:
Ramp 3

a) TNB Compact Substation

3
b) Main Board for power
distribution to street lights and
billboard

c) Street Lighting Feeder Pillar


Panel

d) Manhole for billboard

(d)
(d)
Billboard

4
1. The existing billboard will be
removed and relocated accordingly

Ramp 3

Location of the billboard at Ramp 3 viewing towards Shah Alam Interchange (direction is marked
by arrow)
Signboards

1. All existing signboards will be


removed and replaced at
appropriate location according to
5
the new design

2. The signboard design will follow


the relevant specifications required
by the authority
Landscaping

1. All the road side landscaping


objects will be removed to allow for
6 new ramp design

2. New landscape will be designed


appropriately to suit the new ramp
design

Some of the trees and plants


sighted during the site visit
Median drain

Drainage

1. Existing drainage system has been


identified during the site visit
7
2. All drains will be demolished and
redesigned with the same
specifications of the existing
counterparts
V-shaped abutment shoulder
drain
V-shaped road side drain

Earthworks

8
1. Total quantity of earthworks for
Ramp 3 is 4279.585 m3 (Cut)

TCS / TCSS / CCTV

9
1. The item is not involved in the
ramp upgrading project
Table 2: Existing Road Features at Ramp 4

No Items Site Visit Photos

Street Lights
View of the street lights from the
exit of Ramp 4 towards KLIA
1. 10 street lights will be removed
due to the ramp upgrade project

2. Existing specifications:
1
d) Type: Single arm
e) Height: 12 m
f) Wattage: 250 Watt

3. All affected street lights will be


replaced on one to one basis
High Mast Lighting

1. 1 high mast lighting will be


removed in the ramp upgrade
project

2 2. Removal is necessary since the


existing high mast is situated very
near to the proposed ramp
upgrade lane

3. A new high mast lighting will be


replaced

View of the high mast at Ramp 4


Crossing Culverts

1. 3 crossing culverts were identified


at Ramp 4

3
2. Existing culvert length is 12.5 m

3. Proposed culvert length is 20 m


due to the additional lanes

4. Length extension is 7.5 m


Signboards

1. All existing signboards will be


removed and replaced at
appropriate location according to
4 Ramp 3
the new design

2. The signboard design will follow


the relevant specifications required
by the authority
Petronas Gas Line

1. DPI has sighted Petronas Gas


marker near Ramp 4
5
2. The new ramp design will not
require relocation of the mentioned
utility since the current location is
out of the ramp alignment
Some of the trees
sighted along Ramp 4
Landscaping
during the site visit

1. All the road side landscaping


objects will be removed to allow for
6 new ramp design

2. New landscape will be designed


appropriately to suit the new ramp
design
Embankment shoulder
drain

Drainage

1. Existing drainage system has been


identified during the site visit
7
2. All drains will be demolished and
redesigned with the same
specifications of the existing
counterparts

Toe Drain and crossing


culvert
Cascaded drain

Toe drain
1. Toe drain
3
1 2. Sump
3. Cascaded drain

Cascaded drain

Earthworks

8
1. Total quantity of earthworks for
Ramp 4 is 3465.056 m3 (Fill)