Professional Documents
Culture Documents
Putra Heights
Putra Heights
2. Existing specifications:
1
a) Type: Single arm
b) Height: 12 m
c) Wattage: 250 Watt
View from the exit of Ramp 3
3. All affected street lights will be towards the entry, arrow marks
replaced on one to one basis the direction towards Shah Alam
Interchange
High Mast Lighting
Electrical Services
Existing location of
(b)
the involved
1. The services which are to be
electrical services
removed and replaced are as (c) for the upgrade of
follows:
Ramp 3
3
b) Main Board for power
distribution to street lights and
billboard
(d)
(d)
Billboard
4
1. The existing billboard will be
removed and relocated accordingly
Ramp 3
Location of the billboard at Ramp 3 viewing towards Shah Alam Interchange (direction is marked
by arrow)
Signboards
Drainage
Earthworks
8
1. Total quantity of earthworks for
Ramp 3 is 4279.585 m3 (Cut)
9
1. The item is not involved in the
ramp upgrading project
Table 2: Existing Road Features at Ramp 4
Street Lights
View of the street lights from the
exit of Ramp 4 towards KLIA
1. 10 street lights will be removed
due to the ramp upgrade project
2. Existing specifications:
1
d) Type: Single arm
e) Height: 12 m
f) Wattage: 250 Watt
3
2. Existing culvert length is 12.5 m
Drainage
Toe drain
1. Toe drain
3
1 2. Sump
3. Cascaded drain
Cascaded drain
Earthworks
8
1. Total quantity of earthworks for
Ramp 4 is 3465.056 m3 (Fill)