ISTARU-BOONI HYDROPOWER PROJECT (72 MW)


CALCULATION SHEET

Contract : Feasibility Study of 52 MW Istaru-Booni Hydropower Project

Component : Surge Chamber

Feature : Determination of diameter of Surge tank

Description Symbol

Normal Reserviour Level N.R.L

Minimum operating Reserviour Level M.O.L

Tail Water Level T.W.L

Gross Head Hg

Discharge in Headrace Tunnel Q

Length of Headrace Tunnel Lt

Diameter of Headrace Tunnel Dt

Area of Headrace Tunnel At

Velocity in Headrace Tunnel Vt

Losses upto end of Headrace Tunnel Po

Net Head Ho

Required Area of Surge chamber (Thoma Criteria) Asc =Vo2 AtLt/2gPoHo


Sheet 2 of 1

Factor of Safety for Stability F.O.S

Selected Area of Surge chamber As =F.O.S x Asc

Selected Diameter of Surge chamber Ds =(4 x As/)^0.50

Say
Sheet 3 of 1

ROJECT (72 MW)


No. of Sheets Rev.:
ULATION SHEET
10

By: Date:
Haroon Abid 15-Oct-13

Checked: Date:
M.Iqbal Gill 15-Oct-13

Units References

2113.00 m.asl.

2106.00 m.asl.

2016.40 m.asl.

96.60 m Hg=N.R.L-M.O.L

94.00 m3/sec.

4023.00 m

6.30 m

31.17 m2

3.02 m/sec

6.00 m Head Loss Calculations

85.60 m

Hydraulic Structures by
P.Novak
113.16 m 2
(Page-525)
Sheet 4 of 1

Hydraulic Structures by
P.Novak
2.15 - (Page-526)

243.30 m2

17.60 m

18.00 m