NOTES:

1. DIMENSIONS OF INLET- AND OUTLET PIPING, OVERFLOW AND DRAINS


DEPENDING ON HYDRAULIC REQUIREMENTS.

2. THIS DRAWING SHOWS THE GENERAL PIPING SITUATION.


OVERFLOW INLET VIEW "A" ALL PIPE SUPPORTS AND TANK DETAILS HAVE TO BE CALCULATED AND OPTIMIZED
BY THE CONTRACTOR.
1:100 1:100 1:100 3. LOCATION OF INLET- AND OUTLET PIPING, OVERFLOW AND DRAINS DEPENDING
ON LOCAL SITE REQUIREMENTS AND WILL BE FIXED ON PLOT PLANS.
INLET = +11.80m 4. MINIMUM HORIZONTAL ANGLE BETWEEN INLET AND OUTLET PIPING AT LEAST 90.
INLET = +11.80m max. WL = +11.50m
max. WL = +11.50m
max. WL = +11.50m
+10.20m

VIEW "A" 8"

20"

8"
20" INLET RISER
8" LEGEND:

min. WL = +1.30m min. WL = +1.30m min. WL = +1.30m

SLOPE = 1% +0.30m +-0.00m SLOPE = 1% 0.00m

OVERFLOW
8"
INLET INLET
8"
DRAWING No.: DRAWING TITLE:

CONCRETE RINGWALL FOUNDATION OVERVIEW SHELL

1:100 OUTLET - PLAN NOZZLES ENGINEER'S STAMP CONTRACTOR'S STAMP

1:100
1:50
TANK SHELL
ASPHALT - IMPREGNATED BOARD 8"
REINFORCED CONCRETE 8"
OUTLET
0.00m

300mm CLEAN WASHED SAND 8"


500mm WELL COMPACTED ROAD
BASE MATERIAL
SUBSOIL COMPACTED TO 1,00 BLINDING POTABLE WATER
98% PROCTOR
STORAGE TANK
270 90
D = 13.70 m
V = 1,500 m3

DRAIN OUTLET - SECTION 0 Issue for Tender BR Ofner 12.08.2008

1:100 1:50
B Issue for Draft Tender BR Ofner 25.07.2008
A Issue for Engineering Report BR HARB 13.11.2007

REV. DESCRIPTION DRAWN CHECKED DATE

TANK SHELL
20" SALINE WATER CONVERSION CORPORATION
INLET RISER
KINGDOM OF SAUDI ARABIA
min. WL = +1.30m OUTLET = +1.25m
8"
AL LITH
min. WL = +1.30m
WATER TRANSMISSION SYSTEM
DRAIN = +0.60m OUTLET 8"

0.00m +0.30m
8" (DN 200)
0.00m CONSULTING
ILF CONSULTING ENGINEERS
ENGINEERS

Subconsultant: DRAWING TITLE:

TYPICAL STEEL RESERVOIR 1,500m3


P H S GENERAL ARRANGEMENT
-
SCALE 1:100 SCALE: DRAWING SHEET REV.
2 0 2 4 6 8 10 12 No.:
METRES 1:100 1:50 QP10 - Q - 604 - 0