Proof of Concept

Proof of Concept
Execution Guide

Product Cost Planning &


Actual Costing
Proof of Concept

Table of Contents

1. Product Cost Planning Execution Guide - Proof Of Concept........................4

1.1. Production of Raw Brine Essentials for Planning Cost................................4

2. POC - Organisation Structure..............................................................5

3. Creation of Master Records for Production..........................................6

3.1. Creation of Raw Material Masters..............................................................6

3.2. Creation of Finished Good Material Master................................................11

3.3. Creation of Bill of Material......................................................................14

3.4. Creation of Work Centers.......................................................................16

3.5. Creation of Routing...............................................................................17

4. Product Cost Planning-Determining Planned cost per unit................20

4.1. Planning Cost Element wise data in Cost Centers......................................20

4.2. Viewing Cost Centre Report....................................................................22

4.3. Planning of activities at Production cost centers........................................24

4.4. Planning Output of Service Department Activities......................................27

4.5. Calculation of Planned Activity Prices of Production & service Cost Centers
& Validation of calculated results.............................................................30

4.6. Planning consumption of Service Cost Centers Activity output by


Production Cost Centers.........................................................................37

4.7. Execution of Plan Reconciliation..............................................................40

4.8. Execution of Plan Distribution Cycle.........................................................48

4.9. Entering Statistical Key Figures for Plan Assessment Cycle.........................50

4.10. Execution of Plan Assessment Cycle........................................................52

4.11. Updating Planned RM/PM purchase prices in Material Master......................54

4.12. Running & saving of Cost Estimate..........................................................57

4.13. Marking & Releasing of Standard Cost Estimate........................................61

5. Product Costing- Determining Actual cost per unit............................66

5.1 Purchase of Raw Material.......................................................................66

5.2 Goods Receipt......................................................................................68

5.3 Creation of Production Order..................................................................70

5.4 Releasing, Scheduling & Costing the Production Order...............................72

5.5 Goods Issue to Production Order.............................................................77

5.6 Confirmation of Quantity & Activity for Operations....................................80

Product Costing Page 2 of 96


Proof of Concept

5.7 Goods Receipt of Finished Goods against Production Order.........................83

5.8 Creation of Sales Order..........................................................................86

5.9 Delivery of Finished Goods.....................................................................89

5.10 Picking of goods & Posting of Goods Issue................................................90

5.11 Billing..................................................................................................92

6. Glossary..............................................................................................93

Product Costing Page 3 of 96


Proof of Concept

1. Product Cost Planning Execution Guide - Proof Of


Concept

1.1. Production of Raw Brine Essentials for Planning Cost.

Raw Materials Required

1. Raw Salt

2. Sea Water

Operations Departments Performing Operations

(Production Cost Centers)

1. Dissolving ------ Dissolver

2. Refining ------ Refinery

Support Departments

(Service Cost Centers)

1. Accounts,

2. Canteen,

3. Facilities,

4. Security.

Expected Output in POC for Planned Cost of Raw Brine in Rs./ KG


Name Total Cost Fixed Variable
Raw Materials 140.00 0.00 140.00
Dissolver Production OHS 26.80 26.80 0.00
Refinery Production OHS 52.71 52.71 0.00
Service CC Cost 15.86 15.86 0.00
Total Cost of Production 235.37 95.37 140.00

Product Costing Page 4 of 96


Proof of Concept

2. POC - Organisation Structure


The following picture depicts the organization structure used for POC.

Product Costing Page 5 of 96


Proof of Concept

3. Creation of Master Records for Production

3.1.Creation of Raw Material Masters

Use
The Parameters for Creating Raw Materials Master are defined here.

Procedure
Access the activity using one of the following navigation options:

MM01
Transaction Code

SAP EASY Access Logistics /Material Management/Material


Master/Material/Create(General)/Immediately

Or

Logistics /Production/Master data


/Master/Material/Create(General)/Immediately

Field Name Values

Industry Sector Chemical Industry

Material Type Raw material

Plant SA(number)

Storage Location MIT(number)

Product Costing Page 6 of 96


Proof of Concept

Product Costing Page 7 of 96


Proof of Concept

Enter

Press Enter

Field Name Values

Views Basic Data 1, Basic Data2, Purchasing,


MRP1, MRP2, MRP3, Accounting 1,
Accounting 2, Cost estimate1, Costing 2,

Product Costing Page 8 of 96


Proof of Concept

Field Name Values Values

Name Raw Salt Sea Water

Basic Unit Measure KG L

SPI1 SP11
Material Group

Tab Sales: general/plant

Availability Check KP KP

Product Costing Page 9 of 96


Proof of Concept

Field Name Values Values

Trans Grp 0006 0006

Loading Grp 0003 0003

Tab MRP1

MRP Type PD PD

MRP Controller 001 001

Lot Size EX(Lot For Lot Order EX(Lot For Lot Order
Quantity) Quantity)

TAB MRP 2

000 000
Sched Margin Key

TAB MRP 3

KP (no Check) KP (no Check)


Availability Check

Tab Forecasting

N N
Forecast Model

Field Name Values Values

Tab Accounting 1

3000 3000
Valuation class

Price Unit 1 1

Product Costing Page 10 of 96


Proof of Concept

Field Name Values Values

Price Control V(moving Average Price) V(moving Average Price)

Tab Cost Estimate 1

With Qty Structure Check Check

Material origin Check Check

3.2.Creation of Finished Good Material Master.

Use

The Parameters for Creating Finished Goods are defined here.

Procedure
Access the activity using one of the following navigation options:

MM01
Transaction Code

IMG Menu Logistics /Material Management/Material


Master/Material/Create(General)/Immediately

Or

Logistics /Production/Master data


/Master/Material/Create(General)/Immediately

Field Name Values

Industry Sector Chemical Industry

Material Type Finished goods

Plant SA(number)

Storage Location MIT(number)

Product Costing Page 11 of 96


Proof of Concept

Field Name Values

Field Name Values

Material 123

Name Raw Brine

Basic Unit Measure Kg

SPI1
Material Group

Tab Accounting 1

7920
Valuation class
(Finished Goods)

Price Unit 1

ProductControl
Price Costing S(Standard Price) Page 12 of 96
Proof of Concept

Note: For all other views, enter the details as given in 3.1.1 above.

3.3.Creation of Bill of Material

Use
The Parameters for Creation of BOM are defined here.

Procedure
Access the activity using one of the following navigation options:

CS01
Transaction Code

SAP EASY Access Logistics/production/Master data/Bill of


Material/Material BOM /Create

Field Name Values

Material No 123(Purified Brine)

Plant SA(Soda Ash)

BOM usage 1( Production)

Product Costing Page 13 of 96


Proof of Concept

Press Enter.

Field Name Values Values

Item Category L(Stock Item) L(Stock Item)

Component 116(Raw salt) 120(Sea Water)

QTY 1 2

Product Costing Page 14 of 96


Proof of Concept

Go to Menu-Header and enter the base quantity (Quantity to which all component
quantities in a BOM relate.)

Field Name Values

Base Quantity 1 Kg

Save the BOM created.

3.4.Creation of Work Centers

Use
The Parameters for creation of Work Center are defined here.

Procedure
Access the activity using one of the following navigation options:

CR01
Transaction Code

Product Costing Page 15 of 96


Proof of Concept

SAP Easy Access Logistics/production/Master data/Work Centers/Work


Center/Create

Field Name Values Values

Work Center DISSOLVER Refinery

Work Center Category 001(Machine ) 001(Machine )

Person Responsible 001 001

Usage 001(Only routings) 001(Only routings)

Standard Value Key SAP1 SAP1

Product Costing Page 16 of 96


Proof of Concept

3.5.Creation of Routing

Use
The Parameters for Creation of routing for FG 123 (Purified Brine) are defined here.

Procedure
Access the activity using one of the following navigation options:

CA01
Transaction Code

SAP EASY Access Logistics/Production/Master


data/Routings/Routings/Standard Routings/Create

Field Name Values

Material No 123

Plant SA

Press Enter.

Product Costing Page 17 of 96


Proof of Concept

Assign the Operations in Routing as per the details given below:

Field Name Values Values

Work Center DISSOLVER REFINERY

Control Key PP01 PP01

Base Qty 10 10

Unit Kg Kg

Machine (ACT1) 10 -

Labour (ACT2) - 40

Unit H H

Product Costing Page 18 of 96


Proof of Concept

Product Costing Page 19 of 96


Proof of Concept

4. Product Cost Planning-Determining Planned cost


per unit

4.1. Planning Cost Element wise data in Cost Centers.

Use
The Parameters for Planning Cost Element wise data in Cost Centers are defined
here.

Procedure
Access the activity using one of the following navigation options:

KP06
Transaction Code

SAP EASY Access Accounting/Controlling/Cost Center Accounting


/Planning/Cost & Activity Inputs/Change

Field Name Values

Layout 1-101

Plan Version 0 (Zero)

From & to Periods 1 to 12

Year 2005

Cost Center (from to) *

Activity Type (from - to) *

Cost Element (from to) *

Entry Free (not Form based)

Click on the Overview Screen Icon (Top Left of the screen)

Product Costing Page 20 of 96


Proof of Concept

Entries are to be made as per layouts given below for each cost center.

To go to next Dept (i.e. Cost Center) use Black Down Arrow Icon (Third from Top
Left).

Product Costing Page 21 of 96


Proof of Concept

4.2. Viewing Cost Centre Report

The data prepared on excel as shown below needs to be checked with SAP
Report

Cost Center
Group ===> Production Service
Total
Cost Center DISSO REFINA SEC FACILI
===> LVER RY ACTTS CANT UR TIES

Cost Ele.
CE Descrpn

430000 Salary 5000 8000 3000 2000 500 100 18600


453000 Maintenance 300 900 100 1300
416300 Water 200 1500 100 200 25 2025
416400 Gas 1000 2000 500 3500
0
TOTAL Own
Cost 6500 12400 3100 2800 500 125 25425

S_ALR_87013611
Transaction Code

SAP EASY Access Accounting/Controlling /Cost Center Accounting


/Information System/ Reports for Cost Center
Accounting/Plan Actual Comparison/Cost Centers
Actual Plan Variance

Field Name Values

Controlling Area TCL

Fiscal Year 2005

From & To Periods 1 to 12

Plan Version 0

Cost Center Group Can be given if required

Cost Element Group Can be given if required

Execute.

Product Costing Page 22 of 96


Proof of Concept

Product Costing Page 23 of 96


Proof of Concept

4.3. Planning of activities at Production cost centers.

Use
The Parameters for Planning of activities (measurable Output) of Production Cost
Centers are defined here.

Procedure
Access the activity using one of the following navigation options:

KP26
Transaction Code

SAP EASY Access Accounting/Controlling/Cost Center Accounting


/Planning/ Activity Output Prices /Change

Field Name Values

Version 0

From Period 1

To Period 12

Fiscal Year 2005

Cost Center *

Activity type *

Entry Free

To go to next Dept (i.e. Cost Center) use Black Down Arrow Icon (Third from Top
Left). Enter the following data:

Product Costing Page 24 of 96


Proof of Concept

Cost Centre /Field Name Values

Dissolver/ Plan Activity Under Act1 300

Refinery/ Plan Activity Under Act2 250

Product Costing Page 25 of 96


Proof of Concept

4.4. Planning Output of Service Department Activities.

Use
The parameters for entering Plan Output Values of Service Departments Activities
are defined here.

(Note: Before starting this activity, it is necessary to complete the Cost Element wise
Planning for the relevant service cost centers thru transaction KP06 as explained in
3.1 above.)

Procedure
Access the activity using one of the following navigation options:

KP26
Transaction Code

SAP EASY Access Accounting/Controlling/Cost Center Accounting


/Planning/ Activity Output/Prices/ Change

Field Name Values

Version 0

From Period 1

To Period 12

Fiscal Year 2005

Cost Center or CC Group * Can be given as required

Activity type or Activity Type Group * Can be given as required

Entry Free

Product Costing Page 26 of 96


Proof of Concept

To go to next Dept (i.e. Cost Center) use Black Down Arrow Icon (Third from Top
Left). Once you arrive at the required production cost Center update as below,

Field Name Values

Cost centre Facilities

Activity Type Cups

Plan Activity 125

Product Costing Page 27 of 96


Proof of Concept

Product Costing Page 28 of 96


Proof of Concept

4.5. Calculation of Planned Activity Prices of Production & service


Cost Centers & Validation of calculated results

Use
The Parameters for Calculation of Planned Activity Prices of Production & Service
Cost Centers are defined here.

Procedure
Access the activity using one of the following navigation options:

KSPI
Transaction Code

SAP EASY Access Accounting/Controlling/Cost Center Accounting


/Planning/ Allocations/ Price Calculation

Field Name Values

All Cost Centers Production & Service CC group

(To be done separately for each)

Version 0

Period 1 to 12

Fiscal Year 2005

Test run First in Test Run and then post

Product Costing Page 29 of 96


Proof of Concept

a) Production Cost Centers

Product Costing Page 30 of 96


Proof of Concept

Go back. The system will ask whether to post these prices. If clicked on Yes, it will
post the prices (even though the report is executed in Test Run).

Product Costing Page 31 of 96


Proof of Concept

Similarly, execute the planned price calculation for Service cost Centers.

b) Service cost Centers

Product Costing Page 32 of 96


Proof of Concept

Product Costing Page 33 of 96


Proof of Concept

The Planned prices posted as above should be checked and validated through
transaction KP26. The relevant screen Shots are given below:

Product Costing Page 34 of 96


Proof of Concept

Product Costing Page 35 of 96


Proof of Concept

4.6. Planning consumption of Service Cost Centers Activity output


by Production Cost Centers

Use
The parameters for Planning Consumption of Service Cost Centers Activity Output in
Production Cost Centers are explained here.

Procedure
Access the activity using one of the following navigation options:

KP06
Transaction Code

SAP EASY Access Accounting/Controlling/Cost Center Accounting


/Planning/Cost & Activity inputs/ Change

After you press Enter, system shows, by default, the first layout i.e. 1-101.

Click on Next Layout Icon to select the layout 1-102.

Field Name Values

Layout 1-102

Plan Version 0 (Zero)

From & to Periods 1 to 12

Year 2005

Cost Center (from to) * Prod CC Group can be selected

Activity Type (from - to) * As required

Cost Element (from to) *

Entry Free (not Form based)

Click on Overview Screen Icon (on Top Left corner of the screen)

Product Costing Page 36 of 96


Proof of Concept

Enter the following values

Receiver Cost Centre Sender cost centre Planned Fixed


consumption

Dissolver Facilities 100

Refinery Facilities 50

Product Costing Page 37 of 96


Proof of Concept

Product Costing Page 38 of 96


Proof of Concept

4.7. Execution of Plan Reconciliation

Use
Plan Reconciliation is executed to identify and reconcile mismatches, if any, between
Sender CCs Output and Receiver CCs Input.
The procedure for executing Plan reconciliation is explained here.

Procedure
Access the activity using one of the following navigation options:

KPSI
Transaction Code

SAP EASY Access Accounting/Controlling/Cost Center Accounting


/Planning/Planning Aids / Plan Reconciliation

Field Name Values

All Cost Centers Select

Plan Version 0 (Zero)

From & to Periods 1 to 12

Year 2005

Test Run Do in Test Run First

Details List Select.

Product Costing Page 39 of 96


Proof of Concept

Execute.

Product Costing Page 40 of 96


Proof of Concept

If the Results are correct, then Save it. (System posts the data even if it is executed
in Test Run)

Once these results are posted, system will automatically post the Plan Cost of
Service Cost Centers to Production Cost Center based on the Activity Consumption
planned by them. See the Cost Center Report Screen Shots given below.

Product Costing Page 41 of 96


Proof of Concept

1. For all Cost Centers

Product Costing Page 42 of 96


Proof of Concept

2. For Service Cost Center (i.e. Sender)

Product Costing Page 43 of 96


Proof of Concept

3. For Production Cost Centers (Receivers)

Product Costing Page 44 of 96


Proof of Concept

NOTE: If there are any differences in Plan Data between the Output of Service Cost
Centers & consumption of Production Cost Centers, it will be reflected in the Plan
Reconciliation Report. If the data is posted after execution of KPSI, system will
automatically adjust the values of output of Service Cost so as to match with
consumption by production cost centers.

Screen Shots relevant for automatic matching of Sender & Receiver Activity
Quantities are given below

Product Costing Page 45 of 96


Proof of Concept

Product Costing Page 46 of 96


Proof of Concept

4.8. Execution of Plan Distribution Cycle

Use
The procedure for execution of plan Distribution Cycle is explained here.
After execution of distribution cycle, the sender cost centers cost will be allocated to
receivers cost centers, based on the criteria defined in the cycle. Ideally, the entire
cost of sender cost centre should be distributed to the receivers. In distribution,
sender cost centers cost is allocated to the receivers in the respective cost elements.
Hence, Secondary cost element is not required for distribution.

Procedure
Access the activity using one of the following navigation options:

KSVB
Transaction Code

SAP EASY Access Accounting/Controlling/Cost Center Accounting


/Planning/ Allocations/Distribution.

First execute in Test Run, analyze the results & then execute to post

Product Costing Page 47 of 96


Proof of Concept

First execute in Test Run, analyze the results & then execute to post .Click on the
number in sender/receiver column to see the details of distribution. For checking
whether entire cost of Service CC has been distributed to other cost centers, go to
the cost centre report (S_ALR_87013611).

Product Costing Page 48 of 96


Proof of Concept

4.9. Entering Statistical Key Figures for Plan Assessment Cycle

Use
The procedure for entering SKF for executing Plan Assessment Cycle is explained
here.

Procedure
Access the activity using one of the following navigation options:

KP46
Transaction Code

SAP EASY Access Accounting/Controlling/Cost Center Accounting


/Planning/ Statistical Key Figures/ Change

Give Parameters as per screen shots given below.

Product Costing Page 49 of 96


Proof of Concept

Product Costing Page 50 of 96


Proof of Concept

4.10. Execution of Plan Assessment Cycle

Use
The procedure for execution of plan Assessment Cycle is explained here.
After execution of assessment cycle, the sender cost centers cost will be allocated to
receivers cost centers based on the criteria defined in the cycle. Ideally, the entire
cost of sender cost centre should be distributed to the receivers. In assessment, it is
allocated through a single line item (secondary Cost element) in the receiver cost
centre.

Procedure
Access the activity using one of the following navigation options:
KSUB
Transaction Code

SAP EASY Access Accounting/Controlling/Cost Center Accounting


/Planning/ Allocations/Assessment

Enter the parameters as per the screen shot given below

First execute in Test Run, analyze the results & then execute in production run to
post .Click on the number in sender/receiver column to see the details of
assessment.

Product Costing Page 51 of 96


Proof of Concept

The result of the assessment cycle is as shown in the screen shot below. For
verification of the resultant output, go to the cost centre report (S_ALR_87013611).

Product Costing Page 52 of 96


Proof of Concept

4.11. Updating Planned RM/PM purchase prices in Material Master

Use
The Parameters for updating the planned RM/PM purchase prices in Material Master
are defined here.
Prerequisites
1. For all the RM/PM codes, planned purchase prices should be available from
Purchase Department. These planned prices should be with reference to price
unit in Accounting 1 view of the Material master of the respective material.

2. Before updating the planned price field, it is necessary to know beforehand


the costing variant which will be used for annual planning and the planned
price field (in RM/PM Material Master) to which it is linked through valuation
variant. In our example, we have used Costing Variant ZPC5 in which pricing
strategy for materials as per valuation variant (TCL _New Valuation Variant)
is Planned Price3 or Moving average Price.

The relevant screen shots are given below:

Click on Valuation variant and view the pricing strategy for materials.

Product Costing Page 53 of 96


Proof of Concept

Procedure
Access the activity using one of the following navigation options:

MM02
Transaction Code

SAP EASY Access Logistics/Materials management/Material Master


/Material/Change

Go to Costing 2 View of the material master and put the price in the planned price 3
field. Date should be first date of the year for which plan is to be prepared.

Product Costing Page 54 of 96


Proof of Concept

Save it & do the same for other raw materials. When the number of RM/PM is large,
in that case we can use LSMW for mass upload. However, LSMW needs to be
created.

Product Costing Page 55 of 96


Proof of Concept

4.12. Running & saving of Cost Estimate

Use
The Parameters for running & saving the Cost estimate for the material are defined
here.

The cost estimate determines what costs go into the standard price for the material.
Only those cost components, that are flagged as relevant for stock valuation, are
included in the standard price. A material cost estimate is used to calculate the
standard price which will be updated in the material master record.

Procedure
Access the activity using one of the following navigation options:
CK11n
Transaction Code

SAP EASY Access Logistics/Production-Process/Product Cost planning/


Material Costing/Cost Estimate with Qty
Structure/Create

Field Name Values

FG Material No. 123

Plant SA

Costing Variant ZPC5(as mentioned before)

Costing Version 1

Product Costing Page 56 of 96


Proof of Concept

Product Costing Page 57 of 96


Proof of Concept

Give the Costing dates, Qty Structure date & Valuation Date & press enter

Product Costing Page 58 of 96


Proof of Concept

Check the Standard Cost estimate results and verify it with the desired
result. Then Save it by clicking on the save icon.
The cost estimate must be executed with a costing variant (made for the specific
purpose like Annual Planning, Inventory Valuation, and Current Costing etc.) and
saved.
Once it is released thru transaction CK24, it will be updated in the Master record of
the FG/ SFG. Transaction CK24 is explained below.

Product Costing Page 59 of 96


Proof of Concept

4.13. Marking & Releasing of Standard Cost Estimate

Use
The Parameters for Marking & release of the standard Cost estimate for the material
are explained here.

Once the standard cost estimate is released, the standard price will appear in the
Accounting 1 & Costing 2 view of Material Master. To view the cost component
structure, double click on the current period field.

Procedure
Access the activity using one of the following navigation options:
CK24
Transaction Code

SAP EASY Access Logistics/Production-Process/Product Cost planning/


Material Costing/Price Update

First click on marking allowance to allow release of standard cost for the current
period. This is to be done only once at the beginning of the period.

Product Costing Page 60 of 96


Proof of Concept

Give the costing variant & version

Product Costing Page 61 of 96


Proof of Concept

Save and go back to the main screen.

Give the material number and execute in test run first. Check it & mark. It will show
the future price calculated.

Now go back and click on release. Following screen shot shows the released standard
cost estimate.

Product Costing Page 62 of 96


Proof of Concept

Check and save it. Cross check the updated price in the material master as shown in
the screen shot below.

Product Costing Page 63 of 96


Proof of Concept

(Note: Please consider the values shown in the screen shot as only the reference
values. Do not cross check the same with the desired output. The purpose is to show
the flow of activities.)

Product Costing Page 64 of 96


Proof of Concept

5. Product Costing- Determining Actual cost per unit

Purchase of Raw Material

Use
The Parameters for Purchase of Raw Materials are defined here.

Procedure
Access the activity using one of the following navigation options:

ME21N
Transaction Code

SAP EASY Access Logistics/ Materials Management / Purchasing /


Purchase Order / Create / Vendor /Supplying Plant
Known.

Field Name Values

Vendor 200000

Purchasing Org TCLP

Purc. Group SPI (SPI Purchase Group)

Company Code TCL

Material 116

PO Quantity 10 KG

Net Price 18

Material 120

PO Quantity 5L

Plant SA

Net Price 2

Delivery Date 30.08.2005

Press Enter.

Product Costing Page 65 of 96


Proof of Concept

Under Material Data Tab: Uncheck nfo Update field.

Now Confirm the Net Price entered is same as displayed, else re-enter.

Press Enter

Save

Goods Receipt

Use

Product Costing Page 66 of 96


Proof of Concept

The Parameters for Goods Receipt of Raw Materials are defined here.

Procedure

Access the activity using one of the following navigation options:

Transaction Code MIGO_GR (MIGO)

SAP EASY Access Logistics/ Materials Management / Purchasing /


Inventory Management / Goods Movement/ Goods
Receipt / Purchase Order / GR for Purchase Order.

Field Name Values

Purchase Order 4500000040

Posting & Document Date 25.11.2005

Press enter

Field Name Values

Stor Loc MIT

Check Item OK check box

Press Enter

Save

Product Costing Page 67 of 96


Proof of Concept

Product Costing Page 68 of 96


Proof of Concept

Creation of Production Order

Use
The Parameters for Creation of Production Order are defined here.

Procedure
Access the activity using one of the following navigation options:

CO01
Transaction Code

SAP Easy Access Logistics/Production/Production


Control/order/create/with material

Field Name Values

Material 123(Raw Brine)

Production Plant SA

Order Type PP01 (Standard Production Order)

Product Costing Page 69 of 96


Proof of Concept

Field Name Values

Total qty 10

Finish Date 07.10.2005


Releasing, Scheduling & Costing the Production Order

Release the Order

Product Costing Page 70 of 96


Proof of Concept

Scheduling

Product Costing Page 71 of 96


Proof of Concept

Carry out Costing

Product Costing Page 72 of 96


Proof of Concept

Check the planned cost calculated as follows

Product Costing Page 73 of 96


Proof of Concept

Check all the tabs on the main screen of the production order & save.

Product Costing Page 74 of 96


Proof of Concept

Goods Issue to Production Order

Use
The Parameters for Goods Issue to Production Order are defined here.

Procedure
Access the activity using one of the following navigation options:

MB1A
Transaction Code

SAP Easy Access Logistics/Production/Production Control/ Goods


Movement/ MB1A Goods Issue

Product Costing Page 75 of 96


Proof of Concept

Field Name Values

Document Date xx.xx.2005

Posting Date xx.xx.2005

Movement Type 261

Plant SA(number)

Product Costing Page 76 of 96


Proof of Concept

Enter the details as given below:

Product Costing Page 77 of 96


Proof of Concept

Click on the overview to check the issues made

Product Costing Page 78 of 96


Proof of Concept

Save the document.

Confirmation of Quantity & Activity for Operations

Use
The Parameters for Confirmation of Quantity & Activity for operations to Production
Order are defined here.

Procedure
Access the activity using one of the following navigation options:

CO11N
Transaction Code

SAP Easy Access Logistics/Production/Production Control/


Confirmation / Enter/ For Operation / Time Ticket

Product Costing Page 79 of 96


Proof of Concept

CO11N
Transaction Code

Product Costing Page 80 of 96


Proof of Concept

Field Name Values Values

Order 1000045 1000045

Ope/Acty 0030(Dissolver) 0040(Refinery)

Confirm type Final confirmation Final confirmation

Quantity Confirmation 10(Order qty) 10(Order qty)

Activity Confirmation

Machine 2 H

Labor 1H

Product Costing Page 81 of 96


Proof of Concept

Check the actual cost debited to the production order in the Cost Report.

Product Costing Page 82 of 96


Proof of Concept

Goods Receipt of Finished Goods against Production Order

Use
The Parameters for Creation of Production Order is defined here.

Procedure
Access the activity using one of the following navigation options:

MB31
Transaction Code

SAP Easy Access Logistics/Materials Mgt/Inventory mgt/Goods


Receipt/For order

Enter the details as given below

Product Costing Page 83 of 96


Proof of Concept

Save the document.

Product Costing Page 84 of 96


Proof of Concept

Go to the Production order cost report and see the cost analysis

Product Costing Page 85 of 96


Proof of Concept

Creation of Sales Order

Use
The Parameters for Creation of Sales Order are defined here.

Procedure
Access the activity using one of the following navigation options:

VA01
Transaction Code

SAP Easy Access Logistics/Sales & Distribution/Sales/Order/Create

Enter the details as given below

Field Name Values

Sold to party 48

PO number & Date xxx / xx.xx.2005

Payment terms As required

Item 0010

Product Costing Page 86 of 96


Proof of Concept

Material 123 (Material Code)

Order Qty /UOM As required

Item Category TAN

Plant /Storage Location As required

Press Enter. Select the Line item & go to Item conditions for Pricing

Enter the Pricing conditions as per example shown below

Product Costing Page 87 of 96


Proof of Concept

Save the sales order & note the order number.

Delivery of Finished Goods

Use

Product Costing Page 88 of 96


Proof of Concept

The Parameters for Creation of Sales Order are defined here.

Procedure
Access the activity using one of the following navigation options:

VL01N
Transaction Code

SAP Easy Access Logistics/Sales & Distribution/Shipping &


transportation/Outbound delivery/Create/Single
document/VL01n

Enter the details as shown in the example below

Product Costing Page 89 of 96


Proof of Concept

Save & note the delivery number.

Picking of goods & Posting of Goods Issue

Use
The Parameters for Picking of goods & Post Good issue are defined here.

Procedure
Access the activity using one of the following navigation options:

VL02N
Transaction Code

SAP Easy Access Logistics/Sales & Distribution/Shipping &


transportation/Outbound delivery/Change/VL02N

Put the delivery number and press enter

Go to the Tab for Picking & enter the quantity to be picked

Product Costing Page 90 of 96


Proof of Concept

Click on Post goods issue. The message will be displayed for Outbound Delivery
Saved.

Product Costing Page 91 of 96


Proof of Concept

Billing

Use
The Parameters for Creation of Billing Document (i.e. Invoice) are defined here.

Procedure
Access the activity using one of the following navigation options:

VF01
Transaction Code

SAP Easy Access Logistics/Logistics Execution /Outbound Process


/Goods Issue for Outbound delivery/Billing/ Billing
Document / Create

Enter the Details as per screen shot below.

Save the document & check the messages. If any errors are there, correct the same
& then Save. It will generate the Billing Document & also post the same in FI (i.e.
release of invoice to accounts).

Check the Accounting Document Posted.

Product Costing Page 92 of 96


Proof of Concept

6. Glossary

Sr.No Terminology Meaning / Concept

1 Material Master A data record containing all the basic


information required to manage a material.

This data is sorted according to various


criteria including data of a descriptive nature
(such as size, dimension and weight) and
data with a control function (such as
material type and industry sector). In
addition to this data, which can be directly
maintained by the user, it also contains data
that is automatically updated by the system
(such as stock levels).

2 BOM It is a complete & formally structured list of


components of a product.

3 Cost Centre (CC) An organizational unit within a controlling


area that represents a defined location of
cost incurrence.

4 Activity Type A unit in a controlling area that classifies the


activities performed in a cost center

5 Primary cost Element Replica of GL Codes in Co. It is a Bridge


between FI & CO.

6 Secondary Cost Element It exists only in CO & is used for transferring


costs from one CO Object to other.

7 Distribution A process used for transferring cost from


one CC to another in the same cost element.

8 Assessment A process used for transferring cost from


once CC to another by using a Secondary
Cost Element.

7 Routing It defines one or more sequences of


operations for the production of a material

Product Costing Page 93 of 96


Proof of Concept

To apply consumption accounting practice, the following will be the scheme of


accounting entries that will be configured in the system:

Transaction Accounting Entry

Purchase/Receipt of Inventory entry:


Goods
Material Inventory A/c Dr.
(Also considering Import
Cenvat Clearing A/c Dr.
purchase)
To GR/IR Inventory A/c
(Inventory value is booked
as per Purchase Order To Customs/Clg Provision A/c
terms) Purchase Statistical Entry:
Purchase Local/Import A/c Dr.
To Purchase Offset Loc/Imp A/c
Customs/Clg Purchase Local/Import A/c Dr.
To Customs/Clg Pur Offset Loc/Imp A/c

Logistic Invoice GR/IR Account Dr.


Verification
To Vendor Account
(Vendor Invoice)

Logistic Invoice Normal Entry


Verification
Customs/Clearing Provision A/c Dr.
(Customs/Clearing Invoice)
To Vendor Account
If Customs/Clg value > Pur Order Value
Material Inventory A/c Dr.
Cenvat Clearing A/c Dr.
To Customs/Clg provision account
Customs/Clg Purchase Local/Import A/c
Dr.
To Customs/Clg Pur Offset Loc/Imp A/c
If Customs/Clg value < Pur Order Value
Customs/Clg provision account Dr.
To Material Inventory A/c
To Cenvat Clearing A/c

Product Costing Page 94 of 96


Proof of Concept

Customs/Clg Pur Offset Loc/Imp A/c Dr.


To Customs/Clg Purchase Local/Import A/c

Excise Invoice Cenvat Deposit A/c Dr.


Verification
Cenvat Held A/c (In case of capital pur) Dr.
To Cenvat Clearing Account

Period-end closing
entries

GR/IR Account Clearing Goods Received but Invoice not received


GR/IR Adjustment A/c Dr.
To Outstanding Purchase A/c
Invoice booked but goods not received
Goods-in-transit Stock A/c Dr.
To GR/IR Adjustment A/c
(This entry is provisional and is reversed in the
next posting period.)

Issue of Material to
Material Consumption A/c (P&L) Dr.
Production
To Material Inventory A/c
(to Process Order)

Work-in-process Stock (B/S) A/c Dr.


Realization of Work-in-
To Work-in-process stock change A/c (P&L)
process at period-end
To Applied Overheads A/c

Finished Goods Stock A/c Dr.


Receipt of Finished
Goods in Finished Goods To Cost of Goods Manufactured A/c
Stores
To Applied Overheads A/c

Finished Goods Cost of Goods Sold A/c Dr.


Despatched to Customer

Product Costing Page 95 of 96


Proof of Concept

To Finished Goods Stock A/c

Sale of Finished Goods to Customer A/c Dr.


Customer To Sales A/c

Month-end entry for Price Variance A/c Dr/Cr


Variance calculation Cost of Goods Manufactured A/c Dr./Cr.

Monthly revaluation of Finished Goods Revaluation A/c Dr./Cr.


closing stock Finished Goods Stock A/c Dr/Cr.

Product Costing Page 96 of 96