Mu 806.29
Mn = = 1007.86 kgm
0.8
Koefisien Ketahanan Rn;
Mn 100786
Rn = = 9.14 kg/cm2
bd2
100 x 10.5^2
fy 500
Rn = fy 1 0.59 500 1 0.59
fc ' 24.9
Rn = 500 - 5923.695 2
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Pembatasan nilai ;
0,85 fc ' b1 600 0,85 x 24,9 x 0,85
b x 0, 545 = 0.0196257
fy 600 + fy 500
3.028
aktual = = 0.00288
100 x 10.5
As x fy = 0.72 cm
lengan momen dalam = a =
0.85 x fc' x b
Momen nominal
Mn = As fy (d-a/2) = 1535.196 kgm
Jadi, Mn aktual > Mn perlu (1007.86 kgm) OK
Kondisi Stripping
- Tinjauan arah X (arah panjang)
a= 0.5 m
b= 1.725 m
q1x = 240 kg/m
= 1.5
MA = MB = -15.00 kgm
Output model SAP a b
MAB = MBA = 27.78 kgm A
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Mcrack = fr*Ig/y = 1806666.667 Nmm = 1.807 kNm = 180.7 kgm > Mmax = 41.67 kgm (
Kondisi Penumpukan
a = 1/5*L = 0.545 m
b = (L-2a) = 1.635 m
q1x =t*B*2400 = 240 kg/m
y = 0.5*t = 40 mm
q=
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Pemasangan
- Gaya geser
Vu = 1.15wu.ln = 1871.476 kg
2
Vc = 1/6fc'bwd = 8732.482 kg
Vc = 6549.362 kg
Jadi Vu < Vc, Maka tidak perlu tulangan geser. OK
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Half Slab
Utama
Tambahan
Topping
U6 - 166.67 mm
mm
mm
mm
120.00 kg/m
b a
B
kgm > Mmax = 41.67 kgm ( OK)
25 mm
261.60 kg/m
b a
55 mm
240.00 kg/m
b a
55 mm
105 mm
M6 - 150 mm
D10 - 600 mm
Mu 1203.90
Mn = = 1504.87 kgm
0.8
Koefisien Ketahanan Rn;
Mn 150487
Rn = = 13.65 kg/cm2
bd2
100 x 10.5^2
fy 500
Rn = fy 1 0.59 500 1 0.59
fc ' 24.9
Rn = 500 - 5923.695 2
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Pembatasan nilai ;
0,85 fc ' b1 600 0,85 x 24,9 x 0,85
b x 0,545 = 0.0196257
fy 600 + fy 500
3.028
aktual = = 0.00288
100 x 10.5
As x fy = 0.72 cm
lengan momen dalam = a =
0.85 x fc' x b
Momen nominal
Mn = As fy (d-a/2) = 1535.196 kgm
Jadi, Mn aktual > Mn perlu (1504.87 kgm) OK
Kondisi Stripping
- Tinjauan arah X (arah panjang)
a= 0.5 m
b= 2.725 m
q1x = 211.2 kg/m
= 1.5
MA = MB = -13.20 kgm
Output model SAP a b
MAB = MBA = 79.52 kgm A
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Mcrack = fr*Ig/y = 1589866.667 Nmm = 1.59 kNm = 159 kgm > Mmax = 119.28 kgm
Kondisi Penumpukan
a = 1/5*L = 0.745 m
b = (L-2a) = 2.235 m
q1x =t*B*2400 = 211.2 kg/m
y = 0.5*t = 40 mm
q=
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Pemasangan
- Gaya geser
Vu = 1.15wu.ln = 2044.206 kg
2
Vc = 1/6fc'bwd = 8732.482 kg
Vc = 6549.362 kg
Jadi Vu < Vc, Maka tidak perlu tulangan geser. OK
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Half Slab
Utama
Tambahan
Topping
U6 - 100 mm
mm
mm
mm
105.60 kg/m
b a
B
kgm > Mmax = 119.28 kgm ( OK)
25 mm
357.60 kg/m
b a
55 mm
211.20 kg/m
b a
55 mm
105 mm
M6 - 150 mm
D10 - 600 mm
Mu 1203.90
Mn = = 1504.87 kgm
0.8
Koefisien Ketahanan Rn;
Mn 150487
Rn = = 13.65 kg/cm2
bd2
100 x 10.5^2
fy 500
Rn = fy 1 0.59 500 1 0.59
fc ' 24.9
Rn = 500 - 5923.695 2
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Pembatasan nilai ;
0,85 fc ' b1 600 0,85 x 24,9 x 0,85
b x 0,545 = 0.0196257
fy 600 + fy 500
3.028
aktual = = 0.00288
100 x 10.5
As x fy = 0.72 cm
lengan momen dalam = a =
0.85 x fc' x b
Momen nominal
Mn = As fy (d-a/2) = 1535.196 kgm
Jadi, Mn aktual > Mn perlu (1504.87 kgm) OK
Kondisi Stripping
- Tinjauan arah X (arah panjang)
a= 0.5 m
b= 2.725 m
q1x = 312 kg/m
= 1.5
MA = MB = -19.50 kgm
Output model SAP a b
MAB = MBA = 117.47 kgm A
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Mcrack = fr*Ig/y = 2348666.667 Nmm = 2.349 kNm = 234.9 kgm > Mmax = 176.205 kgm
Kondisi Penumpukan
a = 1/5*L = 0.745 m
b = (L-2a) = 2.235 m
q1x =t*B*2400 = 312 kg/m
y = 0.5*t = 40 mm
q=
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Pemasangan
- Gaya geser
Vu = 1.15wu.ln = 2044.206 kg
2
Vc = 1/6fc'bwd = 8732.482 kg
Vc = 6549.362 kg
Jadi Vu < Vc, Maka tidak perlu tulangan geser. OK
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Half Slab
Utama
Tambahan
Topping
U6 - 100 mm
mm
mm
mm
156.00 kg/m
b a
B
kgm > Mmax = 176.205 kgm ( OK)
25 mm
357.60 kg/m
b a
55 mm
312.00 kg/m
b a
55 mm
105 mm
M6 - 150 mm
D10 - 600 mm
Mu 1340.06
Mn = = 1675.07 kgm
0.8
Koefisien Ketahanan Rn;
Mn 167507
Rn = = 15.19 kg/cm2
bd2
100 x 10.5^2
fy 500
Rn = fy 1 0.59 500 1 0.59
fc ' 24.9
Rn = 500 - 5923.695 2
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Pembatasan nilai ;
0,85 fc ' b1 600 0,85 x 24,9 x 0,85
b x 0,545 = 0.0196257
fy 600 + fy 500
3.38
aktual = = 0.00322
100 x 10.5
As x fy = 0.8 cm
lengan momen dalam = a =
0.85 x fc' x b
Momen nominal
Mn = As fy (d-a/2) = 1706.9 kgm
Jadi, Mn aktual > Mn perlu (1675.07 kgm) OK
Kondisi Stripping
- Tinjauan arah X (arah panjang)
a= 0.5 m
b= 2.93 m
q1x = 220.8 kg/m
= 1.5
MA = MB = -13.80 kgm
Output model SAP a b
MAB = MBA = 104.67 kgm A
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Mcrack = fr*Ig/y = 1662133.333 Nmm = 1.662 kNm = 166.2 kgm > Mmax = 157.005 kgm
Kondisi Penumpukan
a = 1/5*L = 0.786 m
b = (L-2a) = 2.358 m
q1x =t*B*2400 = 220.8 kg/m
y = 0.5*t = 40 mm
q=
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Pemasangan
- Gaya geser
Vu = 1.15wu.ln = 2156.705 kg
2
Vc = 1/6fc'bwd = 8732.482 kg
Vc = 6549.362 kg
Jadi Vu < Vc, Maka tidak perlu tulangan geser. OK
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Half Slab
Utama
Tambahan
Topping
U6 - 90.91 mm
mm
mm
mm
110.40 kg/m
b a
B
kgm > Mmax = 157.005 kgm ( OK)
25 mm
377.28 kg/m
b a
55 mm
220.80 kg/m
b a
55 mm
105 mm
M6 - 150 mm
D10 - 450 mm
Mu 1203.90
Mn = = 1504.87 kgm
0.8
Koefisien Ketahanan Rn;
Mn 150487
Rn = = 13.65 kg/cm2
bd2
100 x 10.5^2
fy 500
Rn = fy 1 0.59 500 1 0.59
fc ' 24.9
Rn = 500 - 5923.695 2
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Pembatasan nilai ;
0,85 fc ' b1 600 0,85 x 24,9 x 0,85
b x 0,545 = 0.0196257
fy 600 + fy 500
3.028
aktual = = 0.00288
100 x 10.5
As x fy = 0.72 cm
lengan momen dalam = a =
0.85 x fc' x b
Momen nominal
Mn = As fy (d-a/2) = 1535.196 kgm
Jadi, Mn aktual > Mn perlu (1504.87 kgm) OK
Kondisi Stripping
- Tinjauan arah X (arah panjang)
a= 0.5 m
b= 2.725 m
q1x = 345.6 kg/m
= 1.5
MA = MB = -21.60 kgm
Output model SAP a b
MAB = MBA = 138.79 kgm A
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Penumpukan
a = 1/5*L = 0.745 m
b = (L-2a) = 2.235 m
q1x =t*B*2400 = 345.6 kg/m
y = 0.5*t = 40 mm
q=
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Pemasangan
- Gaya geser
Vu = 1.15wu.ln = 2044.206 kg
2
Vc = 1/6fc'bwd = 8732.482 kg
Vc = 6549.362 kg
Jadi Vu < Vc, Maka tidak perlu tulangan geser. OK
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Half Slab
Utama
Tambahan
Topping
U6 - 100 mm
mm
mm
mm
172.80 kg/m
b a
B
kgm > Mmax = 208.185 kgm ( OK)
25 mm
357.60 kg/m
b a
55 mm
345.60 kg/m
b a
55 mm
105 mm
M6 - 150 mm
D10 - 600 mm
Mu 1234.17
Mn = = 1542.72 kgm
0.8
Koefisien Ketahanan Rn;
Mn 154272
Rn = = 13.99 kg/cm2
bd2
100 x 10.5^2
fy 500
Rn = fy 1 0.59 500 1 0.59
fc ' 24.9
Rn = 500 - 5086.207 2
Pembatasan nilai ;
0,85 fc ' b1 600 0,85 x 24,9 x 0,85
b x 0,545 = 0.0228573
fy 600 + fy 500
12.356
aktual = = 0.01177
100 x 10.5
As x fy = 2.51 cm
lengan momen dalam = a =
0.85 x fc' x b
Momen nominal
Mn = As fy (d-a/2) = 5711.561 kgm
Jadi, Mn aktual > Mn perlu (1542.72 kgm) OK
Kondisi Stripping
- Tinjauan arah X (arah panjang)
a= 0.5 m
b= 2.725 m
q1x = 345.6 kg/m
= 1.5
MA = MB = -21.60 kgm
Output model SAP a b
MAB = MBA = 138.79 kgm A
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Penumpukan
a = 1/5*L = 0.745 m
b = (L-2a) = 2.235 m
q1x =t*B*2400 = 345.6 kg/m
y = 0.5*t = 40 mm
q=
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Pemasangan
- Gaya geser
Vu = 1.15wu.ln = 2095.611 kg
2
Vc = 1/6fc'bwd = 9424.038 kg
Vc = 7068.029 kg
Jadi Vu < Vc, Maka tidak perlu tulangan geser. OK
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Half Slab
Utama
Tambahan
Topping
U5 - 71.43 mm
mm
mm
mm
172.80 kg/m
b a
B
kgm > Mmax = 208.185 kgm ( OK)
25 mm
357.60 kg/m
b a
55 mm
345.60 kg/m
b a
55 mm
105 mm
( Not OK)
M5 - 150 mm
D10 - 300 mm
Mu 1319.67
Mn = = 1649.59 kgm
0.8
Koefisien Ketahanan Rn;
Mn 164959
Rn = = 14.96 kg/cm2
bd2
100 x 10.5^2
fy 500
Rn = fy 1 0.59 500 1 0.59
fc ' 24.9
Rn = 500 - 5923.695 2
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Rn = 500 - 5923.695 2
Pembatasan nilai ;
0,85 fc ' b1 600 0,85 x 24,9 x 0,85
b x 0,545 = 0.0196257
fy 600 + fy 500
3.308
aktual = = 0.00315
100 x 10.5
As x fy = 0.78 cm
lengan momen dalam = a =
0.85 x fc' x b
Momen nominal
Mn = As fy (d-a/2) = 1672.194 kgm
Jadi, Mn aktual > Mn perlu (1649.59 kgm) OK
Kondisi Stripping
- Tinjauan arah X (arah panjang)
a= 1.3 m
b= 1.3 m
q1x = 183.24 kg/m
= 1.5
MA = MB = -77.42 kgm
Output model SAP a b
MAB = MBA = 77.42 kgm A
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Mcrack = fr*Ig/y = 1293178.125 Nmm = 1.293 kNm = 129.3 kgm > Mmax = 116.12835 k
Kondisi Penumpukan
a = 1/5*L = 0.78 m
b = (L-2a) = 2.34 m
q1x =t*B*2400 = 183.24 kg/m
y = 0.5*t = 37.5 mm
q=
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Pemasangan
- Gaya geser
Vu = 1.15wu.ln = 2140.242 kg
2
Vc = 1/6fc'bwd = 8732.482 kg
Vc = 6549.362 kg
Jadi Vu < Vc, Maka tidak perlu tulangan geser. OK
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Half Slab
Utama
Tambahan
Topping
U6 - 90.91 mm
mm
mm
mm
91.62 kg/m
b a
B
kgm > Mmax = 116.12835 kgm ( OK)
25 mm
351.00 kg/m
b a
50 mm
183.24 kg/m
b a
50 mm
105 mm
M6 - 150 mm
U10 - 600 mm
Mu 1292.40
Mn = = 1615.49 kgm
0.8
Koefisien Ketahanan Rn;
Mn 161549
Rn = = 14.65 kg/cm2
bd2
100 x 10.5^2
fy 500
Rn = fy 1 0.59 500 1 0.59
fc ' 24.9
Rn = 500 - 5923.695 2
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Rn = 500 - 5923.695 2
Pembatasan nilai ;
0,85 fc ' b1 600 0,85 x 24,9 x 0,85
b x 0,545 = 0.0196257
fy 600 + fy 500
3.38
aktual = = 0.00322
100 x 10.5
As x fy = 0.8 cm
lengan momen dalam = a =
0.85 x fc' x b
Momen nominal
Mn = As fy (d-a/2) = 1706.9 kgm
Jadi, Mn aktual > Mn perlu (1615.49 kgm) OK
Kondisi Stripping
- Tinjauan arah X (arah panjang)
a= 0.5 m
b= 2.45 m
q1x = 172.8 kg/m
= 1.5
MA = MB = -10.80 kgm
Output model SAP a b
MAB = MBA = -10.80 kgm A
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Penumpukan
a = 1/5*L = 0.69 m
b = (L-2a) = 2.07 m
q1x =t*B*2400 = 172.8 kg/m
y = 0.5*t = 40 mm
q=
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Pemasangan
- Gaya geser
Vu = 1.15wu.ln = 2369.391 kg
2
Vc = 1/6fc'bwd = 8732.482 kg
Vc = 6549.362 kg
Jadi Vu < Vc, Maka tidak perlu tulangan geser. OK
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Half Slab
Utama
Tambahan
Topping
U6 - 90.91 mm
mm
mm
mm
86.40 kg/m
b a
B
kgm > Mmax = 16.2 kgm ( OK)
25 mm
331.20 kg/m
b a
55 mm
172.80 kg/m
b a
55 mm
105 mm
M6 - 150 mm
U10 - 450 mm
Mu 1187.79
Mn = = 1484.74 kgm
0.8
Koefisien Ketahanan Rn;
Mn 148474
Rn = = 13.47 kg/cm2
bd2
100 x 10.5^2
fy 500
Rn = fy 1 0.59 500 1 0.59
fc ' 24.9
Rn = 500 - 5923.695 2
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Rn = 500 - 5923.695 2
Pembatasan nilai ;
0,85 fc ' b1 600 0,85 x 24,9 x 0,85
b x 0,545 = 0.0196257
fy 600 + fy 500
3.1
aktual = = 0.00295
100 x 10.5
As x fy = 0.73 cm
lengan momen dalam = a =
0.85 x fc' x b
Momen nominal
Mn = As fy (d-a/2) = 1570.925 kgm
Jadi, Mn aktual > Mn perlu (1484.74 kgm) OK
Kondisi Stripping
- Tinjauan arah X (arah panjang)
a= 1.2 m
b= 1.3 m
q1x = 183.24 kg/m
= 1.5
MA = MB = -65.97 kgm
Output model SAP a b
MAB = MBA = 77.42 kgm A
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Mcrack = fr*Ig/y = 1293178.125 Nmm = 1.293 kNm = 129.3 kgm > Mmax = 116.12835 k
Kondisi Penumpukan
a = 1/5*L = 0.74 m
b = (L-2a) = 2.22 m
q1x =t*B*2400 = 183.24 kg/m
y = 0.5*t = 37.5 mm
q=
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Pemasangan
- Gaya geser
Vu = 1.15wu.ln = 2030.486 kg
2
Vc = 1/6fc'bwd = 8732.482 kg
Vc = 6549.362 kg
Jadi Vu < Vc, Maka tidak perlu tulangan geser. OK
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Half Slab
Utama
Tambahan
Topping
U6 - 100 mm
mm
mm
mm
91.62 kg/m
b a
B
kgm > Mmax = 116.12835 kgm ( OK)
25 mm
333.00 kg/m
b a
50 mm
183.24 kg/m
b a
50 mm
105 mm
M6 - 150 mm
U10 - 750 mm
Mu 586.52
Mn = = 733.15 kgm
0.8
Koefisien Ketahanan Rn;
Mn 73315
Rn = = 6.65 kg/cm2
bd2
100 x 10.5^2
fy 500
Rn = fy 1 0.59 500 1 0.59
fc ' 24.9
Rn = 500 - 5923.695 2
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Rn = 500 - 5923.695 2
Pembatasan nilai ;
0,85 fc ' b1 600 0,85 x 24,9 x 0,85
b x 0,545 = 0.0196257
fy 600 + fy 500
2.676
aktual = = 0.00255
100 x 10.5
As x fy = 0.63 cm
lengan momen dalam = a =
0.85 x fc' x b
Momen nominal
Mn = As fy (d-a/2) = 1362.753 kgm
Jadi, Mn aktual > Mn perlu (733.15 kgm) OK
Kondisi Stripping
- Tinjauan arah X (arah panjang)
a= 0.75 m
b= 1.1 m
q1x = 183.24 kg/m
= 1.5
MA = MB = -25.77 kgm
Output model SAP a b
MAB = MBA = 55.43 kgm A
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Mcrack = fr*Ig/y = 1293178.125 Nmm = 1.293 kNm = 129.3 kgm > Mmax = 83.14515 kg
Kondisi Penumpukan
a = 1/5*L = 0.52 m
b = (L-2a) = 1.56 m
q1x =t*B*2400 = 183.24 kg/m
y = 0.5*t = 37.5 mm
q=
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Pemasangan
- Gaya geser
Vu = 1.15wu.ln = 1426.828 kg
2
Vc = 1/6fc'bwd = 8732.482 kg
Vc = 6549.362 kg
Jadi Vu < Vc, Maka tidak perlu tulangan geser. OK
Date : 5/2/2013
| LOGO | Project : Hotel Panghegar
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Half Slab
Utama
Tambahan
Topping
U6 - 200 mm
mm
mm
mm
91.62 kg/m
b a
B
kgm > Mmax = 83.14515 kgm ( OK)
25 mm
234.00 kg/m
b a
50 mm
183.24 kg/m
b a
50 mm
105 mm
M6 - 150 mm
U10 - 1500 mm
Mu 1063.66
Mn = = 1329.57 kgm
0.8
Koefisien Ketahanan Rn;
Mn 132957
Rn = = 12.06 kg/cm2
bd2
100 x 10.5^2
fy 500
Rn = fy 1 0.59 500 1 0.59
fc ' 24.9
Rn = 500 - 5923.695 2
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Rn = 500 - 5923.695 2
Pembatasan nilai ;
0,85 fc ' b1 600 0,85 x 24,9 x 0,85
b x 0,545 = 0.0196257
fy 600 + fy 500
3.028
aktual = = 0.00288
100 x 10.5
As x fy = 0.72 cm
lengan momen dalam = a =
0.85 x fc' x b
Momen nominal
Mn = As fy (d-a/2) = 1535.196 kgm
Jadi, Mn aktual > Mn perlu (1329.57 kgm) OK
Kondisi Stripping
- Tinjauan arah X (arah panjang)
a= 0.5 m
b= 2.3 m
q1x = 211.2 kg/m
= 1.5
MA = MB = -13.20 kgm
Output model SAP a b
MAB = MBA = -13.20 kgm A
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Mcrack = fr*Ig/y = 1589866.667 Nmm = 1.59 kNm = 159 kgm > Mmax = 19.8 kgm (
Kondisi Penumpukan
a = 1/5*L = 0.66 m
b = (L-2a) = 1.98 m
q1x =t*B*2400 = 211.2 kg/m
y = 0.5*t = 40 mm
q=
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Pemasangan
Half Slab
Utama
Tambahan
Topping
U6 - 100 mm
mm
mm
mm
105.60 kg/m
b a
B
kgm > Mmax = 19.8 kgm ( OK)
25 mm
316.80 kg/m
b a
55 mm
211.20 kg/m
b a
55 mm
105 mm
M6 - 150 mm
U10 - 600 mm
Mu 564.94
Mn = = 706.18 kgm
0.8
Koefisien Ketahanan Rn;
Mn 70618
Rn = = 6.41 kg/cm2
bd2
100 x 10.5^2
fy 500
Rn = fy 1 0.59 500 1 0.59
fc ' 24.9
Rn = 500 - 5923.695 2
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Rn = 500 - 5923.695 2
Pembatasan nilai ;
0,85 fc ' b1 600 0,85 x 24,9 x 0,85
b x 0,545 = 0.0196257
fy 600 + fy 500
3.028
aktual = = 0.00288
100 x 10.5
As x fy = 0.72 cm
lengan momen dalam = a =
0.85 x fc' x b
Momen nominal
Mn = As fy (d-a/2) = 1535.196 kgm
Jadi, Mn aktual > Mn perlu (706.18 kgm) OK
Kondisi Stripping
- Tinjauan arah X (arah panjang)
a= 0.5 m
b= 1.405 m
q1x = 158.4 kg/m
= 1.5
MA = MB = -9.90 kgm
Output model SAP a b
MAB = MBA = -9.90 kgm A
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Penumpukan
a = 1/5*L = 0.481 m
b = (L-2a) = 1.443 m
q1x =t*B*2400 = 158.4 kg/m
y = 0.5*t = 40 mm
q=
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Pemasangan
- Gaya geser
Vu = 1.15wu.ln = 1485.761 kg
2
Vc = 1/6fc'bwd = 8732.482 kg
Vc = 6549.362 kg
Jadi Vu < Vc, Maka tidak perlu tulangan geser. OK
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Half Slab
Utama
Tambahan
Topping
U6 - 100 mm
mm
mm
mm
79.20 kg/m
b a
B
kgm > Mmax = 14.85 kgm ( OK)
25 mm
230.88 kg/m
b a
55 mm
158.40 kg/m
b a
55 mm
105 mm
M6 - 150 mm
U10 - 600 mm
Mu 1582.36
Mn = = 1977.95 kgm
0.8
Koefisien Ketahanan Rn;
Mn 197795
Rn = = 17.94 kg/cm2
bd2
100 x 10.5^2
fy 500
Rn = fy 1 0.59 500 1 0.59
fc ' 24.9
Rn = 500 - 5923.695 2
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Rn = 500 - 5923.695 2
Pembatasan nilai ;
0,85 fc ' b1 600 0,85 x 24,9 x 0,85
b x 0,545 = 0.0196257
fy 600 + fy 500
4.076
aktual = = 0.00388
100 x 10.5
As x fy = 0.96 cm
lengan momen dalam = a =
0.85 x fc' x b
Momen nominal
Mn = As fy (d-a/2) = 2042.076 kgm
Jadi, Mn aktual > Mn perlu (1977.95 kgm) OK
Kondisi Stripping
- Tinjauan arah X (arah panjang)
a= 0.5 m
b= 3.025 m
q1x = 139.2 kg/m
= 1.5
MA = MB = -8.70 kgm
Output model SAP a b
MAB = MBA = -8.70 kgm A
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Mcrack = fr*Ig/y = 1047866.667 Nmm = 1.048 kNm = 104.8 kgm > Mmax = 13.05 kgm (
Kondisi Penumpukan
a = 1/5*L = 0.805 m
b = (L-2a) = 2.415 m
q1x =t*B*2400 = 139.2 kg/m
y = 0.5*t = 40 mm
q=
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Pemasangan
- Gaya geser
Vu = 1.15wu.ln = 2486.565 kg
2
Vc = 1/6fc'bwd = 8732.482 kg
Vc = 6549.362 kg
Jadi Vu < Vc, Maka tidak perlu tulangan geser. OK
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Half Slab
Utama
Tambahan
Topping
U6 - 76.92 mm
mm
mm
mm
69.60 kg/m
b a
B
kgm > Mmax = 13.05 kgm ( OK)
25 mm
386.40 kg/m
b a
55 mm
139.20 kg/m
b a
55 mm
105 mm
M6 - 150 mm
U10 - 300 mm
Mu 1265.84
Mn = = 1582.30 kgm
0.8
Koefisien Ketahanan Rn;
Mn 158230
Rn = = 14.35 kg/cm2
bd2
100 x 10.5^2
fy 500
Rn = fy 1 0.59 500 1 0.59
fc ' 24.9
Rn = 500 - 5923.695 2
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Rn = 500 - 5923.695 2
Pembatasan nilai ;
0,85 fc ' b1 600 0,85 x 24,9 x 0,85
b x 0,545 = 0.0196257
fy 600 + fy 500
3.38
aktual = = 0.00322
100 x 10.5
As x fy = 0.8 cm
lengan momen dalam = a =
0.85 x fc' x b
Momen nominal
Mn = As fy (d-a/2) = 1706.9 kgm
Jadi, Mn aktual > Mn perlu (1582.3 kgm) OK
Kondisi Stripping
- Tinjauan arah X (arah panjang)
a= 0.5 m
b= 2.6 m
q1x = 158.4 kg/m
= 1.5
MA = MB = -9.90 kgm
Output model SAP a b
MAB = MBA = -9.90 kgm A
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Penumpukan
a = 1/5*L = 0.72 m
b = (L-2a) = 2.16 m
q1x =t*B*2400 = 158.4 kg/m
y = 0.5*t = 40 mm
q=
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Pemasangan
- Gaya geser
Vu = 1.15wu.ln = 2224.008 kg
2
Vc = 1/6fc'bwd = 8732.482 kg
Vc = 6549.362 kg
Jadi Vu < Vc, Maka tidak perlu tulangan geser. OK
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Half Slab
Utama
Tambahan
Topping
U6 - 90.91 mm
mm
mm
mm
79.20 kg/m
b a
B
kgm > Mmax = 14.85 kgm ( OK)
25 mm
345.60 kg/m
b a
55 mm
158.40 kg/m
b a
55 mm
105 mm
M6 - 150 mm
U10 - 450 mm
Mu 1337.14
Mn = = 1671.42 kgm
0.8
Koefisien Ketahanan Rn;
Mn 167142
Rn = = 15.16 kg/cm2
bd2
100 x 10.5^2
fy 500
Rn = fy 1 0.59 500 1 0.59
fc ' 24.9
Rn = 500 - 5923.695 2
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Rn = 500 - 5923.695 2
Pembatasan nilai ;
0,85 fc ' b1 600 0,85 x 24,9 x 0,85
b x 0,545 = 0.0196257
fy 600 + fy 500
3.38
aktual = = 0.00322
100 x 10.5
As x fy = 0.8 cm
lengan momen dalam = a =
0.85 x fc' x b
Momen nominal
Mn = As fy (d-a/2) = 1706.9 kgm
Jadi, Mn aktual > Mn perlu (1671.42 kgm) OK
Kondisi Stripping
- Tinjauan arah X (arah panjang)
a= 0.5 m
b= 2.7 m
q1x = 192 kg/m
= 1.5
MA = MB = -12.00 kgm
Output model SAP a b
MAB = MBA = -12.00 kgm A
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Mcrack = fr*Ig/y = 1445333.333 Nmm = 1.445 kNm = 144.5 kgm > Mmax = 18 kgm ( O
Kondisi Penumpukan
a = 1/5*L = 0.74 m
b = (L-2a) = 2.22 m
q1x =t*B*2400 = 192 kg/m
y = 0.5*t = 40 mm
q=
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Pemasangan
- Gaya geser
Vu = 1.15wu.ln = 2285.786 kg
2
Vc = 1/6fc'bwd = 8732.482 kg
Vc = 6549.362 kg
Jadi Vu < Vc, Maka tidak perlu tulangan geser. OK
Date : 19/8-10
| LOGO | Project : Hotel Patra Jasa
HERE Engineer : MR
YL Engineers Indonesia Doc. Type : Calculation Sheet
Half Slab
Utama
Tambahan
Topping
U6 - 90.91 mm
mm
mm
mm
96.00 kg/m
b a
B
kgm > Mmax = 18 kgm ( OK)
25 mm
355.20 kg/m
b a
55 mm
192.00 kg/m
b a
55 mm
105 mm
M6 - 150 mm
U10 - 450 mm
Mu 364.62
Mn = = 455.78 kgm
0.8
Koefisien Ketahanan Rn;
Mn 45578
Rn = = 4.13 kg/cm2
bd2 100 x 10.5^2
fy 500
Rn = fy 1 0.59 500 1 0.59
fc ' 24.9
Rn = 500 - 5923.695 2
Date : 19/8-10
| LOGO | Project : Rusunami Sanggar Hurip, Bandung
HERE Engineer : YS
YL Engineers Indonesia Doc. Type : Calculation Sheet
Pembatasan nilai ;
0,85 fc ' b1 600 0,85 x 24,9 x 0,85
b x 0,545 = 0.01962573
fy 600 + fy 500
Kondisi Stripping
- Tinjauan arah X (arah panjang)
a= 0.5 m
b= 1.05 m
q1x = 194.496 kg/m
= 1.5
MA = MB = -12.16 kgm
Output model SAP a b
MAB = MBA = -12.16 kgm A
Date : 19/8-10
| LOGO | Project : Rusunami Sanggar Hurip, Bandung
HERE Engineer : YS
YL Engineers Indonesia Doc. Type : Calculation Sheet
Mcrack = fr*Ig/y = 1464122.667 Nmm = 1.464 kNm = 146.4 kgm > Mmax = 18.234 kgm (
Kondisi Penumpukan
a = 1/5*L = 0.41 m
b = (L-2a) = 1.23 m
q1x =t*B*2400 = 194.496 kg/m
y = 0.5*t = 40 mm
q=
Date : 19/8-10
| LOGO | Project : Rusunami Sanggar Hurip, Bandung
HERE Engineer : YS
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Pemasangan
Vu = 1.15wu.ln = 1124.999 kg
2
Vc = 1/6fc'bwd = 8732.482 kg
Vc = 6549.362 kg
Jadi Vu < Vc, Maka tidak perlu tulangan geser. OK
Date : 19/8-10
| LOGO | Project : Rusunami Sanggar Hurip, Bandung
HERE Engineer : YS
YL Engineers Indonesia Doc. Type : Calculation Sheet
Half Slab
Utama
Tambahan
Topping
U6 - 333.33 mm
mm
mm
mm
97.25 kg/m
b a
B
gm > Mmax = 18.234 kgm ( OK)
25 mm
196.80 kg/m
b a
55 mm
194.50 kg/m
b a
55 mm
105 mm
M6 - 150 mm
-
U10 - 400 mm
Date : 19/8-10
| LOGO | Project : Rusunami Sanggar Hurip, Bandung
HERE Engineer : YS
YL Engineers Indonesia Doc. Type : Calculation Sheet
Mu 1093.44
Mn = = 1366.80 kgm
0.8
Koefisien Ketahanan Rn;
Mn 136680
Rn = = 12.40 kg/cm2
bd2
100 x 10.5^2
fy 500
Rn = fy 1 0.59 500 1 0.59
fc ' 24.9
Rn = 500 - 5923.695 2
Date : 19/8-10
| LOGO | Project : Rusunami Sanggar Hurip, Bandung
HERE Engineer : YS
YL Engineers Indonesia Doc. Type : Calculation Sheet
Rn = 500 - 5923.695 2
Pembatasan nilai ;
0,85 fc ' b1 600 0,85 x 24,9 x 0,85
b x 0,545 = 0.0196257
fy 600 + fy 500
3.38
aktual = = 0.00322
100 x 10.5
As x fy = 0.8 cm
lengan momen dalam = a =
0.85 x fc' x b
Momen nominal
Mn = As fy (d-a/2) = 1706.9 kgm
Jadi, Mn aktual > Mn perlu (1366.8 kgm) OK
Kondisi Stripping
- Tinjauan arah X (arah panjang)
a= 0.5 m
b= 2.55 m
q1x = 194.496 kg/m
= 1.5
MA = MB = -12.16 kgm
Output model SAP a b
MAB = MBA = -12.16 kgm A
Date : 19/8-10
| LOGO | Project : Rusunami Sanggar Hurip, Bandung
HERE Engineer : YS
YL Engineers Indonesia Doc. Type : Calculation Sheet
Mcrack = fr*Ig/y = 1464122.667 Nmm = 1.464 kNm = 146.4 kgm > Mmax = 18.234 kgm (
Kondisi Penumpukan
a = 1/5*L = 0.71 m
b = (L-2a) = 2.13 m
q1x =t*B*2400 = 194.496 kg/m
y = 0.5*t = 40 mm
q=
Date : 19/8-10
| LOGO | Project : Rusunami Sanggar Hurip, Bandung
HERE Engineer : YS
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Pemasangan
Vu = 1.15wu.ln = 1948.169 kg
2
Vc = 1/6fc'bwd = 8732.482 kg
Vc = 6549.362 kg
Jadi Vu < Vc, Maka tidak perlu tulangan geser. OK
Date : 19/8-10
| LOGO | Project : Rusunami Sanggar Hurip, Bandung
HERE Engineer : YS
YL Engineers Indonesia Doc. Type : Calculation Sheet
Half Slab
Utama
Tambahan
Topping
U6 - 111.11 mm
mm
mm
mm
97.25 kg/m
b a
B
kgm > Mmax = 18.234 kgm ( OK)
25 mm
340.80 kg/m
b a
55 mm
194.50 kg/m
b a
55 mm
105 mm
u ( Not OK)
M6 - 150 mm
U10 - 450 mm
U10 - 400 mm
Date : 19/8-10
| LOGO | Project : Rusunami Sanggar Hurip, Bandung
HERE Engineer : YS
YL Engineers Indonesia Doc. Type : Calculation Sheet
Mu 2359.51
Mn = = 2949.39 kgm
0.8
Koefisien Ketahanan Rn;
Mn 294939
Rn = = 26.75 kg/cm2
100 x 10.5^2
bd2
Rn = fy 500
fy 1 0.59 500 1 0.59
fc ' 24.9
Rn = 500 - 5923.695 2
Date : 19/8-10
| LOGO | Project : Rusunami Sanggar Hurip, Bandung
HERE Engineer : YS
YL Engineers Indonesia Doc. Type : Calculation Sheet
Pembatasan nilai ;
0,85 fc ' b1 600 0,85 x 24,9 x 0,85
b x 0,545 = 0.019626
fy 600 + fy 500
Kondisi Stripping
- Tinjauan arah X (arah panjang)
a= 0.5 m
b= 1.2 m
c= 1.67
q1x = 481.5 kg/m
= 1.5
MA = MD = -30.09 kgm a b
MB=MC -46.04 kgm Output model SAP A B
MAB = MCD = 3.11 kgm
MBC= 37.89 kgm
Kondisi Penumpukan
a= 0.5 m
b= 1.2 m
c= 1.67 m
q1x =t*B*2400 = 481.5 kg/m
y = 0.5*t = 37.5 mm
q=
MA = MD = -60.19 kgm Output model SAP
MB=MC -92.08 kgm 92.08
MAB = MCD = 6.22 kgm
MBC= 75.77 kgm a b c
A B
Date : 19/8-10
| LOGO | Project : Rusunami Sanggar Hurip, Bandung
HERE Engineer : YS
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Pemasangan
Mu = 196.93 kgm
Mmax 196.93
Mn = = = 246.16 kgm
0.8
asumsi precast Half Slab dipasang pada umur 1 hari sehingga fc' = 6 Mpa
a= 6.16 cm
Mn = As fy (d-a/2) = 602.88 kgm > Mn perlu ( OK) d=
Rn = fy 500
fy 1 0.59 500 1 0.59
fc ' 2 24.9
Rn = 500 - 5923.695
- Gaya geser
Vu = 1.15wu.ln = 2903.483 kg
2
Vc = 1/6fc'bwd = 8732.482 kg
Vc = 6549.362 kg
Jadi Vu < Vc, Maka tidak perlu tulangan geser. OK
Grid 1 Grid 2
Half Slab
Grid 1
Grid 2
Topping
U10 - 142.86 mm
mm
mm
mm
240.75 kg/m
b a
C D
25 mm
462.60 kg/m
b a
50 mm
481.50 kg/m
b a
C D
kgm > Mmax = 92.08 kgm ( OK)
50 mm
50 mm
105 mm
U10 - 140 mm
P8 - 200 mm
U10 - 100 mm
Date : 19/8-10
| LOGO | Project : Rusunami Sanggar Hurip, Bandung
HERE Engineer : YS
YL Engineers Indonesia Doc. Type : Calculation Sheet
Mu 984.40
Mn = = 1230.50 kgm
0.8
Koefisien Ketahanan Rn;
Mn 123050
Rn = = 11.16 kg/cm2
bd 2 100 x 10.5^2
Rn = fy 500
fy 1 0.59 500 1 0.59
fc ' 24.9
Rn = 500 - 5923.695 2
Date : 19/8-10
| LOGO | Project : Rusunami Sanggar Hurip, Bandung
HERE Engineer : YS
YL Engineers Indonesia Doc. Type : Calculation Sheet
Pembatasan nilai ;
0,85 fc ' b1 600 0,85 x 24,9 x 0,85
b x 0,545 = 0.019626
fy 600 + fy 500
Kondisi Stripping
- Tinjauan arah X (arah panjang)
a= 0.664 m
b= 1.992 m
q1x = 376.56 kg/m
= 1.5
MA = MC = -41.51 kgm
MB= 70.00 kgm Output model SAP a
A
Date : 19/8-10
| LOGO | Project : Rusunami Sanggar Hurip, Bandung
HERE Engineer : YS
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Penumpukan
a = 1/5*L = 0.664 m
b = (L-2a) = 1.992 m
q1x =t*B*2400 = 376.56 kg/m
y = 0.5*t = 37.5 mm
q=
Date : 19/8-10
| LOGO | Project : Rusunami Sanggar Hurip, Bandung
HERE Engineer : YS
YL Engineers Indonesia Doc. Type : Calculation Sheet
Kondisi Pemasangan
Vu = 1.15wu.ln = 1875.402 kg
2
Vc = 1/6fc'bwd = 8732.482 kg
Vc = 6549.362 kg
Jadi Vu < Vc, Maka tidak perlu tulangan geser. OK
Date : 19/8-10
| LOGO | Project : Rusunami Sanggar Hurip, Bandung
HERE Engineer : YS
YL Engineers Indonesia Doc. Type : Calculation Sheet
Grid 1 Grid 2
Half Slab
Grid 1
Grid 2
Topping
U8 - 250 mm
mm
mm
mm
188.28 kg/m
b a
B
kgm > Mmax = 105 kgm ( OK)
25 mm
298.80 kg/m
b a
50 mm
376.56 kg/m
b a
50 mm
105 mm
U8 - 200 mm
P8 - 250 mm
U10 - 150 mm
50417.01 13444.54
312
954.4
1908.8
255
875
D10 - 200
392.6991 mm2
9424.778
1.728583
4868843
4.868843