Sup)
Assign Cnom = 35 mm
1/2 Io = 4.69 m
Fig10 CEC Clear span of slab on one side
b1 = 2.61 m = 4.4
b2 = 2.61 m
Actual flange width
1+2+
b =
= 5.52 m
0.21+0.1 pick value
Beff,1 = Least of : = 0.99 m = 0.9384
0.2
= 0.9384 m = 0.94
1
= 2.61 m
Beff,1 = 0.94 m
0.22+0.1
Beff,2 = Least of : = 0.9912 pick value
0.2
= 0.9384 = 0.9384
2
= 2.61 = 0.9384
Beff,2 = 0.9384 m
/ = 0.0168899
= 0.5+(0.250.882) = 0.98
= 0.2331101
/ = 0.4828148
CHECK 0.82 < < 0.95
0.82 < 0.98 < 0.95
/
Assign / = 0.95 OK
Lever Arm
/
z = x d = 420.85 mm
Hf = 210 mm
CHECK x < Hf
55.38 < 210
NA within Flange - rectangular compressive zone
NA 9.2 ( b = bw = 300 )
CRACKING @ SLS
No. Bar = 9 mm 8
Steel = 12 mm
Spacing = 175 mm
Clear spacing =( 102 / 8 )= 12.75 = 102
435((+0.3)/(1.35+1.5))((,)/(,))
Service stress s = = 212.65902 0.98774504
= 457.54176
= 199.70 / ^2
= 0.464786
SHEAR @ ULS
CEC 2 Design value of the maximum applied Shear Force on the end span,
S.15.3
VED = 0.63(+)
= 288.25 kN
State, bw = 300 mm
VED = 2.41
/ ^2
Try , /
= 0.804 ^2/
CHECK , / /1087
>
CHECK , /
( 0.08 ^0.5 "bw " )/500
>