For Piling/Excavation/Temporary Earth-Retaining Works: (To Be Submitted Together With Permit Application Form)
For Piling/Excavation/Temporary Earth-Retaining Works: (To Be Submitted Together With Permit Application Form)
Project Title : PROPOSED INTERIM BUS DEPOT WITH SINGLE STOREY WORKSHOP AND TWO
STOREY ANCILLARY FACILITIES ON LOT (S) 04150M PT & 04238V PT MK31 AT LOYANG AVENUE
Pre-construction Survey
I confirm that
(a) I will give a copy of the pre-construction survey to each owner of neighbouring
properties when it is ready, but before work commences on site. Each owner will be
given the portion of the survey which is relevant to his property.
I will inform BCA of the date of commencement of piling / excavation works at least one
week in advance using the reply slip (Annex A2).
__________________________ _____________________
Builders Name & Signature Builders Company Stamp
_______________
Date
Annex A2
To :
Building and Construction Authority
5 Maxwell Road, #05-00
Tower Block MND Complex
Singapore 069110
Attn. Ms. Tan Sook Eng
Fax : 63257482
Project Title: PROPOSED INTERIM BUS DEPOT WITH SINGLE STOREY WORKSHOP AND TWO STOREY
ANCILLARY FACILITIES ON LOT (S) 04150M PT & 04238V PT MK31 AT LOYANG AVENUE
I would like to inform that piling / excavation* works will commence at site on
__________ .
(Date)
__________________________ _____________________
Builders Name & Signature Builders Company Stamp
______________
Date
* Pls delete accordingly. If there are excavation works followed by piling works, BCA
should also be notified on commencement of excavation works.