Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

Building Assessment form

Component Condition assessment - either Cost


OK What needs to be done and why? ($000)1
(ie current materials, their condition
and whether repair or replacement is
required)
Site Conditions
Accessibility
requirements
Base/Foundations
Floor
Cladding
Windows
Doors
Roof
Ceilings
Linings
Floor coverings
Lighting
Electrical
Plumbing
Mechanical
Fire protection
Interior painting
Exterior painting
Other
______________
Total cost estimate

General observations:
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________

This condition assessment has been undertaken by (name of consultant and sign-off):
_______________________________________________________

The cost estimates have been prepared by (name of consultant and sign-off):
_______________________________________________________

1
Including all fees eg consultants fees.

You might also like