ID Task Name Duration Complete


Overll Progress increment
1 Construction 457 days 58%
2 Bridges 381 days 61%
19 Piling work- Kek 92 days 20%
33 Wattegama Extended Bridge 334 days 70%
40 Bridge deck system-Wat Ex 115 days 21%
41 Wattegama Bridge 330 days 53%
45 T girder precast- Wat 153 days 91%
48 Bridge deck system- Wat 120 days 9%
89 DK16+440.5 Overpass 135 days 22%
92 End wall and backfilling-op 51 days 0%
93 DK17+757 Overpass 135 days 22%
95 Permanent lining-op 53 days 0%
97 DK18+458.3 Overpass 135 days 22%
99 Permanent lining-op 53 days 0%
121 Earthwork & Culverts 314 days 68%
125 Section 2 DK1+200 DK6+300 314 days 64%
135 Earth WorkDK3+116.7DK5+150 148 days 32%
136 Excavation 91 days 0%
139 Retaining wall 91 days 95%
140 DK3+180-DK3+360RHS-rtw 91 days 95%
143 Drainage ditch 176 days 9%
145 Earth WorkDK5+764DK6+300 152 days 14%
147 Filling 121 days 13%
157 Turfing 26 days 19%
165 Section 3 DK6+300 DK10+000 184 days 81%
166 Earth Work 178 days 91%
168 Filling 178 days 91%
183 Drainage ditch 134 days 48%
184 Turfing 148 days 85%
185 Culvert 107 days 73%
186 DK9+425-cul 107 days 73%
187 section 4 DK10+000 DK16+050 301 days 76%
188 Earth WorkDK10+000DK14+538.9 301 days 65%
189 Excavation 300 days 87%
191 Filling the area of platforms DK12+801.5DK13+201.5 208 days 65%
192 Filling the area excludes station buildings and platforms 229 days 69%
193 Soft ground treatmentDK12+490-DK12+551.28 180 days 10%
194 Retaining wall 199 days 92%
204 DK13+143-DK13+215RHS-rtw 113 days 89%
209 DK14+470-DK14+538RHS-rtw 91 days 0%
210 Drainage ditch 285 days 30%
211 Turfing 273 days 43%
219 Section 5 DK16+050 DK20+500 263 days 78%
220 Earth Work 263 days 66%
221 Excavation 92 days 84%

223 Filling the area of station platform DK16+976.33DK17+276.33 184 days 57%

224 Filling the area excludes station buildings and platforms 234 days 50%
239 Soil nailing wall 231 days 94%
242 DK17+850-DK17+910RHS-SN 71 days 67%
248 Drainage ditch 240 days 31%
249 Turfing 240 days 47%
254 Section 6 DK20+500 DK26+000 240 days 52%
255 Earth Work 203 days 41%
258 Filling the area excludes platform 183 days 40%
259 Retaining wall 154 days 88%
260 DK20+670-DK20+776RHS-rtw 31 days 0%
269 Drainage ditch 183 days 34%
286 Stations 349 days 7%
287 DK1Substation 117 days 6%
289 substation Buildings DK1 103 days 12%
295 DK6 Station 298 days 18%
297 Station Buildings-DK6 244 days 13%
298 Platform-DK6 201 days 16%
299 DK12 Station 211 days 5%
301 Station Buildings-DK12 211 days 0%
302 Platform-DK12 177 days 10%
303 DK17 Station 242 days 13%
306 Platform-DK17 211 days 8%
307 DK26 Station 273 days 0%
309 Station Buildings-DK26 273 days 0%
2017 Apr % 2017 May%
Complete Complete
1%
61% 64% 3%
68% 71% 3%
0% 20% 20%
78% 81% 3%
39% 49% 10%
57% 61% 4%
95% 100% 5%
21% 27% 6%
62% 77% 15%
0% 40% 40%
49% 62% 13%
67% 100% 33%
22% 62% 40%
0% 100% 100%
71% 74% 3%
67% 69% 2%
32% 39% 7%
0% 20% 20%
95% 98% 3%
95% 98% 3%
9% 11% 2%
49% 55% 6%
51% 58% 7%
19% 32% 13%
85% 87% 2%
94% 96% 2%
95% 98% 3%
56% 62% 6%
91% 94% 3%
91% 100% 9%
91% 100% 9%
78% 82% 4%
71% 77% 6%
88% 92% 4%
68% 74% 6%
81% 88% 7%
27% 44% 17%
92% 95% 3%
89% 94% 5%
0% 43% 43%
35% 42% 7%
48% 51% 3%
80% 84% 4%
71% 78% 7%
85% 88% 3%

58% 63% 5%

62% 77% 15%


94% 98% 4%
67% 93% 26%
32% 36% 4%
56% 65% 9%
55% 58% 3%
43% 45% 2%
45% 50% 5%
90% 97% 7%
0% 78% 78%
37% 38% 1%
11% 12% 1%
13% 14% 1%
13% 15% 2%
27% 28% 1%
19% 20% 1%
30% 32% 2%
11% 13% 2%
8% 10% 2%
14% 16% 2%
15% 16% 1%
9% 10% 1%
1% 2% 1%
1% 4% 3%
Task Name

Drainage ditch
Filling
Soft ground treatmentDK1+300DK1+538
DK1+200~ DK1+265
Drainage ditch
Turfing
Excavation
Filling
Soft ground treatmentDK3+116DK3+180
DK3+180-DK3+360RHS-rtw
DK5+048-DK5+144RHS
Drainage ditch
Turfing
Excavation
Filling
DK5+977-DK6+025LHS-rtw
DK6+074-DK6+096RHS-rtw
DK6+065-DK6+130LHS-rtw
DK6+130-DK6+145RHS-rtw
DK5+847-DK5+925LHS-SN
DK5+904-DK5+934RHS-SN
Drainage ditch
Turfing
Excavation
Filling
DK7+455-DK7+640LHS-rtw
DK7+825-DK7+865RHS-rtw
DK7+830-DK7+900LHS-rtw
DK7+900-DK7+960LHS-rtw
DK7+960-DK7+980LHS-rtw
DK7+980-DK8+005LHS-rtw
DK8+565-DK8+583LHS-rtw
DK9+615-DK9+720LHS-rtw
DK9+615-DK9+720LHS-rtw
DK9+640-DK9+790RHS-rtw
DK7+135-DK7+210LHS-SN
DK9+615-DK9+690LHS-SN
Drainage ditch
Turfing
Excavation
Filling the area of station buildings DK12+850.5DK12+929.5
Filling the area of platforms DK12+801.5DK13+201.5
Filling the area excludes station buildings and platforms
Soft ground treatmentDK12+490-DK12+551.28
DK10+225-DK10+295RHS-rtw
DK10+314-DK10+365LHS-rtw
DK11+165-DK11+225RHS-rtw
DK11+530-DK11+645LHS-rtw
DK11+645-DK11+765LHS-rtw
DK11+865-DK12+100LHS-rtw
DK12+215-DK12+290RHS-rtw
DK12+345-DK12+357RHS-rtw
DK13+139-DK13+170LHS-rtw
DK13+143-DK13+215RHS-rtw
DK13+324-DK13+495RHS-rtw
DK13+540-DK13+562RHS-rtw
DK13+730-DK13+940Both-rtw
DK14+205-DK14+265RHS-rtw
DK14+470-DK14+538RHS-rtw
Drainage ditch
Turfing
Excavation
Filling the area of station buildings DK17+063.85 DK17+142.85
Filling the area of station platform DK16+976.33DK17+276.33
Filling the area excludes station buildings and platforms
DK16+065-DK16+155RHS-rtw
DK16+210-DK16+245LHS-rtw
DK16+410-DK16+490LHS-rtw
DK17+010-DK17+045LHS-rtw
DK17+070-DK17+125LHS-rtw
DK17+200-DK17+230LHS-rtw
DK17+335-DK17+420LHS-rtw
DK17+468-DK17+488LHS-rtw
DK17+469-DK17+499RHS-rtw
DK17+358-DK17+458RHS-rtw
DK17+743-DK17+770RHS-rtw
DK17+910-DK17+945RHS-rtw
DK18+285-DK18+460LHS-rtw
DK16+425-DK16+740RHS-SN
DK17+770-DK17+816RHS-SN
DK17+850-DK17+910RHS-SN
DK17+970-DK18+010RHS-SN
DK18+340-DK18+405RHS-SN
DK18+375-DK18+425LHS-SN
DK18+460-DK18+630LHS-SN
DK19+980-DK20+170LHS-SN
Drainage ditch
Turfing
Excavation
Filling the area of station platform DK25+794.06 DK26+000
Filling the area excludes platform
DK20+670-DK20+776RHS-rtw
DK24+465-DK24+615RHS-rtw
DK25+622-DK25+650RHS-rtw
DK25+685-DK25+725RHS-rtw
DK25+590-DK25+650LHS-rtw
DK25+775-DK25+863RHS-rtw
DK24+375-DK24+920 RHS SN
DK25+040-DK25+500 LHS SN
Drainage ditch
Turfing
Filling the area of station buildings DK26+054.6DK26+161
Filling the area of station platform DK26+000DK26+214.06
Filling the area excludes station buildings and platforms
DK25+990-DK26+052RHS-rtw
DK26+456-DK26+461RHS-rtw
Drainage ditch
Turfing
%
Duration Complete
92 98% 90.16
29 100% 29
185 100% 185
50 100% 50
54 0% 0
13 0% 0
91 0% 0
148 51% 75.48
183 100% 183
91 95% 86.45
31 100% 31
176 9% 15.84
61 0% 0
14 27% 3.78
121 51% 61.71
63 100% 63
41 0% 0
86 100% 86
26 100% 26
78 100% 78
21 100% 21
84 0% 0
26 19% 4.94
61 92% 56.12
178 95% 169.1
54 100% 54
81 34% 27.54
134 56% 75.04
28 100% 28
5 100% 5
4 100% 4
42 100% 42
118 100% 118
61 100% 61
108 100% 108
31 100% 31
72 100% 72
134 56% 75.04
148 91% 134.68
300 88% 264
183 77% 140.91
208 68% 141.44
229 81% 185.49
180 27% 48.6
61 100% 61
81 100% 81
74 100% 74
9 100% 9
30 100% 30
136 100% 136
122 100% 122
26 100% 26
91 100% 91
113 89% 100.57
113 100% 113
46 100% 46
183 100% 183
78 100% 78
91 0% 0
285 35% 99.75
273 48% 131.04
92 85% 78.2
152 90% 136.8
184 58% 106.72
234 62% 145.08
39 100% 39
46 100% 46
124 100% 124
26 100% 26
26 100% 26
42 100% 42
52 100% 52
36 100% 36
36 100% 36
103 100% 103
90 100% 90
45 100% 45
152 81% 123.12
71 100% 71
71 100% 71
71 67% 47.57
71 100% 71
59 100% 59
25 100% 25
92 93% 85.56
47 100% 47
240 32% 76.8
240 56% 134.4
183 89% 162.87
203 0% 0
183 45% 82.35
31 0% 0
63 100% 63
103 100% 103
41 100% 41
41 96% 39.36
41 100% 41
61 48% 29.28
53 81% 42.93
183 37% 67.71
240 41% 98.4
152 83% 126.16
203 33% 66.99
214 50% 107
30 100% 30
18 100% 18
214 0% 0
268 0% 0
10926 7374.98