TSATI PENSTOCK THICKNESS CALCULATION

BASIC DATA
DATE OF APPROVAL

S.NO. BASIC PARAMETERS NOTATION VALUE


1 Diameter D 575.00
2 Design Discharge Qd 0.66
3 Velocity V 2.54
4 Gross Head Hg 117.86
5 Net Head Hn 105.60
6 Length Of Penstock L 1156.00
7 Assumed Time Ta 5.00
8 FRL At Forbay Lf 3344.93
9 Level of C/L of Penstock at 323 L323 3327.70
10 Level of C/L of Penstock at 642 L642 3313.70
11 Level of C/L of Penstock at 860 L860 3301.71
12 Level of C/L of Penstock at 1156 L1156 3234.86
13 Friction Factor Ff 0.014
14 Joint Efficiency 85%
8/19/2017

15 Hoop Stress $ 75%


16 Tensile Strength St 3600.00
17 Yield Stress Sy 2340.00
18 Allowable Yield Stress Say 800.00
19 Thickness Required for Corrosion & Freezing tc 5.00
DATE OF SUBMISSION
REVISION NO.

1 Minimum Thickness of shell (E) = (D+0.8)/400 1.44


APPROVED BY

A. Sawhney

Water Hammer wave velocity for


2 instantaneous closure (Ai) = 10000/sqrt(50+0.5*D/E) 632.81

3 Time for instantaneous closure (Tc) = 2*L/Ai 3.65


CHECKED BY

Water Hammer wave velocity for


4 assumed time (At) = 2*L/Ta 462.40
CHECKED BY

5 Maximum Water Hammer (hmax) = V*A/g 119.72

MAXIMUM WATER HAMMER 119.72 mtrs


PREPARED BY

J. Kumar

LOA NO.:- LREDA/ Allot./ 2012/ 1261-69 Dated :-


NAME OF CLIENT DRG./ DOC. TITLE DOC. NO.

M/s Ladakh Renewable Energy Development Penstock Thickness Calculation KCPL/LREDA/Penstock/Calc./201


Agency (LREDA)
TSATI PENSTOCK THICKNESS CALCULATION
DATE OF APPROVAL

Thickness Of Penstock From 0 to 323

1 Gross Head (H(g0-323)) = Lf - L323 17.23

2 Friction Losses (Fl) = 0.5*Ff*L0-323*V2/g*D 2.59

3 Net Head (H(n0-45)) = H(g0-323)-Fl 14.64

4 Time Required (Tr) = 2*L0-323/At 1.40


8/19/2017

5 Time Factor (Tf) = Tr/Ta 0.28


0

6 Head Due to Water Hammer (Hh) = Tf*hmax 33.45

7 Total Head (ht) = Hh+H(n0-323) 48.09


DATE OF SUBMISSION
REVISION NO.

8 Pressure (P) = ht/10 4.81

9 Pipe Thickness (tp) = (P*D)/2*Say* 2.03

11 Total Thickness Of Penstock = (tp*10)+tc 7.03


APPROVED BY

A. Sawhney

PIPE THICKNESS FOR SECTION 0 to 323 say 8


CHECKED BY
CHECKED BY
PREPARED BY

J. Kumar

LOA NO.:- LREDA/ Allot./ 2012/ 1261-69 Dated :-


NAME OF CLIENT DRG./ DOC. TITLE DOC. NO.

M/s Ladakh Renewable Energy Development Penstock Thickness Calculation KCPL/LREDA/Penstock/Calc./201


Agency (LREDA)
TSATI PENSTOCK THICKNESS CALCULATION

Thickness Of Penstock From 323 to 642


DATE OF APPROVAL

1 Gross Head (H(g323-642)) = Lf - L642 31.23

2 Friction Losses (Fl) = 0.5*Ff*Lg323-642*V2/g*D 2.55

3 Net Head (H(ng45-135)) = H(gg323-642)-Fl 28.67

4 Time Required (Tr) = 2*Lg323-642/At 1.38

5 Time Factor (Tf) = Tr/Ta 0.28

6 Head Due to Water Hammer (Hh) = Tf*hmax 33.04

7 Total Head (ht) = Hh+H(ng323-642) 61.71

8 Pressure (P) = ht/10 6.17


8/19/2017

9 Pipe Thickness (tp) = (P*D)/2*Say* 2.61


0

10 Thickness Required for Corroison (tc) = 5.00

11 Total Thickness Of Penstock = (tp*10)+tc 7.61


DATE OF SUBMISSION
REVISION NO.

PIPE THICKNESS FOR SECTION 323 to 642 say 8


APPROVED BY

A. Sawhney
CHECKED BY
CHECKED BY
PREPARED BY

J. Kumar

LOA NO.:- LREDA/ Allot./ 2012/ 1261-69 Dated :-


NAME OF CLIENT DRG./ DOC. TITLE DOC. NO.

M/s Ladakh Renewable Energy Development Penstock Thickness Calculation KCPL/LREDA/Penstock/Calc./201


Agency (LREDA)
TSATI PENSTOCK THICKNESS CALCULATION

Thickness Of Penstock From 642 to 860


DATE OF APPROVAL

1 Gross Head (H(g642-860)) = Lf - L860 43.22

2 Friction Losses (Fl) = 0.5*Ff*L642-860*V2/g*D 1.75

3 Net Head (H(n642-860)) = H(g642-860)-Fl 41.48

4 Time Required (Tr) = 2*L642-860/At 0.94

5 Time Factor (Tf) = Tr/Ta 0.19

6 Head Due to Water Hammer (Hh) = Tf*hmax 22.58

7 Total Head (ht) = Hh+H(n642-860) 64.06

8 Pressure (P) = ht/10 6.41


8/19/2017

9 Pipe Thickness (tp) = (P*D)/2*Say* 2.71


0

10 Thickness Required for Corroison (tc) = 5.00

11 Total Thickness Of Penstock = (tp*10)+tc 7.71


DATE OF SUBMISSION
REVISION NO.

PIPE THICKNESS FOR SECTION 642 to 860 say 10


APPROVED BY

A. Sawhney
CHECKED BY
CHECKED BY
PREPARED BY

J. Kumar

LOA NO.:- LREDA/ Allot./ 2012/ 1261-69 Dated :-


NAME OF CLIENT DRG./ DOC. TITLE DOC. NO.

M/s Ladakh Renewable Energy Development Penstock Thickness Calculation KCPL/LREDA/Penstock/Calc./201


Agency (LREDA)
TSATI PENSTOCK THICKNESS CALCULATION

Thickness Of Penstock From 860 to 1156


DATE OF APPROVAL

1 Gross Head (H(g860-1156)) = Lf - L1156 110.07

2 Friction Losses (Fl) = 0.5*Ff*L860-1156*V2/g*D 2.37

3 Net Head (H(n860-1156)) = H(g860-1156)-Fl 107.70

4 Time Required (Tr) = 2*L860-1156/At 1.28

5 Time Factor (Tf) = Tr/Ta 0.26

6 Head Due to Water Hammer (Hh) = Tf*hmax 30.66

7 Total Head (ht) = Hh+H(n860-1156) 138.35

8 Pressure (P) = ht/10 13.84


8/19/2017

9 Pipe Thickness (tp) = (P*D)/2*Say* 5.85


0

10 Thickness Required for Corroison (tc) = 5.00

11 Total Thickness Of Penstock = (tp*10)+tc 10.85


DATE OF SUBMISSION
REVISION NO.

PIPE THICKNESS FOR SECTION 860 to 1156 say 10


APPROVED BY

A. Sawhney
CHECKED BY
CHECKED BY
PREPARED BY

J. Kumar

LOA NO.:- LREDA/ Allot./ 2012/ 1261-69 Dated :-


NAME OF CLIENT DRG./ DOC. TITLE DOC. NO.

M/s Ladakh Renewable Energy Development Penstock Thickness Calculation KCPL/LREDA/Penstock/Calc./201


Agency (LREDA)
ICKNESS CALCULATIONS

C DATA
UNIT
mm
m3/s
m/s
mtrs
mtrs
mtrs
sec.
mtrs
mtrs
mtrs
mtrs
mtrs

kg/cm2
kg/cm2
kg/cm2
mm

mm

m/s

sec.

m/s
mtrs

LREDA/ Allot./ 2012/ 1261-69 Dated :- 06/08/2012


DOC. NO. Pg. No.

KCPL/LREDA/Penstock/Calc./2012/01 1 of 5
ICKNESS CALCULATIONS

mtrs

mtrs

mtrs

sec.

sec.

mtrs

mtrs

kg/cm2

mm

mm

mm
LREDA/ Allot./ 2012/ 1261-69 Dated :- 06/08/2012
DOC. NO. Pg. No.

KCPL/LREDA/Penstock/Calc./2012/01 2 of 5
ICKNESS CALCULATIONS

mtrs

mtrs

mtrs

sec.

sec.

mtrs

mtrs

kg/cm2

mm

mm

mm

mm
LREDA/ Allot./ 2012/ 1261-69 Dated :- 06/08/2012
DOC. NO. Pg. No.

KCPL/LREDA/Penstock/Calc./2012/01 3 of 5
ICKNESS CALCULATIONS

mtrs

mtrs

mtrs

sec.

sec.

mtrs

mtrs

kg/cm2

mm

mm

mm

mm
LREDA/ Allot./ 2012/ 1261-69 Dated :- 06/08/2012
DOC. NO. Pg. No.

KCPL/LREDA/Penstock/Calc./2012/01 4 of 5
ICKNESS CALCULATIONS

mtrs

mtrs

mtrs

sec.

sec.

mtrs

mtrs

kg/cm2

mm

mm

mm

mm
LREDA/ Allot./ 2012/ 1261-69 Dated :- 06/08/2012
DOC. NO. Pg. No.

KCPL/LREDA/Penstock/Calc./2012/01 5 of 5
M/s Kashmirilal Constructions Pvt. Ltd.

BASIC DATA
DATE OF APPROVAL

S.NO. BASIC PARAMETERS NOTATION


1 Diameter D
2 Design Discharge Qd
3 Velocity V
4 Gross Head Hg
5 Net Head Hn
6 Length Of Penstock L
7 Assumed Time Ta
8 FRL At Forbay Lf
9 Level at 45 Bend 1 L45
10 Level at 135 Bend 2 L135
11 Level at 323 Bend 3 L323
12 Level at 448 Bend 4 L448
13 Level at 542 Bend 5 L542
14 Level at 643 Bend 6 L643
15 Level at 861 Bend 7 L861
16 Level at 1094 Bend 8 L1094
17 Level at 1156 Bend 9 L1156
18 Friction Factor Ff
19 Joint Efficiency
8/19/2017

20 Hoop Stress $
0

21 Tensile Strength St
22 Yield Stress Sy
23 Allowable Yield Stress Say
24 Thickness Required for Corrosion tc
DATE OF SUBMISSION
REVISION NO.
APPROVED BY

1 Minimum Thickness of shell (E) = (D+0.8)/400


A. Sawhney

Water Hammer wave velocity for


2 instantaneous closure (Ai) = 10000/sqrt(50+0.5*D/E)
CHECKED BY
3 Time for instantaneous closure (Tc) = 2*L/Ai

Water Hammer wave velocity for 2*L/Ta


4 assumed time (At) =

5 Maximum Water Hammer (hmax) = V*A/g


PREPARED BY

MAXIMUM WATER HAMMER 119.72


J. Kumar

LOA NO.:- LREDA/ Allot./ 2012/ 1261-69 Dated


NAME OF CLIENT DRG./ DOC. TITLE DOC. NO.

M/s Ladakh Renewable Energy Development


Penstock Thickness Calculation KCPL/LREDA/Penstock/Calc./2
Agency (LREDA)

M/s Kashmirilal Constructions Pvt. Ltd.


DATE OF APPROVAL

Thickness Of Penstock From 0 to 45

1 Gross Head (H(g0-45)) = Lf - L45

2 Friction Losses (Fl) = 0.5*Ff*L0-137*V2/g*D

3 Net Head (H(n0-45)) = H(g0-45)-Fl

4 Time Required (Tr) = 2*L0-45/At


8/19/2017

5 Time Factor (Tf) = Tr/Ta


0

6 Head Due to Water Hammer (Hh) = Tf*hmax

7 Total Head (ht) = Hh+H(n0-45)


DATE OF SUBMISSION
REVISION NO.

8 Pressure (P) = ht/10

9 Pipe Thickness (tp) = (P*D)/2*Say*


11 Total Thickness Of Penstock = (tp*10)+tc
APPROVED BY

A. Sawhney

PIPE THICKNESS FOR SECTION 0 to 45


CHECKED BY
PREPARED BY

J. Kumar

LOA NO.:- LREDA/ Allot./ 2012/ 1261-69 Dated


NAME OF CLIENT DRG./ DOC. TITLE DOC. NO.

M/s Ladakh Renewable Energy Development Penstock Thickness Calculation KCPL/LREDA/Penstock/Calc./2


Agency (LREDA)

M/s Kashmirilal Constructions Pvt. Ltd.


Thickness Of Penstock From 45 to 135
DATE OF APPROVAL

1 Gross Head (H(g45-135)) = Lf - L135

2 Friction Losses (Fl) = 0.5*Ff*Lg45-135*V2/g*D

3 Net Head (H(ng45-135)) = H(gg45-135)-Fl

4 Time Required (Tr) = 2*Lg45-135/At

5 Time Factor (Tf) = Tr/Ta

6 Head Due to Water Hammer (Hh) = Tf*hmax

7 Total Head (ht) = Hh+H(ng45-135)

8 Pressure (P) = ht/10


8/19/2017

9 Pipe Thickness (tp) = (P*D)/2*Say*


0
8/19/2017
0
11 Total Thickness Of Penstock = (tp*10)+tc
DATE OF SUBMISSION
REVISION NO.

PIPE THICKNESS FOR SECTION 45 to 135


APPROVED BY

A. Sawhney
CHECKED BY
PREPARED BY

J. Kumar

LOA NO.:- LREDA/ Allot./ 2012/ 1261-69 Dated


NAME OF CLIENT DRG./ DOC. TITLE DOC. NO.

M/s Ladakh Renewable Energy Development


Penstock Thickness Calculation KCPL/LREDA/Penstock/Calc./2
Agency (LREDA)

M/s Kashmirilal Constructions Pvt. Ltd.


Thickness Of Penstock From 135 to 323
DATE OF APPROVAL

1 Gross Head (H(g135-323)) = Lf - L323

2 Friction Losses (Fl) = 0.5*Ff*L135-323*V2/g*D

3 Net Head (H(n135-323)) = H(g135-323)-Fl

4 Time Required (Tr) = 2*L135-323/At

5 Time Factor (Tf) = Tr/Ta

6 Head Due to Water Hammer (Hh) = Tf*hmax


7 Total Head (ht) = Hh+H(n135-323)

8 Pressure (P) = ht/10


8/19/2017

9 Pipe Thickness (tp) = (P*D)/2*Say*


0

10 Thickness Required for Corroison (tc) =

11 Total Thickness Of Penstock = (tp*10)+tc


DATE OF SUBMISSION
REVISION NO.

PIPE THICKNESS FOR SECTION 135 to 323


APPROVED BY

A. Sawhney
CHECKED BY
PREPARED BY

J. Kumar

LOA NO.:- LREDA/ Allot./ 2012/ 1261-69 Dated


NAME OF CLIENT DRG./ DOC. TITLE DOC. NO.

M/s Ladakh Renewable Energy Development


Penstock Thickness Calculation KCPL/LREDA/Penstock/Calc./2
Agency (LREDA)

M/s Kashmirilal Constructions Pvt. Ltd.


Thickness Of Penstock From 323 to 448
DATE OF APPROVAL

1 Gross Head (H(g323-448)) = Lf - L448

2 Friction Losses (Fl) = 0.5*Ff*L323-448*V2/g*D

3 Net Head (H(n323-448)) = H(g323-448)-Fl


4 Time Required (Tr) = 2*L323-448/At

5 Time Factor (Tf) = Tr/Ta

6 Head Due to Water Hammer (Hh) = Tf*hmax

7 Total Head (ht) = Hh+H(n323-448)

8 Pressure (P) = ht/10


8/19/2017

9 Pipe Thickness (tp) = (P*D)/2*Say*


0

10 Thickness Required for Corroison (tc) =

11 Total Thickness Of Penstock = (tp*10)+tc


DATE OF SUBMISSION
REVISION NO.

PIPE THICKNESS FOR SECTION 323 to 448


APPROVED BY

A. Sawhney
CHECKED BY
PREPARED BY

J. Kumar

LOA NO.:- LREDA/ Allot./ 2012/ 1261-69 Dated


NAME OF CLIENT DRG./ DOC. TITLE DOC. NO.

M/s Ladakh Renewable Energy Development Penstock Thickness Calculation KCPL/LREDA/Penstock/Calc./2


Agency (LREDA)

M/s Kashmirilal Constructions Pvt. Ltd.


Thickness Of Penstock From 448 to 542
DATE OF APPROVAL
DATE OF APPROVAL
1 Gross Head (H(g448-542)) = Lf - L542

2 Friction Losses (Fl) = 0.5*Ff*L448-542*V2/g*D

3 Net Head (H(n448-542)) = H(g448-542)-Fl

4 Time Required (Tr) = 2*L448-542/At

5 Time Factor (Tf) = Tr/Ta

6 Head Due to Water Hammer (Hh) = Tf*hmax

7 Total Head (ht) = Hh+H(n448-542)

8 Pressure (P) = ht/10


8/19/2017

9 Pipe Thickness (tp) = (P*D)/2*Say*


0

10 Thickness Required for Corroison (tc) =

11 Total Thickness Of Penstock = (tp*10)+tc


DATE OF SUBMISSION
REVISION NO.

PIPE THICKNESS FOR SECTION 448 to 542


APPROVED BY

A. Sawhney
CHECKED BY
PREPARED BY

J. Kumar

LOA NO.:- LREDA/ Allot./ 2012/ 1261-69 Dated


NAME OF CLIENT DRG./ DOC. TITLE DOC. NO.

M/s Ladakh Renewable Energy Development Penstock Thickness Calculation KCPL/LREDA/Penstock/Calc./2


Agency (LREDA)
M/s Ladakh Renewable Energy Development Penstock Thickness Calculation KCPL/LREDA/Penstock/Calc./2
Agency (LREDA)

M/s Kashmirilal Constructions Pvt. Ltd.


Thickness Of Penstock From 542 to 643
DATE OF APPROVAL

1 Gross Head (H(g542-643)) = Lf - L643

2 Friction Losses (Fl) = 0.5*Ff*L542-643*V2/g*D

3 Net Head (H(n542-643)) = H(g542-643)-Fl

4 Time Required (Tr) = 2*L542-643/At

5 Time Factor (Tf) = Tr/Ta

6 Head Due to Water Hammer (Hh) = Tf*hmax

7 Total Head (ht) = Hh+H(n542-643)

8 Pressure (P) = ht/10


8/19/2017

9 Pipe Thickness (tp) = (P*D)/2*Say*


0

10 Thickness Required for Corroison (tc) =

11 Total Thickness Of Penstock = (tp*10)+tc


DATE OF SUBMISSION
REVISION NO.

PIPE THICKNESS FOR SECTION 542 to 643


APPROVED BY

A. Sawhney
CHECKED BY
PREPARED BY

J. Kumar
PREPARED BY

J. Kumar

LOA NO.:- LREDA/ Allot./ 2012/ 1261-69 Dated


NAME OF CLIENT DRG./ DOC. TITLE DOC. NO.

M/s Ladakh Renewable Energy Development


Penstock Thickness Calculation KCPL/LREDA/Penstock/Calc./2
Agency (LREDA)

M/s Kashmirilal Constructions Pvt. Ltd.


Thickness Of Penstock From 643 to 861
DATE OF APPROVAL

1 Gross Head (H(g643-861)) = Lf - L861

2 Friction Losses (Fl) = 0.5*Ff*L643-861*V2/g*D

3 Net Head (H(n643-861)) = H(g643-861)-Fl

4 Time Required (Tr) = 2*L643-861/At

5 Time Factor (Tf) = Tr/Ta

6 Head Due to Water Hammer (Hh) = Tf*hmax

7 Total Head (ht) = Hh+H(n643-861)

8 Pressure (P) = ht/10


8/19/2017

9 Pipe Thickness (tp) = (P*D)/2*Say*


0

10 Thickness Required for Corroison (tc) =

11 Total Thickness Of Penstock = (tp*10)+tc


DATE OF SUBMISSION
REVISION NO.

PIPE THICKNESS FOR SECTION 643 to 861


APPROVED BY

A. Sawhney
APPROVED BY

A. Sawhney
CHECKED BY
PREPARED BY

J. Kumar

LOA NO.:- LREDA/ Allot./ 2012/ 1261-69 Dated


NAME OF CLIENT DRG./ DOC. TITLE DOC. NO.

M/s Ladakh Renewable Energy Development Penstock Thickness Calculation KCPL/LREDA/Penstock/Calc./2


Agency (LREDA)

M/s Kashmirilal Constructions Pvt. Ltd.


Thickness Of Penstock From 861 to 1094
DATE OF APPROVAL

1 Gross Head (H(g861-1094)) = Lf - L1094

2 Friction Losses (Fl) = 0.5*Ff*L861-1094*V2/g*D

3 Net Head (H(n861-1094)) = H(g861-1094)-Fl

4 Time Required (Tr) = 2*L861-1094/At

5 Time Factor (Tf) = Tr/Ta

6 Head Due to Water Hammer (Hh) = Tf*hmax

7 Total Head (ht) = Hh+H(n861-1094)

8 Pressure (P) = ht/10


8/19/2017

9 Pipe Thickness (tp) = (P*D)/2*Say*


0

10 Thickness Required for Corroison (tc) =

11 Total Thickness Of Penstock = (tp*10)+tc


DATE OF SUBMISSION
REVISION NO.
DATE OF SUBMISSION
REVISION NO.

PIPE THICKNESS FOR SECTION 861 to 1094


APPROVED BY

A. Sawhney
CHECKED BY
PREPARED BY

J. Kumar

LOA NO.:- LREDA/ Allot./ 2012/ 1261-69 Dated


NAME OF CLIENT DRG./ DOC. TITLE DOC. NO.

M/s Ladakh Renewable Energy Development Penstock Thickness Calculation KCPL/LREDA/Penstock/Calc./2


Agency (LREDA)

M/s Kashmirilal Constructions Pvt. Ltd.


Thickness Of Penstock From 1094 to 1156
DATE OF APPROVAL

1 Gross Head (H(g1094-1156)) = Lf - L1156

2 Friction Losses (Fl) = 0.5*Ff*L1094-1156*V2/g*D

3 Net Head (H(n1094-1156)) = H(g1094-1156)-Fl

4 Time Required (Tr) = 2*L1094-1156/At

5 Time Factor (Tf) = Tr/Ta

6 Head Due to Water Hammer (Hh) = Tf*hmax

7 Total Head (ht) = Hh+H(n1094-1156)

8 Pressure (P) = ht/10


8/19/2017
0
8/19/2017
0
9 Pipe Thickness (tp) = (P*D)/2*Say*

10 Thickness Required for Corroison (tc) =

11 Total Thickness Of Penstock = (tp*10)+tc


DATE OF SUBMISSION
REVISION NO.

PIPE THICKNESS FOR SECTION 1094 to 1156


APPROVED BY

A. Sawhney
CHECKED BY
PREPARED BY

J. Kumar

LOA NO.:- LREDA/ Allot./ 2012/ 1261-69 Dated


NAME OF CLIENT DRG./ DOC. TITLE DOC. NO.

M/s Ladakh Renewable Energy Development Penstock Thickness Calculation KCPL/LREDA/Penstock/Calc./2


Agency (LREDA)
ns Pvt. Ltd.

VALUE UNIT
575.00 mm
0.66 m3/s
2.54 m/s
117.86 mtrs
105.60 mtrs
1156.00 mtrs
5.00 sec.
3344.93 mtrs
3337.70 mtrs
3332.70 mtrs
3327.70 mtrs
3325.30 mtrs
3317.85 mtrs
3313.70 mtrs
3301.70 mtrs
3271.70 mtrs
3234.86 mtrs
0.014
85%
75%
3600.00 kg/cm2
2340.00 kg/cm2
800.00 kg/cm2
5.00 mm

1.44 mm

632.81 m/s
3.65 sec.

462.40 m/s

119.72 mtrs

mtrs

EDA/ Allot./ 2012/ 1261-69 Dated :- 06/08/2012


DOC. NO. Pg. No.

KCPL/LREDA/Penstock/Calc./2012/01 1 of 10

ns Pvt. Ltd.

7.23 mtrs

0.36 mtrs

6.87 mtrs

0.19 sec.

0.04 sec.

4.66 mtrs

11.53 mtrs

1.15 kg/cm2

0.49 mm
5.49 mm

say 8 mm

EDA/ Allot./ 2012/ 1261-69 Dated :- 06/08/2012


DOC. NO. Pg. No.

KCPL/LREDA/Penstock/Calc./2012/01 2 of 10

ns Pvt. Ltd.

12.23 mtrs

0.72 mtrs

11.50 mtrs

0.39 sec.

0.08 sec.

9.32 mtrs

20.83 mtrs

2.08 kg/cm2

0.88 mm
5.88 mm

say 8 mm

EDA/ Allot./ 2012/ 1261-69 Dated :- 06/08/2012


DOC. NO. Pg. No.

KCPL/LREDA/Penstock/Calc./2012/01 3 of 10

ns Pvt. Ltd.

17.23 mtrs

1.51 mtrs

15.72 mtrs

0.81 sec.

0.16 sec.

19.47 mtrs
35.19 mtrs

3.52 kg/cm2

1.49 mm

5.00 mm

6.49 mm

say 8 mm

EDA/ Allot./ 2012/ 1261-69 Dated :- 06/08/2012


DOC. NO. Pg. No.

KCPL/LREDA/Penstock/Calc./2012/01 4 of 10

ns Pvt. Ltd.

19.63 mtrs

1.00 mtrs

18.63 mtrs
0.54 sec.

0.11 sec.

12.95 mtrs

31.57 mtrs

3.16 kg/cm2

1.33 mm

5.00 mm

6.33 mm

say 8 mm

EDA/ Allot./ 2012/ 1261-69 Dated :- 06/08/2012


DOC. NO. Pg. No.

KCPL/LREDA/Penstock/Calc./2012/01 5 of 10

ns Pvt. Ltd.
27.08 mtrs

0.75 mtrs

26.33 mtrs

0.41 sec.

0.08 sec.

9.74 mtrs

36.06 mtrs

3.61 kg/cm2

1.52 mm

5.00 mm

6.52 mm

say 8 mm

EDA/ Allot./ 2012/ 1261-69 Dated :- 06/08/2012


DOC. NO. Pg. No.

KCPL/LREDA/Penstock/Calc./2012/01 6 of 10
KCPL/LREDA/Penstock/Calc./2012/01 6 of 10

ns Pvt. Ltd.

31.23 mtrs

0.81 mtrs

30.42 mtrs

0.44 sec.

0.09 sec.

10.46 mtrs

40.88 mtrs

4.09 kg/cm2

1.73 mm

5.00 mm

6.73 mm

say 8 mm
EDA/ Allot./ 2012/ 1261-69 Dated :- 06/08/2012
DOC. NO. Pg. No.

KCPL/LREDA/Penstock/Calc./2012/01 7 of 10

ns Pvt. Ltd.

43.23 mtrs

1.75 mtrs

41.48 mtrs

0.94 sec.

0.19 sec.

8.49 mtrs

49.97 mtrs

5.00 kg/cm2

2.11 mm

5.00 mm

7.11 mm

say 10 mm
EDA/ Allot./ 2012/ 1261-69 Dated :- 06/08/2012
DOC. NO. Pg. No.

KCPL/LREDA/Penstock/Calc./2012/01 8 of 10

ns Pvt. Ltd.

73.23 mtrs

1.87 mtrs

71.36 mtrs

1.01 sec.

0.20 sec.

24.13 mtrs

95.49 mtrs

9.55 kg/cm2

4.04 mm

5.00 mm

9.04 mm
say 10 mm

EDA/ Allot./ 2012/ 1261-69 Dated :- 06/08/2012


DOC. NO. Pg. No.

KCPL/LREDA/Penstock/Calc./2012/01 9 of 10

ns Pvt. Ltd.

110.07 mtrs

0.50 mtrs

109.57 mtrs

0.27 sec.

0.05 sec.

6.42 mtrs

115.99 mtrs

11.60 kg/cm2
4.90 mm

5.00 mm

9.90 mm

say 10 mm

EDA/ Allot./ 2012/ 1261-69 Dated :- 06/08/2012


DOC. NO. Pg. No.

KCPL/LREDA/Penstock/Calc./2012/01 10 of 10