CONSTRUCTION ONE MONTH LOOKAHEAD SCHEDULE-JULY 2017

8.68%
WEEKLY TARGET
COMPLETED COMPLETED REMAINING TARGET TARGET TO MONTHLY CUM.
ACTIVITY ID DESCRIPTION Unit QUANTITY WT%
QTY % QTY TO % QUANTITY TARGET QTY. W1 W2 W3 W4 TARGET %

Kindergarten
Civil Works
Ground Floor
KGN.CE.GF2000 Hollow Concrete Block Works M2 1415 1312.8 92.78% 102.2 100.00% 1415 102.2 25.55 25.55 25.55 25.55 0.01% 0.15%
KGN.CE.GF2010 Hollow Concrete Pre-insulated Blocks with Foam M2 20 18.1 90.50% 1.9 100.00% 20 1.9 0.475 0.475 0.475 0.475 0.01% 0.13%
KGN.CE.GF2020 Miscellaneous Concrete Works (Lintels, Jambs, Sills, etc.) M3 22 18.5 84.09% 3.5 100.00% 22 3.5 0.875 0.875 0.875 0.875 0.00% 0.02%
Roof Floor
KGN.CE.RF2510 100mm thick Concrete Cap on Top of Parapet LM 202 202 10.00% 20.2 20.2 5.05 5.05 5.05 5.05 0.00% 0.01%
KGN.CE.RF3000 50 mm thick Screed to Slope to Roof M2 1482 1482 10.00% 148.2 148.2 37.05 37.05 37.05 37.05 0.00% 0.01%
MEP Works
Ground Floor
Plumbing Works
KGN.ME.GF1510 Drainage System LS 1 0.89 89.00% 0.11 100.00% 1 0.11 0.0275 0.0275 0.0275 0.0275 0.01% 0.07%
KGN.ME.GF1500 Water Supply Piping System, including Valves LS 1 0.73 73.00% 0.27 100.00% 1 0.27 0.068 0.068 0.068 0.068 0.01% 0.04%
Electrical Works
KGN.EE.GF1500 Installation of Conduits (PVC/RGS/HDPE/EMT) LS 1 0.71 71.00% 0.29 100.00% 1 0.29 0.07 0.07 0.07 0.07 0.01% 0.03%
KGN.EE.GF1510 Installation of Cable Trays & Cable Ladders LS 1 1 70.00% 0.7 0.7 0.175 0.175 0.175 0.175 0.02% 0.03%
HVAC System
KGN.ME.GF2500 Galvanized Steel Ducts, including Damps LS 1 0.2 20.00% 0.8 50.00% 0.5 0.3 0.075 0.075 0.075 0.075 0.01% 0.04%
KGN.ME.GF2520 Insulation for Ducts LS 1 1 30.00% 0.3 0.3 0.075 0.075 0.075 0.075 0.01% 0.03%
Architecture Works
Roof Floor
Roofing System
KGN.AR.RF1000 EPDM Waterproofing Membrane M2 1421.54 1421.54 30.00% 426.462 426.462 107 107 107 107 0.01% 0.03%
KGN.AR.RF1010 Extruded Polystyrene 100 mm thick M2 1421.54 1421.54 30.00% 426.462 426.462 107 107 107 107 0.00% 0.01%
KGN.AR.RF1020 UV Resistant Geotextile Layer M2 1421.54 1421.54 30.00% 426.462 426.462 107 107 107 107 0.00% 0.01%
KGN.AR.RF1030 100 mm thick Gravel M2 1421.54 1421.54 30.00% 426.462 426.462 107 107 107 107 0.00% 0.01%
Wall Finishes
KGN.AR.GF1020 Plaster to External Walls M2 900 900 30.00% 270 270 67.5 67.5 67.5 67.5 0.05% 0.17%
KGN.AR.GF1000 Plaster to Internal Walls and Columns M2 2747 2747 15.00% 412.05 412.05 103.0125 103.0125 103.0125 103.0125 0.03% 0.19%

ELEMENTARY SCHOOL - GIRLS


Civil Works
Under Ground
Grade Slab
ESG.CE.GF2500 Hollow Concrete Block Works M2 1950 1765 90.51% 185 100.00% 1950 185 46.25 46.25 46.25 46.25 0.03% 0.28%
ESG.CE.GF2510 Hollow Concrete Pre-insulated Blocks with Foam M2 435 72 16.55% 363 70.00% 304.5 232.5 58.1 58.1 58.1 58.1 0.13% 0.24%
ESG.CE.GF2520 Miscellaneous Concrete Works (Lintels, Jambs, Sills, etc.) M3 60 0 0.00% 60 70.00% 42 42 10.5 10.5 10.5 10.5 0.03% 0.04%
First Floor
ESG.CE.FF3000 Hollow Concrete Block Works M2 1950 1950 10.00% 195 195 49 49 49 49 0.03% 0.28%
ESG.CE.FF3010 Hollow Concrete Pre-insulated Blocks with Foam M2 435 435 15.00% 65.25 65.25 16 16 16 16 0.04% 0.24%
ESG.CE.FF3020 Miscellaneous Concrete Works (Lintels, Jambs, Sills, etc.) M3 60 60 10.00% 6 6 1.5 1.5 1.5 1.5 0.00% 0.04%
Roof Floor
ESG.CE.RF1010 Formwork for Beams M2 1914 1894.01 98.96% 19.99 100.00% 1914 19.99 4.9975 4.9975 4.9975 4.9975 0.00% 0.17%
ESG.CE.RF1020 Steel Reinforcement of Beams Ton 48 43.84 91.33% 4.16 100.00% 48 4.16 1.04 1.04 1.04 1.04 0.02% 0.18%
ESG.CE.RF1030 Casting Concrete for Beams M3 216 197 91.20% 19 100.00% 216 19 4.75 4.75 4.75 4.75 0.00% 0.03%
ESG.CE.RF1510 Formwork of Solid Slabs and Beams M2 1500 1471 98.07% 29 100.00% 1500 29 7.25 7.25 7.25 7.25 0.00% 0.12%
ESG.CE.RF1520 Steel Reinforcement of Solid Slabs and Beams Ton 60 58.56 97.60% 1.44 100.00% 60 1.44 0.36 0.36 0.36 0.36 0.01% 0.24%
ESG.CE.RF1530 Casting Concrete for Solid Slabs and Beams M3 350 260 74.29% 90 100.00% 350 90 22.5 22.5 22.5 22.5 0.01% 0.03%
ESG.CE.RF2500 Concrete Work for Parapet LM 630 630 100.00% 630 630 157.5 157.5 157.5 157.5 0.02% 0.02%
ESG.CE.RF2510 100mm thick Concrete Cap on Top of Parapet LM 630 630 20.00% 126 126 31.5 31.5 31.5 31.5 0.00% 0.01%
ESG.CE.RF2000 Installation and Fixing of Precast Hollow Core Slabs M2 1139.5 1139.5 30.00% 341.85 341.85 85 85 85 85 0.05% 0.15%
ESG.CE.RF2010 Steel Reinforcement of Hollow Core Slabs M2 1139.5 1139.5 20.00% 227.9 227.9 57 57 57 57 0.02% 0.10%
ESG.CE.RF2020 60mm thick Concrete Toping to Hollow Core Slabs M2 1139.5 1139.5 20.00% 227.9 227.9 57 57 57 57 0.02% 0.08%
MEP Works
Ground Floor
ESG.EE.GF1000 Installation of Conduits (PVC/RGS/HDPE/EMT) LS 1 0.86 86.00% 0.14 100.00% 1 0.14 0.03 0.03 0.03 0.03 0.01% 0.09%
ESG.ME.GF1010 Drainage System LS 1 0.892 89.20% 0.108 95.00% 0.95 0.058 0.01 0.01 0.01 0.01 0.00% 0.06%
ESG.ME.UD1000 Plumbing Pipes under Ground LS 1 0.942 94.20% 0.058 100.00% 1 0.058 0.01 0.01 0.01 0.01 0.00% 0.03%
ESG.ME.GF1500 CPVC Pipes for Fire Network, including Valves LS 1 0 0.00% 1 30.00% 0.3 0.3 0.08 0.08 0.08 0.08 0.02% 0.08%
ESG.EE.GF1010 Installation of Cable Trays & Cable Ladders LS 1 1 100.00% 1 1 0.25 0.25 0.25 0.25 0.05% 0.05%
First Floor
Electrical Works
ESG.EE.FF1000 Installation of Conduits (PVC/RGS/HDPE/EMT) LS 1 1 20.00% 0.2 0.2 0.05 0.05 0.05 0.05 0.02% 0.09%
Architecture Works
Ground Floor
ESG.AR.FF1000 Plaster to Internal Walls and Columns M2 4204 4204 20.00% 840.8 840.8 210.2 210.2 210.2 210.2 0.07% 0.35%

INTERMEDIATE SCHOOL - GIRLS


Civil Works
Under Ground
ISG.CE.UD2000 Polyethylene Sheet Vapor Barrier Under Grade Slabs LS 1 0.99 99.00% 0.01 100.00% 1 0.01 0.0025 0.0025 0.0025 0.0025 0.00% 0.07%
ISG.CE.UD2005 Steel Mesh of Grade Slabs Ton 66 64.94 98.39% 1.06 100.00% 66 1.06 0.265 0.265 0.265 0.265 0.00% 0.09%
ISG.CE.UD2010 Casting Concrete for Grade Slabs M3 738 726 98.37% 12 100.00% 738 12 3 3 3 3 0.00% 0.09%
Ground Floor
ISG.CE.GF2500 Hollow Concrete Block Works M2 4275 417 9.75% 3858 70.00% 2992.5 2575.5 643.875 643.875 643.875 643.875 0.11% 0.19%
ISG.CE.GF2510 Hollow Concrete Pre-insulated Blocks with Foam M2 848 26 3.07% 822 50.00% 424 398 99.5 99.5 99.5 99.5 0.12% 0.26%
ISG.CE.GF2520 Miscellaneous Concrete Works (Lintels, Jambs, Sills, etc.) M3 79 0 0.00% 79 50.00% 39.5 39.5 9.9 9.9 9.9 9.9 0.02% 0.04%
First Floor
ISG.CE.FF2010 Steel Reinforcement of Hollow Core Slabs M2 1625 1460 89.85% 165 100.00% 1625 165 41 41 41 41 0.01% 0.12%
ISG.CE.FF2020 60mm thick Concrete Toping to Hollow Core Slabs M2 1625 580 35.69% 1045 100.00% 1625 1045 261 261 261 261 0.06% 0.10%
Roof Floor
ISG.CE.RF1000 Scaffolding for Beams LS 1 0.51 51.00% 0.49 100.00% 1 0.49 0.1 0.1 0.1 0.1 0.09% 0.18%
ISG.CE.RF1010 Formwork for Beams M2 1558 578 37.10% 980 100.00% 1558 980 245.0 245.0 245.0 245.0 0.12% 0.19%
ISG.CE.RF1020 Steel Reinforcement of Beams Ton 55 14.75 26.82% 40.25 100.00% 55 40.25 10.1 10.1 10.1 10.1 0.15% 0.20%
ISG.CE.RF1030 Casting Concrete for Beams M3 276 0 0.00% 276 100.00% 276 276 69.0 69.0 69.0 69.0 0.04% 0.04%
ISG.CE.RF1500 Scaffolding for Solid Slabs and Beams LS 1 0.44 44.00% 0.56 100.00% 1 0.56 0.1 0.1 0.1 0.1 0.06% 0.11%
ISG.CE.RF1510 Formwork of Solid Slabs and Beams M2 2500 760 30.40% 1740 100.00% 2500 1740 435.0 435.0 435.0 435.0 0.11% 0.16%
ISG.CE.RF1520 Steel Reinforcement of Solid Slabs and Beams Ton 31 9.07 29.26% 21.93 100.00% 31 21.93 5.5 5.5 5.5 5.5 0.25% 0.35%
ISG.CE.RF1530 Casting Concrete for Solid Slabs and Beams M3 419 64 15.27% 355 100.00% 419 355 88.8 88.8 88.8 88.8 0.04% 0.04%
MEP Works
Under Ground
ISG.ME.UD1000 Plumbing Pipes under Ground LS 1 0.98 98.00% 0.02 100.00% 1 0.02 0.005 0.005 0.005 0.005 0.00% 0.05%
ISG.EE.UD1000 Duct Bank of Electrical System LS 1 0.99 99.00% 0.01 100.00% 1 0.01 0.00 0.00 0.00 0.00 0.00% 0.04%
ISG.ME.GF1010 Drainage System LS 1 0.89 89.00% 0.11 95.00% 0.95 0.06 0.01 0.01 0.01 0.01 0.01% 0.11%
ISG.ME.GF1500 CPVC Pipes for Fire Network, including Valves LS 1 0 0.00% 1 30.00% 0.3 0.3 0.08 0.08 0.08 0.08 0.02% 0.08%
Ground Floor
ISG.EE.GF1000 Installation of Conduits (PVC/RGS/HDPE/EMT) LS 1 0.77 77.00% 0.23 85.00% 0.85 0.08 0.02 0.02 0.02 0.02 0.01% 0.15%
First Floor
Electrical Works
ISG.EE.FF1000 Installation of Conduits (PVC/RGS/HDPE/EMT) LS 1 1 10.00% 0.1 0.1 0.03 0.03 0.03 0.03 0.00% 0.03%
5
GRAND MOSQUE
Civil Works
Under Ground
Grade Slab
GMQ.CE.UD2000 Backfilling for Slab on Grade M3 924 923.5 99.95% 0.5 100.00% 924 0.5 0.125 0.125 0.125 0.125 0.00% 0.05%
GMQ.CE.UD2005 Polyethylene Sheet Vapor Barrier Under Grade Slabs LS 1 0.98 98.00% 0.02 100.00% 1 0.02 0.005 0.005 0.005 0.005 0.00% 0.06%
GMQ.CE.UD2010 Reinforcement Steel for Slab on Grade Ton 22 21.19 96.32% 0.81 100.00% 22 0.81 0.20 0.20 0.20 0.20 0.00% 0.08%
GMQ.CE.UD2020 Casting Concrete for Grade Slabs M3 391 353.2 90.33% 37.8 100.00% 391 37.8 9.45 9.45 9.45 9.45 0.01% 0.06%
Ground Floor
GMQ.CE.GF2540 Formwork & Reinforcement Work for 3nd phase of Minaret LS 1 0.95 95.00% 0.05 100.00% 1 0.05 0.0125 0.0125 0.0125 0.0125 0.00% 0.04%
GMQ.CE.GF2550 Casting Concrete & Curing M3 20 0 0.00% 20 100.00% 20 20 5 5 5 5 0.02% 0.02%
GMQ.CE.GF2560 Formwork & Reinforcement Work for 4th phase of Minaret LS 1 1 100.00% 1 1 0.25 0.25 0.25 0.25 0.04% 0.04%
GMQ.CE.GF2570 Casting Concrete & Curing M3 20 20 100.00% 20 20 5 5 5 5 0.02% 0.02%
GMQ.CE.GF2580 Formwork & Reinforcement Work for 5th phase of Minaret LS 1 1 100.00% 1 1 0.25 0.25 0.25 0.25 0.04% 0.04%
GMQ.CE.GF2590 Casting Concrete & Curing M3 20 20 100.00% 20 20 5 5 5 5 0.02% 0.02%
GMQ.CE.GF2000 Hollow Concrete Block Works M2 1947 872 44.79% 1075 80.00% 1557.6 685.6 171.4 171.4 171.4 171.4 0.03% 0.09%
GMQ.CE.GF2010 Hollow Concrete Pre-insulated Blocks with Foam M2 901 901 70.00% 630.7 630.7 157.675 157.675 157.675 157.675 0.07% 0.10%
GMQ.CE.GF2020 Reinforced Concrete lintels M3 10 10 60.00% 6 6 1.5 1.5 1.5 1.5 0.01% 0.01%
First Floor
GMQ.CE.FF2000 Hollow Concrete Block Works M2 1947 685 35.18% 1262 60.00% 1168.2 483.2 120.8 120.8 120.8 120.8 0.02% 0.09%
GMQ.CE.FF2010 Hollow Concrete Pre-insulated Blocks with Foam M2 901 901 60.00% 540.6 540.6 135.2 135.2 135.2 135.2 0.06% 0.10%
GMQ.CE.FF2020 Reinforced Concrete Lintels M3 10 10 15.00% 1.5 1.5 0.375 0.375 0.375 0.375 0.00% 0.01%
Roof Floor
GMQ.CE.RF2500 Screed to Slope to Roof M2 1072 1072 50.00% 536 536 134 134 134 134 0.00% 0.01%
Pump Room and Water Tank
GMQ.CE.TP1060 Formwork for Wall-Tank & Pump Room M2 400 332 83.00% 68 100.00% 400 68 17 17 17 17 0.01% 0.04%
GMQ.CE.TP1070 Casting Concrete & Curing For Walls -Tank & Pump Room M3 60 0 0.00% 60 100.00% 60 60 15 15 15 15 0.04% 0.04%
MEP Works
Under Ground
Plumbing Works
GMQ.ME.UD1000 Under Ground Piping System & Manholes LS 1 0.87 87.00% 0.13 100.00% 1 0.13 0.03 0.03 0.03 0.03 0.01% 0.05%
Electrical Works
GMQ.EE.UD1000 Construction of Duct Bank LS 1 0.86 86.00% 0.14 100.00% 1 0.14 0.04 0.04 0.04 0.04 0.01% 0.05%
GMQ.EE.UD1010 Concrete Ductbank,Floor Pit LS 1 0.8 80.00% 0.2 100.00% 1 0.2 0.05 0.05 0.05 0.05 0.01% 0.03%
Ground Floor
Electrical Works
GMQ.EE.GF1000 Installation of Cable Trays & Cable Ladders LS 1 1 40.00% 0.4 0.4 0.1 0.1 0.1 0.1 0.02% 0.04%
GMQ.EE.GF1010 Conduit installation (PVC/RGS/HDPE/EMT) LS 1 0.45 45.00% 0.55 80.00% 0.8 0.35 0.09 0.09 0.09 0.09 0.01% 0.03%
First Floor
Electrical Works
GMQ.EE.FF1000 Installation of Cable Trays & Cable Ladders LS 1 1 30.00% 0.3 0.3 0.08 0.08 0.08 0.08 0.00% 0.01%
GMQ.EE.FF1010 Conduit installation (PVC/RGS/HDPE/EMT) LS 1 0.44 44.00% 0.56 60.00% 0.6 0.16 0.04 0.04 0.04 0.04 0.00% 0.01%
ELEMENTARY SCHOOL - BOYS
Civil Works
Under Ground
Grade Slab
ESB.CE.UD2000 Polyethylene Sheet Vapor Barrier Under Grade Slabs LS 1 0.23 23.00% 0.77 96.00% 0.96 0.73 0.18 0.18 0.18 0.18 0.05% 0.06%
ESB.CE.UD2005 Steel Mesh of Grade Slabs Ton 45 8.85 19.67% 36.15 96.00% 43.2 34.35 8.6 8.6 8.6 8.6 0.04% 0.06%
ESB.CE.UD2010 Casting Concrete for Grade Slabs M3 885.8 67 7.56% 818.8 96.00% 850 783 196 196 196 196 0.05% 0.06%
Ground Floor
ESB.CE.GF1500 Formwork of Stairs M2 30 12.3 41.00% 17.7 100.00% 30 17.7 4.425 4.425 4.425 4.425 0.05% 0.09%
ESB.CE.GF1510 Steel Reinforcement Work for Stairs Ton 3 0.86 28.67% 2.14 100.00% 3 2.14 0.535 0.535 0.535 0.535 0.06% 0.08%
ESB.CE.GF1520 Casting Concrete for Stairs M3 18 0 0.00% 18 100.00% 18 18 4.5 4.5 4.5 4.5 0.03% 0.03%
ESB.CE.GF2500 Hollow Concrete Block Works M2 1950 1950 80.00% 1560 1560 390 390 390 390 0.03% 0.03%
ESB.CE.GF2510 Hollow Concrete Pre-insulated Blocks with Foam M2 435 435 60.00% 261 261 65.25 65.25 65.25 65.25 0.14% 0.24%
ESB.CE.GF2520 Miscellaneous Concrete Works (Lintels, Jambs, Sills, etc.) M3 60 60 40.00% 24 24 6 6 6 6 0.02% 0.04%
First Floor
ESB.CE.FF2010 Steel Reinforcement of Hollow Core Slabs M2 1139.5 907 79.60% 232.5 100.00% 1139.5 232.5 58 58 58 58 0.02% 0.10%
ESB.CE.FF2020 60mm thick Concrete Toping to Hollow Core Slabs M2 1139.5 700 61.43% 439.5 100.00% 1139.5 439.5 110 110 110 110 0.03% 0.08%
Roof Floor
ESB.CE.RF1000 Scaffolding for Beams LS 1 0.5 50.00% 0.5 100.00% 1 0.5 0.1 0.1 0.1 0.1 0.08% 0.16%
ESB.CE.RF1010 Formwork for Beams M2 1914 426 22.26% 1488 100.00% 1914 1488 372.0 372.0 372.0 372.0 0.13% 0.17%
ESB.CE.RF1020 Steel Reinforcement of Beams Ton 45 7.1 15.78% 37.9 100.00% 45 37.9 9.5 9.5 9.5 9.5 0.15% 0.18%
ESB.CE.RF1030 Casting Concrete for Beams M3 216 8 3.70% 208 100.00% 216 208 52 52 52 52 0.03% 0.03%
ESB.CE.RF1500 Scaffolding for Solid Slabs and Beams LS 1 0.59 59.00% 0.41 100.00% 1 0.41 0.1 0.1 0.1 0.1 0.04% 0.10%
ESB.CE.RF1510 Formwork of Solid Slabs and Beams M2 1500 876 58.40% 624 100.00% 1500 624 156.0 156.0 156.0 156.0 0.05% 0.12%
ESB.CE.RF1520 Steel Reinforcement of Solid Slabs and Beams Ton 60 17.7 29.50% 42.3 100.00% 60 42.3 10.6 10.6 10.6 10.6 0.18% 0.26%
ESB.CE.RF1530 Casting Concrete for Solid Slabs and Beams M3 350 0 0.00% 350 100.00% 350 350 87.5 87.5 87.5 87.5 0.03% 0.03%
ESB.CE.RF2500 Concrete Work for Parapet LM 630 630 50.00% 315 315 78.8 78.8 78.8 78.8 0.01% 0.02%
MEP Works
Ground Floor
ESB.EE.GF1000 Installation of Conduits (PVC/RGS/HDPE/EMT) LS 1 0.65 65.00% 0.35 80.00% 0.8 0.15 0.04 0.04 0.04 0.04 0.01% 0.09%
ESB.ME.UD1000 Plumbing Pipes under Ground LS 1 0.6 60.00% 0.4 100.00% 1 0.4 0.1 0.1 0.1 0.1 0.02% 0.06%
ESB.ME.GF1010 Drainage System LS 1 0.66 66.00% 0.34 80.00% 0.8 0.14 0.035 0.035 0.035 0.035 0.01% 0.05%
ESB.EE.UD1000 Duct Bank of Electrical System LS 1 1 50.00% 0.5 0.5 0.125 0.125 0.125 0.125 0.03% 0.05%
ESB.EE.UD1010 Concrete Floor Pit for LV/LC Networks LS 1 1 50.00% 0.5 0.5 0.125 0.125 0.125 0.125 0.01% 0.02%
ESB.ME.GF1500 CPVC Pipes for Fire Network, including Valves LS 1 0 0.00% 1 30.00% 0.3 0.3 0.08 0.08 0.08 0.08 0.02% 0.08%
First Floor
Electrical Works
ESB.EE.FF1000 Installation of Conduits (PVC/RGS/HDPE/EMT) LS 1 1 15.00% 0.15 0.15 0.04 0.04 0.04 0.04 0.01% 0.04%

INTERMEDIATE SCHOOL - BOYS


Civil Works
Under Ground
Grade Slab
ISB.CE.UD2000 Polyethylene Sheet Vapor Barrier Under Grade Slabs LS 1 0.1342 13.42% 0.8658 100.00% 1 0.8658 0.22 0.22 0.22 0.22 0.06% 0.07%
ISB.CE.UD2005 Steel Mesh of Grade Slabs Ton 66 5.9 8.94% 60.1 100.00% 66 60.1 15 15 15 15 0.08% 0.09%
ISB.CE.UD2010 Casting Concrete for Grade Slabs M3 1320 71 5.38% 1249 100.00% 1320 1249 312 312 312 312 0.09% 0.09%
Ground Floor
ISB.CE.GF2500 Hollow Concrete Block Works M2 2138 574 26.85% 1564 80.00% 1710.4 1136.4 284 284 284 284 0.10% 0.19%
ISB.CE.GF2510 Hollow Concrete Pre-insulated Blocks with Foam M2 424 424 80.00% 339.2 339.2 85 85 85 85 0.13% 0.16%
ISB.CE.GF2520 Miscellaneous Concrete Works (Lintels, Jambs, Sills, etc.) M3 40 40 60.00% 24 24 6 6 6 6 0.02% 0.04%
First Floor
ISB.CE.FF2010 Steel Reinforcement of Hollow Core Slabs M2 1625 1464 90.09% 161 100.00% 1625 161 40 40 40 40 0.01% 0.12%
ISB.CE.FF2020 60mm thick Concrete Toping to Hollow Core Slabs M2 1625 960 59.08% 665 100.00% 1625 665 166 166 166 166 0.04% 0.10%
Roof Floor
ISB.CE.RF1000 Scaffolding for Beams LS 1 0.53 53.00% 0.47 100.00% 1 0.47 0.1 0.1 0.1 0.1 0.09% 0.18%
ISB.CE.RF1010 Formwork for Beams M2 1558 376 24.13% 1182 100.00% 1558 1182 296 296 296 296 0.14% 0.19%
ISB.CE.RF1020 Steel Reinforcement of Beams Ton 55 3.48 6.33% 51.52 100.00% 55 51.52 13 13 13 13 0.19% 0.20%
ISB.CE.RF1030 Casting Concrete for Beams M3 276 0 0.00% 276 100.00% 276 276 69 69 69 69 0.04% 0.04%
ISB.CE.RF1500 Scaffolding for Solid Slabs and Beams LS 1 0.4 40.00% 0.6 100.00% 1 0.6 0.15 0.15 0.15 0.15 0.07% 0.11%
ISB.CE.RF1510 Formwork of Solid Slabs and Beams M2 2500 483 19.32% 2017 100.00% 2500 2017 504 504 504 504 0.13% 0.16%
ISB.CE.RF1520 Steel Reinforcement of Solid Slabs and Beams Ton 31 8.01 25.84% 22.99 100.00% 31 22.99 6 6 6 6 0.15% 0.21%
ISB.CE.RF1530 Casting Concrete for Solid Slabs and Beams M3 419 0 0.00% 419 100.00% 419 419 105 105 105 105 0.04% 0.04%
MEP Works
Ground Floor
ISB.EE.GF1000 Installation of Conduits (PVC/RGS/HDPE/EMT) LS 1 0.62 62.00% 0.38 80.00% 0.8 0.18 0.05 0.05 0.05 0.05 0.03% 0.15%
5
ISB.ME.UD1000 Plumbing Pipes under Ground LS 1 0.79 79.00% 0.21 100.00% 1 0.21 0.0525 0.0525 0.0525 0.0525 0.01% 0.06%
ISB.ME.GF1010 Drainage System LS 1 0.79 79.00% 0.21 80.00% 0.8 0.01 0.00 0.00 0.00 0.00 0.00% 0.11%
ISB.ME.GF1500 CPVC Pipes for Fire Network, including Valves LS 1 0 0.00% 1 80.00% 0.8 0.8 0.2 0.2 0.2 0.2 0.07% 0.08%
First Floor
Electrical Works
ISB.EE.FF1000 Installation of Conduits (PVC/RGS/HDPE/EMT) LS 1 1 10.00% 0.1 0.1 0.03 0.03 0.03 0.03 0.00% 0.03%

OUT PATIENT CLINIC


Civil Works
Under Ground
Grade Slab
OPC.CE.UD2005 Polyethylene Sheet Vapor Barrier Under Grade Slabs LS 1 0.89 89.00% 0.11 100.00% 1 0.11 0.0275 0.0275 0.0275 0.0275 0.00% 0.01%
OPC.CE.UD2010 Reinforcement Work Ton 5.5 4.65 84.55% 0.85 100.00% 5.5 0.85 0.21 0.21 0.21 0.21 0.01% 0.05%
OPC.CE.UD2020 Casting Concrete & Water Curing M3 96 77 80.21% 19 100.00% 96 19 4.75 4.75 4.75 4.75 0.01% 0.03%
Ground Floor
OPC.CE.GF1500 Hollow Concrete Block Works M2 638 638 80.00% 510.4 510.4 128 128 128 128 0.08% 0.10%
OPC.CE.GF1510 Hollow Concrete Pre-insulated Blocks with Foam M2 253 253 80.00% 202.4 202.4 51 51 51 51 0.07% 0.09%
OPC.CE.GF1520 Reinforced Concrete lintels M3 10 10 70.00% 7 7 1.75 1.75 1.75 1.75 0.01% 0.01%
First Floor
OPC.CE.FF2000 Hollow Concrete Block Works M2 638 638 10.00% 63.8 63.8 16 16 16 16 0.00% 0.05%
OPC.CE.FF2010 Hollow Concrete Pre-insulated Blocks with Foam M2 253 253 10.00% 25.3 25.3 6 6 6 6 0.00% 0.05%
OPC.CE.FF2020 Reinforced Concrete Lintels M3 10 10 10.00% 1 1 0.25 0.25 0.25 0.25 0.00% 0.00%
Roof Floor
OPC.CE.RF2000 50 mm thick Screed to Slope to Roof M2 597 597 50.00% 298.5 298.5 75 75 75 75 0.01% 0.01%

Architecture Works
Roof Floor
Roof System
OPC.AR.FF2500 Water Proofing System M2 578 578 30.00% 173.4 173.4 43 43 43 43 0.02% 0.06%
MEP Works
Under Ground
OPC.ME.GF1500 Piping Work with Valves & Fittings LS 1 0 0.00% 1 20.00% 0.2 0.2 0.05 0.05 0.05 0.05 0.01% 0.03%
Ground Floor
OPC.EE.GF1020 Conduit installation (PVC/RGS/HDPE/EMT) LS 1 0.65 65.00% 0.35 70.00% 0.7 0.05 0.01 0.01 0.01 0.01 0.00% 0.02%
OPC.ME.GF1020 Drainage System LS 1 0.89 89.00% 0.11 95.00% 0.95 0.06 0.02 0.02 0.02 0.02 0.00% 0.04%
First Floor
Electrical Works
OPC.EE.FF1010 Conduit installation (PVC/RGS/HDPE/EMT) LS 1 1 25.00% 0.25 0.25 0.06 0.06 0.06 0.06 0.01% 0.02%

FEMALE NURSES HOUSING


Civil Works
Under Ground
Grade Slab
FNH.CE.UD2005 Polyethylene Sheet Vapor Barrier Under Grade Slabs LS 1 0.97 97.00% 0.03 100.00% 1 0.03 0.0 0.0 0.0 0.0 0.00% 0.01%
FNH.CE.UD2010 Reinforcement Work Ton 6.5 6.01 92.46% 0.49 100.00% 6.5 0.49 0.1 0.1 0.1 0.1 0.00% 0.05%
FNH.CE.UD2020 Casting Concrete & Curing M3 122 98 80.33% 24 100.00% 122 24 6.0 6.0 6.0 6.0 0.01% 0.03%
Ground Floor
FNH.CE.GF1500 Hollow Concrete Block Works M2 816 816 80.00% 652.8 652.8 163.2 163.2 163.2 163.2 0.11% 0.13%
FNH.CE.GF1510 Hollow Concrete Pre-insulated Blocks with Foam M2 323 323 80.00% 258.4 258.4 64.6 64.6 64.6 64.6 0.17% 0.21%
FNH.CE.GF1520 Reinforced Concrete lintels M3 15 15 70.00% 10.5 10.5 2.6 2.6 2.6 2.6 0.01% 0.01%
Roof Floor
FNH.CE.RF1500 Concrete Work for Parapet LM 150 150 100.00% 150 150 38 38 38 38 0.03% 0.03%
FNH.CE.RF1510 100mm thick Concrete Cap on Top of Parapet LM 150 150 50.00% 75 75 19 19 19 19 0.01% 0.02%
FNH.CE.RF2000 50 mm thick screed to slope to roof M2 760 760 50.00% 380 380 95 95 95 95 0.01% 0.01%
Architecture Works
Roof Floor
Roofing System
FNH.AR.GF2500 Water Proofing System M2 737 737 50.00% 368.5 368.5 92 92 92 92 0.03% 0.05%
MEP Works
Under Ground
Plumbing Works
FNH.ME.GF1500 Piping Work with Valves & fittings LS 1 0 0.00% 1 20.00% 0.2 0.2 0.05 0.05 0.05 0.05 0.01% 0.03%
Electrical Works
FNH.EE.UD1000 Installation of Grounding System LS 1 1 50.00% 0.5 0.5 0.125 0.125 0.125 0.125 0.01% 0.03%
FNH.EE.UD1010 Concrete Ductbank -(HDPE & PVC Conduit) LS 1 1 50.00% 0.5 0.5 0.125 0.125 0.125 0.125 0.02% 0.05%
Ground Floor
Plumbing Works
FNH.ME.GF1000 Installation of Water Supply System LS 1 1 100.00% 1 1 0.25 0.25 0.25 0.25 0.03% 0.03%
FNH.ME.GF1010 Drainage System LS 1 0.9 90.00% 0.1 100.00% 1 0.1 0.02 0.02 0.02 0.02 0.00% 0.04%
Electrical Works
FNH.EE.GF1000 Installation of Cable Trays & Cable Ladders LS 1 1 50.00% 0.5 0.5 0.125 0.125 0.125 0.125 0.01% 0.03%
FNH.EE.GF1010 Conduit installation (PVC/RGS/HDPE/EMT) LS 1 0.43 43.00% 0.57 100.00% 1 0.57 0.14 0.14 0.14 0.14 0.01% 0.02%
Roof Floor
Plumbing Works
FNH.ME.RF1000 Hot & Cold Water System LS 1 1 50.00% 0.5 0.5 0.125 0.125 0.125 0.125 0.01% 0.01%
FNH.ME.RF1010 Piping Insulations for Hot water LS 1 1 50.00% 0.5 0.5 0.125 0.125 0.125 0.125 0.00% 0.01%
FNH.ME.RF1020 Roof Drainage System LS 1 1 50.00% 0.5 0.5 0.125 0.125 0.125 0.125 0.00% 0.01%
POLICE STATION
Civil Works
Under Ground
MPS.CE.UD2000 Backfilling & Compaction M3 145 144 99.31% 1 100.00% 145 1 0.25 0.25 0.25 0.25 0.00% 0.04%
MPS.CE.UD2005 Polyethylene Sheet Vapor Barrier Under Grade Slabs LS 1 0.97 97.00% 0.03 100.00% 1 0.03 0.0075 0.0075 0.0075 0.0075 0.00% 0.02%
MPS.CE.UD2010 Reinforcement Work Ton 4 3.87 96.75% 0.13 100.00% 4 0.13 0.0325 0.0325 0.0325 0.0325 0.00% 0.05%
MPS.CE.UD2020 Casting Concrete & Water Curing M3 80 70 87.50% 10 100.00% 80 10 2.5 2.5 2.5 2.5 0.00% 0.03%
Ground Floor
MPS.CE.GF1500 Hollow Concrete Block Works M2 442 442 100.00% 442 442 111 111 111 111 0.07% 0.07%
MPS.CE.GF1510 Hollow Concrete Pre-insulated Blocks with Foam M2 135 135 100.00% 135 135 34 34 34 34 0.05% 0.05%
MPS.CE.GF1520 Reinforced Concrete lintels M3 8 8 100.00% 8 8 2 2 2 2 0.01% 0.01%
MPS.CE.FF2000 Hollow Concrete Block Works M2 442 335 75.79% 107 100.00% 442 107 27 27 27 27 0.02% 0.07%
MPS.CE.FF2010 Hollow concrete Pre-insulated blocks with foam M2 135 135 100.00% 135 135 33.8 33.8 33.8 33.8 0.05% 0.05%
MPS.CE.FF2020 Reinforced concrete lintels M3 8 8 100.00% 8 8 2 2 2 2 0.01% 0.01%
Roof Floor
MPS.CE.RF1500 Concrete Work for Parapet LM 92 92 100.00% 92 92 23 23 23 23 0.01% 0.01%
Architecture Works
Roof Floor
Roofing System
MPS.AR.RF1000 Water Proofing System M2 454 454 50.00% 227 227 56.75 56.75 56.75 56.75 0.03% 0.06%
MEP Works
Under Ground
Plumbing Works
MPS.ME.GF1010 Drainage System LS 1 0.9 90.00% 0.1 100.00% 1 0.1 0.0 0.0 0.0 0.0 0.00% 0.04%
MPS.ME.GF1500 Piping Work with Valves & fittings LS 1 0.04 4.00% 0.96 20.00% 0.2 0.16 0.04 0.04 0.04 0.04 0.00% 0.03%
Electrical Works
MPS.EE.UD1000 Installation of Grounding System LS 1 1 50.00% 0.5 0.5 0.125 0.125 0.125 0.125 0.01% 0.02%
Ground Floor
Electrical Works
MPS.EE.GF1010 Conduit installation (PVC/RGS/HDPE/EMT) LS 1 1 60.00% 0.6 0.6 0.15 0.15 0.15 0.15 0.01% 0.02%
MPS.EE.GF1000 Installation of Cable Trays & Cable Ladders LS 1 1 20.00% 0.2 0.2 0.05 0.05 0.05 0.05 0.01% 0.03%
First Floor
Electrical Works
MPS.EE.FF1010 Conduit installation (PVC/RGS/HDPE/EMT) LS 1 1 25.00% 0.25 0.25 0.06 0.06 0.06 0.06 0.01% 0.02%

5
RETAIL CENTER
Civil Works
Under Ground
RTL.CE.UD2000 Backfilling & Compaction M3 233 229.2 98.37% 3.8 100.00% 233 3.8 0.95 0.95 0.95 0.95 0.00% 0.05%
RTL.CE.UD2005 Polyethylene Sheet Vapor Barrier Under Grade Slabs LS 1 0.9 90.00% 0.1 100.00% 1 0.1 0.0 0.0 0.0 0.0 0.00% 0.02%
RTL.CE.UD2010 Reinforcement Work Ton 7 6.3 90.00% 0.7 100.00% 7 0.7 0.2 0.2 0.2 0.2 0.00% 0.05%
RTL.CE.UD2020 Casting Concrete M3 127 114 89.76% 13 100.00% 127 13 3.25 3.25 3.25 3.25 0.00% 0.03%
Ground Floor
RTL.CE.GF1500 Hollow Concrete Block Works M2 616 476 77.27% 140 100.00% 616 140 35 35 35 35 0.03% 0.14%
RTL.CE.GF1510 Hollow Concrete Pre-insulated Blocks with Foam M2 357 357 100.00% 357 357 89 89 89 89 0.20% 0.20%
RTL.CE.GF1520 Reinforced Concrete lintels M3 13 13 100.00% 13 13 3.25 3.25 3.25 3.25 0.01% 0.01%
Roof Floor
RTL.CE.RF2000 Concrete Work for Parapet LM 130 130 100.00% 130 130 33 33 33 33 0.10% 0.10%
RTL.CE.RF2010 100mm thick Concrete Cap on Top of Parapet LM 130 130 100.00% 130 130 33 33 33 33 0.02% 0.02%
RTL.CE.RF2500 50 mm thick screed to slope to roof M2 682 682 100.00% 682 682 171 171 171 171 0.01% 0.01%
Architecture Works
Roof Floor
Roofing System
RTL.AR.RF1000 Water Proofing System M2 729 729 100.00% 729 729 182 182 182 182 0.06% 0.06%
MEP Works
Under Ground
Plumbing Works
RTL.ME.GF1000 Drainage System LS 1 0.9 90.00% 0.1 95.00% 0.95 0.05 0.0125 0.0125 0.0125 0.0125 0.00% 0.05%
RTL.ME.GF1500 Piping Work with Valves & fittings LS 1 0 0.00% 1 30.00% 0.3 0.3 0.075 0.075 0.075 0.075 0.01% 0.03%
Electrical Works
RTL.EE.UD1000 Installation of Grounding System LS 1 1 100.00% 1 1 0.25 0.25 0.25 0.25 0.02% 0.02%
RTL.EE.UD1010 Reinforced Concrete Ductbank LS 1 1 100.00% 1 1 0.25 0.25 0.25 0.25 0.01% 0.01%
Ground Floor
Electrical Works
RTL.EE.GF1000 Installation of Cable Trays & Cable Ladders LS 1 1 100.00% 1 1 0.25 0.25 0.25 0.25 0.04% 0.04%
RTL.EE.GF1010 Conduit installation (PVC/RGS/HDPE/EMT) LS 1 0.35 35.00% 0.65 100.00% 1 0.65 0.16 0.16 0.16 0.16 0.01% 0.02%
MEAL RECREATION CENTER
Civil Works
Under Ground
MRC.CE.UD2000 Backfilling & Compaction M3 225 0.59 0.26% 224.41 100.00% 225 224.41 56 56 56 56 0.05% 0.05%
MRC.CE.UD2005 Polyethylene Sheet Vapor Barrier Under Grade Slabs LS 1 0 0.00% 1 100.00% 1 1 0.25 0.25 0.25 0.25 0.02% 0.02%
MRC.CE.UD2010 Reinforcement Work Ton 6 0 0.00% 6 100.00% 6 6 1.5 1.5 1.5 1.5 0.05% 0.05%
MRC.CE.UD2020 Casting Concrete & Water Curing M3 112 0 0.00% 112 100.00% 112 112 28 28 28 28 0.03% 0.03%
Ground Floor
MRC.CE.GF1500 Hollow Concrete Block Works M2 683 683 100.00% 683 683 171 171 171 171 0.23% 0.23%
MRC.CE.GF1510 Hollow Concrete Pre-insulated Blocks with Foam M2 462 462 100.00% 462 462 115.5 115.5 115.5 115.5 0.21% 0.21%
MRC.CE.GF1520 Reinforced Concrete lintels M3 10 10 100.00% 10 10 2.5 2.5 2.5 2.5 0.02% 0.02%
Roof Floor
MRC.CE.RF2000 Installation and Fixing of Precast Hollow Core Slabs M2 431 430 99.77% 1 100.00% 431 1 0 0 0 0 0.00% 0.08%
MRC.CE.RF2010 60mm thick Concrete Toping to Hollow Core Slabs M2 431 0 0.00% 431 100.00% 431 431 108 108 108 108 0.02% 0.02%
Swimming Pool
MRC.CE.GF2500 Excavation,Backfilling & Compaction of Foundation M3 730 708 96.99% 22 100.00% 730 22 5.5 5.5 5.5 5.5 0.00% 0.03%
MRC.CE.GF2510 Water Proofing under Tank and Pump Room LS 1 0.7 70.00% 0.3 100.00% 1 0.3 0.075 0.075 0.075 0.075 0.00% 0.01%
MRC.CE.GF2520 Lean Casting Concrete under - Tank & Pump Room M3 8 5.6 70.00% 2.4 100.00% 8 2.4 0.6 0.6 0.6 0.6 0.00% 0.01%
MRC.CE.GF2530 Reinforcement Work for Ground Slab & Wall -Tank & Pump Room Ton 46 25.4 55.22% 20.6 100.00% 46 20.6 5.15 5.15 5.15 5.15 0.01% 0.03%
MRC.CE.GF2540 Formwork for Ground Slab - Tank & Pump Room M2 94 32.61 34.69% 61.39 100.00% 94 61.39 15.3 15.3 15.3 15.3 0.02% 0.03%
MRC.CE.GF2560 Formwork for Wall-Tank & Pump Room M2 150 0 0.00% 150 100.00% 150 150 37.5 37.5 37.5 37.5 0.03% 0.03%
MRC.CE.GF2570 Casting Concrete & Curing For Walls -Tank & Pump Room M3 25 25 100.00% 25 25 6.25 6.25 6.25 6.25 0.06% 0.06%
MRC.CE.GF2620 Reinforcement Work for Slab on Grade & Walls - Swimming Pool Ton 34.5 34.5 60.00% 20.7 20.7 5.175 5.175 5.175 5.175 0.03% 0.06%
MRC.CE.GF2630 Casting Concrete For Slab on Grade - Swimming Pool M3 56.8 56.8 100.00% 56.8 56.8 14.2 14.2 14.2 14.2 0.01% 0.01%
MRC.CE.GF2640 Formwork For Walls - Swimming Pool M2 614 614 60.00% 368.4 368.4 92.1 92.1 92.1 92.1 0.03% 0.05%
MRC.CE.GF2650 Casting Concrete For Walls - Swimming Pool M3 78.1 78.1 60.00% 46.86 46.86 11.7 11.7 11.7 11.7 0.02% 0.04%
MEP Works
Under Floor
Plumbing Works
MRC.ME.UD1000 Under Ground Piping System & Manholes LS 1 0.6 60.00% 0.4 100.00% 1 0.4 0.10 0.10 0.10 0.10 0.01% 0.03%
Electrical Works
MRC.EE.UD1000 Installation of Grounding System LS 1 1 100.00% 1 1 0.25 0.25 0.25 0.25 0.02% 0.02%
MRC.EE.UD1010 Reinforced Concrete Ductbank LS 1 1 100.00% 1 1 0.25 0.25 0.25 0.25 0.01% 0.01%
Ground Floor
Plumbing Works
MRC.ME.GF1000 Drainage System LS 1 0.56 56.00% 0.44 100.00% 1 0.44 0.11 0.11 0.11 0.11 0.02% 0.04%
MRC.ME.GF1010 Installation of Water Supply System LS 1 1 100.00% 1 1 0.25 0.25 0.25 0.25 0.04% 0.04%
Electrical Works
MRC.EE.GF1000 Installation of Cable Trays & Cable Ladders LS 1 1 100.00% 1 1 0.25 0.25 0.25 0.25 0.02% 0.02%
MRC.EE.GF1020 Conduit installation (PVC/RGS/HDPE/EMT) LS 1 0.39 39.00% 0.61 100.00% 1 0.61 0.15 0.15 0.15 0.15 0.01% 0.02%

FEMEAL RECREATION CENTER


Civil Works
Under Ground
FRC.CE.UD2000 Backfilling & Compaction M3 225 1 0.44% 224 100.00% 225 224 56 56 56 56 0.03% 0.03%
FRC.CE.UD2005 Polyethylene Sheet Vapor Barrier Under Grade Slabs LS 1 0.78 78.00% 0.22 100.00% 1 0.22 0.055 0.055 0.055 0.055 0.00% 0.02%
FRC.CE.UD2010 Reinforcement Work Ton 6 4.19 69.83% 1.81 100.00% 6 1.81 0.4525 0.4525 0.4525 0.4525 0.01% 0.05%
FRC.CE.UD2020 Casting Concrete & Water Curing M3 112 71 63.39% 41 100.00% 112 41 10.25 10.25 10.25 10.25 0.01% 0.03%
Ground Floor
FRC.CE.GF1500 Hollow Concrete Block Works M2 683 683 100.00% 683 683 171 171 171 171 0.23% 0.23%
FRC.CE.GF1510 Hollow Concrete Pre-insulated Blocks with Foam M2 462 462 100.00% 462 462 116 116 116 116 0.21% 0.21%
FRC.CE.GF1520 Reinforced Concrete lintels M3 10 10 100.00% 10 10 2.5 2.5 2.5 2.5 0.02% 0.02%
Roof Floor
FRC.CE.RF2010 60mm thick Concrete Toping to Hollow Core Slabs M2 431 0 0.00% 431 100.00% 431 431 108 108 108 108 0.02% 0.02%
Swimming Pool
FRC.CE.GF2510 Water Proofing under Tank and Pump Room LS 1 0.75 75.00% 0.25 100.00% 1 0.25 0.06 0.06 0.06 0.06 0.00% 0.01%
FRC.CE.GF2520 Lean Casting Concrete under - Tank & Pump Room M3 8 5.6 70.00% 2.4 100.00% 8 2.4 0.6 0.6 0.6 0.6 0.00% 0.01%
FRC.CE.GF2530 Reinforcement Work for Ground Slab & Wall -Tank & Pump Room Ton 46 29.81 64.80% 16.19 100.00% 46 16.19 4.0 4.0 4.0 4.0 0.01% 0.03%
FRC.CE.GF2540 Formwork for Ground Slab - Tank & Pump Room M2 94 61.2 65.11% 32.8 100.00% 94 32.8 8.2 8.2 8.2 8.2 0.02% 0.04%
FRC.CE.GF2550 Casting Concrete & Curing For Grade Slab - Tank & Pump Room M3 59 30 50.85% 29 100.00% 59 29 7.25 7.25 7.25 7.25 0.01% 0.03%
FRC.CE.GF2560 Formwork for Wall-Tank & Pump Room M2 150 0 0.00% 150 100.00% 150 150 37.5 37.5 37.5 37.5 0.03% 0.03%
FRC.CE.GF2570 Casting Concrete & Curing For Walls -Tank & Pump Room M3 25 25 100.00% 25 25 6.25 6.25 6.25 6.25 0.03% 0.03%
FRC.CE.GF2620 Reinforcement Work for Slab on Grade & Walls - Swimming Pool Ton 34.5 34.5 70.00% 24.15 24.15 6.0375 6.0375 6.0375 6.0375 0.03% 0.04%
FRC.CE.GF2630 Casting Concrete For Slab on Grade - Swimming Pool M3 56.8 56.8 100.00% 56.8 56.8 14.2 14.2 14.2 14.2 0.05% 0.05%
FRC.CE.GF2640 Formwork For Walls - Swimming Pool M2 614 614 70.00% 429.8 429.8 107 107 107 107 0.01% 0.02%
FRC.CE.GF2650 Casting Concrete For Walls - Swimming Pool M3 78.1 78.1 70.00% 54.67 54.67 14 14 14 14 0.04% 0.05%
MEP Works
Under Floor
FRC.EE.UD1000 Installation of Grounding System LS 1 1 100.00% 1 1 0.25 0.25 0.25 0.25 0.02% 0.02%
FRC.EE.UD1010 Reinforced Concrete Ductbank LS 1 1 100.00% 1 1 0.25 0.25 0.25 0.25 0.01% 0.01%
Ground Floor
Plumbing Works
FRC.ME.GF1000 Drainage System LS 1 0.9 90.00% 0.1 100.00% 1 0.1 0.02 0.02 0.02 0.02 0.00% 0.04%
FRC.ME.GF1010 Installation of Water Supply System LS 1 1 100.00% 1 1 0.25 0.25 0.25 0.25 0.04% 0.04%
Electrical Works
FRC.EE.GF1000 Installation of Cable Trays & Cable Ladders LS 1 1 100.00% 1 1 0.25 0.25 0.25 0.25 0.02% 0.02%
FRC.EE.GF1020 Conduit installation (PVC/RGS/HDPE/EMT) LS 1 0.37 37.00% 0.63 100.00% 1 0.63 0.16 0.16 0.16 0.16 0.01% 0.02%
5
TOTAL 8.68%