PFM Checklist, Version:QA/2013/V2 © QA/RTS/RO/Robi Axiata Limited
PFM Checklist, Version:QA/2013/V2 © QA/RTS/RO/Robi Axiata Limited
General Information
Site Name :
Site Code :
Site Category :
Region :
Zone :
Indoor Outdoor
Tower Pole
Name :
Contact no :
PFM Date :
PMGR02
PMGR03
PMGR04
PMGR05
Snag Name
All the Grounding Cables are connected to Main Grounding Plate and the Main Grounding Cable is
properly connected with the grounding PIT
Resistance in ohm (3 ohm) in main grounding cable connected to MGB of equipment room is ok
Main grounding pit is damaged
Power cables are used as per edotco Standard capacity (rm).
edotco approved Brand Cables are used
Severity Status Qty Entry Remarks Clear Remarks
Critical OK
Major OK
Minor OK
Major OK
Minor OK
Remarks
Snag Code Snag Name
PMGE01 Generator, ATS and VTMS are working properly
PMGE02 Sufficient water is present in Generator's radiator and in Generator's battery
PMGE03 Cables inside the ATS of the generator is latched properly and no bare conductor is visible
PMGE04 Generator is Grounded properly
PMGE05 Level and quality of lube oil in DG is ok
PMGE06 Level of water in DG battery is ok
Severity Status Qty Entry Remarks Clear Remarks
Critical NA
Major NA
Major NA
Critical NA
Major NA
Major NA
Remarks