Draft Internal Audit Report of UCEKU, for the period 01.04.2017 to 31.07.

2017

1) Physical verification of the equipment and furniture has not been done. All the equipment
and furniture procured under the project shall be physically verified by the management and
any discrepancies need to be reported and taken care of. An asset register shall be
maintained and updated with all procurements made under the project.