Professional Documents
Culture Documents
General Notes & Specifications:: Septic Vault Detail Catch Basin Detail
General Notes & Specifications:: Septic Vault Detail Catch Basin Detail
ALL PLUMBING WORKS AND INSTALLATIONS SHALL CONFORM WITH THE LATEST EDITION OF
NATIONAL PLUMBING CODE RULES & REGULATION OF THE ENFORCING AUTHORITY CONCERNED AND CITY.
ALL HORIZONTAL PIPING SHALL RUN IN PRACTICAL ALIGNMENT AND SHALL BE PROVIDE WITH
SLOPE OF NOT LESS THAN 1 % SLOPE AND SUPPORTED OFANCHORD EVERY 3.00 M. INTERVALS.
1200
400
MANHOLE MANHOLE MANHOLE
ALL PLUMBING INSTALLLATIONS SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY 0.15 M. ON CENTER B.W.
400 400 400
300
AIR SPACE
3" THK. PRE-CAST
500 500 INLET OUTLET
MANHOLE COVER
6" CONC. COLVERT
100300 100 100300 100
4" THK. CHB
1700
1200
DIGESTIVE CHAMBER LEACHING LEACHING
CHAMBER CHAMBER
600
200
0.15 M. ON CENTER B.W.
INLET OUTLET INLET OUTLET
100
100