Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Project Summary

Project name: Belajar GPS


Surveyor: SMK NEGERI 1 MADIUN
Comment:
Linear unit: Meters
Projection: UTMSouth-Zone_49 : 108E to 114E
Geoid:
Adjustment Summary

Adjustment type: Plane + Height, Minimal constraint


Confidence level: 95 %
Number of adjusted points: 5
Number of plane control points: 1
Number of used GPS vectors: 4
A posteriori plane UWE: 1 , Bounds: ( 1 , 1 )
Number of height control points: 1
A posteriori height UWE: 1 , Bounds: ( 1 , 1 )

Observation View

Used GPS Observations


Name dN (m) dE (m) dHt (m) Horz RMS (m) Vert RMS (m)
Base StationRover 1 11.200 -8.445 -0.045 0.007 0.005
Base StationRover 2 61.033 -142.348 0.515 0.005 0.010
Base StationRover 3 142.950 55.750 0.386 0.004 0.005
Base StationRover 4 324.247 -0.714 0.046 0.004 0.011

Control Points
Name Grid Northing (m) Grid Easting (m) Elevation (m) Code
Base Station 9188495.211 689400.997 33.957

Adjusted Points
Name Grid Northing (m) Grid Easting (m) Elevation (m) Code
Rover 1 9188506.411 689392.552 33.912
Rover 2 9188556.244 689258.648 34.472
Rover 3 9188638.161 689456.746 34.343
Rover 4 9188819.458 689400.282 34.003

Point Summary
Name Grid Northing (m) Grid Easting (m) Elevation (m) Code
Base Station 9188495.211 689400.997 33.957
Rover 1 9188506.411 689392.552 33.912
Rover 2 9188556.244 689258.648 34.472
Rover 3 9188638.161 689456.746 34.343
Rover 4 9188819.458 689400.282 34.003

You might also like