2. WASTAGE 5% 78.50
SUB-TOTAL 2,098.50
ADD: PROFIT (15%) 314.78
TOTAL 2,413.28
3. EXMET 0.40
6. LABOUR 9.50
SUB-TOTAL 26.89
30.00
TENDER RATE
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
TOTAL
8.
2. WASTAGE 5% 110.00
SUB-TOTAL 3,910.00
TOTAL 4,496.50
4,500.00
TENDER RATE
COST/TONNE RM450.00
LABOUR
1. CERTIFIED WELDER 4NOS. RM800.00 / DAY
2. GENERAL WORKERS 5NOS RM250.00
TOTAL RM1,050.00
2. WASTAGE 5% 0.83
SUB-TOTAL 31.33
TOTAL 36.03
36.00
TENDER RATE
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
BUILD-UP UNIT RATES
500 mm THICK CEMENT & SAND (1 : 1.5 : 3); TROWELLED HARD & SMOOTH
SUB-TOTAL 104.86
ADD: PROFIT (15%) 15.73
TOTAL 120.59
TENDER RATE 120.00
2. WASTAGE 5% 3.13
3. LABOUR 27.65
SUB-TOTAL 109.28
TOTAL 125.67
125.00
TENDER RATE
25
25 PIECES @ RM2.50/PIECE
62.5
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
2. WASTAGE 5% 1.65
SUB-TOTAL 46.95
TOTAL 53.99
54.00
TENDER RATE
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
2. WASTAGE 5% 1.00
SUB-TOTAL 26.30
TOTAL 30.25
30.00
TENDER RATE
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
3. WASTAGE 5% 3.19
SUB-TOTAL 86.94
TOTAL 99.98
100.00
TENDER RATE
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
3. LABOUR 6.10
SUB-TOTAL 15.06
TOTAL 17.32
17.50
TENDER RATE
3. LABOUR 2.70
SUB-TOTAL 4.98
TOTAL 5.73
5.00
TENDER RATE
0.14
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
3. LABOUR 4.00
SUB-TOTAL 26.02
TOTAL 29.92
29.90
TENDER RATE
0.14
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
2. WASTAGE 5% 1.25
3. LABOUR 26.00
SUB-TOTAL 63.05
TOTAL 72.51
72.50
TENDER RATE
25
25 PIECES @ RM1.00/PIECE
25
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
2. WASTAGE 5% 1.30
3. LABOUR 13.20
SUB-TOTAL 43.50
TOTAL 50.03
50.00
TENDER RATE
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
968.75 1,850.00
TENDER RATE
LABOUR
3. LABOUR 50.00
SUB-TOTAL 825.97
TOTAL 949.86
950.00
TENDER RATE
LABOUR
1 SKILLED WORKER RM200.00
2 GENERAL WORKER @ RM50/DAY RM100.00
TOTAL RM300.00
NO. OF WC INSTALLED / DAY 6
EST. PRODUCTION
(30NOS X 2TRIPS/HR X 8HRS) 480 NO/DAY
COST/NO RM4.38
3. LABOUR 50.00
SUB-TOTAL 614.96
TOTAL 707.21
775.00
TENDER RATE
LABOUR
1 SKILLED WORKER RM200.00
2 GENERAL WORKER @ RM50/DAY RM100.00
TOTAL RM300.00
1. EST. PRODUCTION
(48NOS X 2TRIPS/HR X 8HRS) 768 NO/DAY
COST/NO RM2.73
Installation
a. Backhoe 1 250
b. Supervisor 1 100
c. Operator 1 100
d. General labour 2 45
e. Diesel 50 1
TOTAL
153.75
14.00
18.44
15.00
201.19
30.18
231.37
233.75
Total
250.00
100.00
100.00
90.00
50.00
590.00
675dia.
4
32
18.44
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
Installation
1. Install Qty
a. Backhoe 1
b. Supervisor 1
c. Operator 1
d. General labour 2
e. Diesel 50
TOTAL
7.99
18.44
15.00
201.18
40.24
241.41
260.16
250 250.00
100 100.00
100 100.00
45 90.00
1 50.00
590.00
675dia.
4
32
18.44
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
375mm 450mm
Installation
a. Backhoe 1 250
b. Supervisor 1 100
c. Operator 1 100
d. General labour 2 45
e. Diesel 50 1
TOTAL
600mm
199.29
9.96
18.44
15.00
242.69
36.40
279.09
350.00
350.00
Total
250.00
100.00
100.00
90.00
50.00
590.00
600dia.
4
32
18.44
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
Installation
500mm
382.50
19.13
18.44
420.07
63.01
483.08
500.00
500dia.
4
32
18.44
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
320.00
TENDER RATE
Cost /m3
* outpt 15m3/day
= RM560 / 15m3 37.33
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
FORMWORK
36.00
TENDER RATE
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
1. Backhoe
-rent backhoe 3/8/hour
= RM300/8 1 37.50 37.50
- Operator 1 50.00 50.00
- Lubricant
= 12 liter / 7 days x 20.00 1 34.29 34.29
Others
Material and labour:-
- Excavation & temporary 66.60 140.40 385.10 1,620.00 1,836.00
strutting
- Rock excavation - 280.80 462.00 1,200.00 1,452.00
- 50 mm thick lean concrete 27.74 27.74 27.74 38.43 38.43
Grade 15
- 230 mm thick concrete 131.78 131.78 131.78 182.58 182.58
Grade 20 base slab
- Formwork to base slab 46.92 46.92 46.92 55.20 55.20
- BRC A393 115.20 115.20 115.20 159.60 159.60
- Concrete benching 90.04 90.04 90.04 140.69 140.69
- 20 mm thick high alumina 113.14 169.71 297.00 565.71 748.00
cement mortar (1:2)
- Stainless steel steps 250.00 350.00 600.00 1,000.00 1,250.00
- 150 mm thick concrete 367.66 551.49 965.11 2,168.44 2,700.00
Grade 20 surround
2. LABOUR 70.00
SUB-TOTAL 870.00
ADD: PROFIT (15%) 130.50
TOTAL 1,000.50
TENDER RATE 1,000.00
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
1. Professional Fees
Engineer Mechanical & Electrical 7,000.00
2. Electrical Drawings
a) Wiring
4 Set = 25 copies x 4 sets x RM6.00 / pcs 600.00
3 Mechanical Drawings
a) Internal Water Plumbing
4 Set = 10 copies x 4 sets x RM6.00 / pcs 240.00
b) Air conditional
4 Set = 40 copies x 4 sets x RM6.00 / pcs 960.00
8,800.00
SUB-TOTAL 8,800.00
ADD: PROFIT (15%) 1,320.00
TOTAL 10,120.00
CONTRACTOR'S TENDER RATE 15,000.00
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
2. Maintenance
10 % x RM24,000.00 2,400.00
b) 2 General Workers
2 nos x RM45.00/nos 90.00
26,790.00
SUB-TOTAL 26,790.00
ADD: PROFIT (15%) 4,018.50
TOTAL 30,808.50
CONTRACTOR'S TENDER RATE 35,000.00
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
2. Telephone Bill
RM200 x 20 Months 4,000.00
SUB-TOTAL 6,090.00
ADD: PROFIT (15%) 913.50
TOTAL 7,003.50
CONTRACTOR'S TENDER RATE 27,000.00
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
SUB-TOTAL 1,200.00
ADD: PROFIT (15%) 180.00
TOTAL 1,380.00
CONTRACTOR'S TENDER RATE 1,500.00
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
Assumption:
a) The number of security guards on duty = 1 person /shift
b) The number of shift security guard = 3 shift / day
SUB-TOTAL 81,360.00
ADD: PROFIT (15%) 12,204.00
TOTAL 93,564.00
CONTRACTOR'S TENDER RATE 126,000.00
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
2 Maintenance
= 20% x RM64,000.00 12,800.00
SUB-TOTAL 83,200.00
ADD: PROFIT (15%) 12,480.00
TOTAL 95,680.00
CONTRACTOR'S TENDER RATE 90,000.00
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
Assumption:
Progress Photographs = 6 set / month
The number of pictures. = 10 pcs/set
The cost of the picture = RM0.60 / pcs
The cost of the film = RM20.00 / box
1 Camera
a) Initial cost 1,500.00
Film
= RM15.00 / box x 2 box x 20 months 600.00
Picture
= 10 pictures x 6 sets x RM0.60 x 20 months 720.00
2,820.00
SUB-TOTAL 3,320.00
ADD: PROFIT (15%) 498.00
TOTAL 3,818.00
CONTRACTOR'S TENDER RATE 9,000.00
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
1 Water pump
a) Initial cost 6,000.00
b) Oil
= 10% x RM6,000.00 600.00
c) Maintenance
= 10% x RM6,000.00 600.00
7,200.00
2 Temporary drain.
a) Trench
= 100 m x RM5.00/m 500.00
b) Concrete Drain
= 20 m x RM10.00/m 200.00
700.00
3 Maintenance
= 10% x RM700/m 70.00
70.00
SUB-TOTAL 8,110.00
ADD: PROFIT (15%) 1,216.50
TOTAL 9,326.50
CONTRACTOR'S TENDER RATE 18,000.00
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN
MEMBINA SEBUAH BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN
SATU BANGUNAN KEDIAMAN PEKERJA 1 TINGKAT DAN 1 BILIK REHAT 1
TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR
Assumption:
Time for cleaning the site = 1 day / month
Time for cleaning the site upon completion = 3 days.
1 Monthly Cleaning
a) 3 General workers = 3 x RM45.00 x 20 months 2,700.00
2,700.00
b) Handling
= Rental Bulldozer.
= RM300 x 20 Months 6,000.00
c) Transportation
= Rental Lorry 5 Tonne.
= RM300.00 x 20 Months 6,000.00
12,000.00
d) 10 % oil and lubricant 1,200.00
13,200.00
2 Cleaning The Site Upon Completion
a) Building cleaning
= 10 General Workers x 3 days x RM45.00 / person. 1,350.00
1,350.00
SUB-TOTAL 17,250.00
ADD: PROFIT (15%) 2,587.50
TOTAL 19,837.50
CONTRACTOR'S TENDER RATE 180,000.00
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN MEMBINA SEBUAH
BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN SATU BANGUNAN KEDIAMAN PEKERJA 1
TINGKAT DAN 1 BILIK REHAT 1 TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR.
Assumption:
a) Excavation by using excavator 3/8 m3.
b) Rent cost excavator = RM500.00/days. (including
transportation to site)
2 Operation cost
a) Operator 60.00
b) Diesel = 5 liter x 8 hours x RM1.85 74.00
c) Lubricant
= 12 Liter x RM21.00 / 7 days 36.00
SUB-TOTAL 5.37
ADD: PROFIT (15%) 0.81
TOTAL / METER 6.18
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN MEMBINA SEBUAH
BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN SATU BANGUNAN KEDIAMAN PEKERJA 1
TINGKAT DAN 1 BILIK REHAT 1 TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR.
1 Material cost
a) R.C Drain / m 15.00
b) Connection (Cement & Sand) 3.50
18.50
Add 5% wastage 0.93
19.43 19.43
2 Labour cost
a) Skilled lobour
= 0.45 hours x RM60.00 / 8 hours 3.38
b) 2 Unskilled labour
= 0.45 hours x RM45.00 / 8 hours 2.53
SUB-TOTAL 25.33
ADD: PROFIT (15%) 3.80
TOTAL / METER 29.13
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN MEMBINA SEBUAH
BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN SATU BANGUNAN KEDIAMAN PEKERJA 1
TINGKAT DAN 1 BILIK REHAT 1 TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR.
Assumption:
Concrete Grade 20 = 1:2:4
Cement = RM15.00 / bag (50kg)
Sand = RM30.00 / m3
Aggregate = RM36.00 / m3
1 Material cost
a) 1 m3 cement = 28 bags x RM15.00 / bag 420.00
b) 2 m3 sand = 2 m3 x RM30.00 / m3 60.00
c) 4 m3 sand = 4 m3 x RM35.00 / m3 140.00
620.00
Cost for 1 m3
= RM655.20.00 / 7 m3 132.86 132.86
2 Labour cost
Concreter
= 2 hours x RM45.00 / 8 hours 11.25
Handling and placing
= 5 hours x RM45.00 / 8 hours 28.13
4 Cost / m
= RM172.23 x (0.30 m + 0.6 m + 0.125 m) x 2 x 0.125 m 44.13
SUB-TOTAL 44.13
ADD: PROFIT (15%) 6.62
TOTAL / METER 50.75
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN MEMBINA SEBUAH
BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN SATU BANGUNAN KEDIAMAN PEKERJA 1
TINGKAT DAN 1 BILIK REHAT 1 TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR.
1 Material cost
a) Fabric reinforcement = RM6.94 / m2 6.94
Add
i) Lapping = 12 % 0.83
ii) Wastage = 5% 0.35
iii) Tying wire and distance block = 10% 0.69
2 Labour cost
Unloading & arrangement
= 0.15 hours x RM45.00 / 8 hours 0.84
Cutting & fixing
= 0.20 hours x RM45.00 / 8 hours 1.13
4 Cost / m
= RM10.78 x (0.30 m + 0.30 m +0.6 m + 0.6 m) 19.40
SUB-TOTAL 19.40
ADD: PROFIT (15%) 2.91
TOTAL / METER 22.31
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN MEMBINA SEBUAH
BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN SATU BANGUNAN KEDIAMAN PEKERJA 1
TINGKAT DAN 1 BILIK REHAT 1 TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR.
Assumption:
Hardcore = RM30.00 / m3 ( including delivery on site)
Compactor = RM60.00 / m3 ( including diesel)
Compactor output = 15 m2/ hour
1 Material cost
a) 100 mm Thick hardcore / m2 = RM30.00 x 0.30 m 9.00
b) 25% compaction and wastage 2.25
2 Labour cost
a) Handle the compactor.
= 1 hour x RM45.00 / 8 hours 5.63
b) Spread and leveling
= 0.15 hours x RM45.00 / 8 hours 0.84
3 Plant cost
a) Rent cost for compactor = RM60.00 / 8 hour 7.50
b) Compactor Output = 15m2
= 7.50 / 15 m2 0.50
c) Total Plant cost 8.00 8.00
5 Cost / m
= RM25.27 x (0.30 m + 0.125 m + 0.125m) 14.15
SUB-TOTAL 14.15
ADD: PROFIT (15%) 2.12
TOTAL / METER 16.27
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN MEMBINA SEBUAH
BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN SATU BANGUNAN KEDIAMAN PEKERJA 1
TINGKAT DAN 1 BILIK REHAT 1 TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR.
Assumption:
Plywood 2.40 m x 1.2 m x 12 mm thick = RM35.00 / pcs
Timber = RM900.00 / tonne ( 1.40 m3)
Nails = RM5.00/kg
Quantity formwork can used = 6 times
1 Material cost
a) Plywood = RM12.00 / m2 4.17
2.40 m x 1.2 m
2 Labour cost
4 Cost / m
= RM23.34 x (0.6 m + 0.10 m) 16.21
SUB-TOTAL 64.84
ADD: PROFIT (15%) 9.73
TOTAL / METER 74.57
CADANGAN MEROBOH BANGUNAN ISTANA 2 TINGKAT SEDIADA DAN MEMBINA SEBUAH
BANGUNAN ISTANA PERLIS BARU 2 TINGKAT DENGAN SATU BANGUNAN KEDIAMAN PEKERJA 1
TINGKAT DAN 1 BILIK REHAT 1 TINGKAT (UNTUK POLIS PENGIRING) DI ATAS TANAH KERAJAAN,
SEKSYEN 63, JALAN EATON (OFF JALAN TUN RAZAK), KUALA LUMPUR.
Summary