JUL'17 DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE DUBA - ACTUALIZA 26-Jul-17 08:05

Filtro Activity ID Activity Name Original Total Start Finish DUBA - DUBA - DUBA - Physical Budgeted BL Project Actual Labor At Completion Units % DUBA - Documento DUBA Last Month Last Month 2016 2017 2018 2019
Started Expected Finished % Labor Units Labor Units Units Labor Units Complete CICLO ELIMINATED
Start Finish J J JJ J JJ J
Duration Float Complete 567 91 11 1 11 222 2 22 2 333 33 33 4
672 -10 21-Nov-15 A 22-Sep-17 21-Nov-15 22-Sep-17 54845.19 54845.19 44496.97 54845.19 81.13% 21-Nov-15 22-Sep-17 22-Sep-17, Total
Total
378 -76 22-Jun-16 A 14-Aug-17 22-Jun-16 14-Aug-17 1136.80 1136.80 862.14 1136.80 75.84% 22-Jun-16 14-Aug-17 14-Aug-17,

20 0ENPILC_61650 Isometric Drawing System LC - Condensate System - IFD 90 -162 22-Jun-16 A 05-Jul-17 22-Jun-16 05-Jul-17 88.89% 366.39 366.39 325.68 366.39 88.89% CC DUB-00-LCE-TDT-IEM-870 22-Jun-16 05-Jul-17 Isometric Drawing System LC - C
20 0ENPIQE_62460 Isometric Drawing System QF - Central Control Air Generation & Air Distribution System
60 --78
IFC27-Sep-16 A 12-Jul-17 27-Sep-16 12-Jul-17 83.3% 56.68 56.68 47.21 56.68 83.3% SC DUB-10-QFA-TDT-IEM-870 27-Sep-16 12-Jul-17 Isometric Drawing System QF -
20 0ENPIQE_62410 Isometric Drawing System QE - General Compressed Air and Carrier Air Supply - IFC
60 -78 27-Sep-16 A 12-Jul-17 27-Sep-16 12-Jul-17 92% 56.68 56.68 52.15 56.68 92% SC DUB-00-QEA-TDT-IEM-870 27-Sep-16 12-Jul-17 Isometric Drawing System QE -
20 0ENELUS_60270 Grounding System. Auxiliary plants, buildings and storage units - IFC 60 -96 27-Oct-16 A 30-Jun-17 27-Oct-16 30-Jun-17 50.01% 51.49 51.49 25.75 51.49 50.01% DUB-10-US-EDG-IEM-001 27-Oct-16 30-Jun-17 Grounding System. Auxiliary plant
20 0ENPIGM_62340 Isometric Drawing System GM - Process Drainage System - IFC 60 -60 15-Nov-16 A 22-Jul-17 15-Nov-16 22-Jul-17 88% 0.00 0.00 0.00 0.00 0% SC/CC DUB-10-GMA-TDT-IEM-870 15-Nov-16 22-Jul-17 Isometric Drawing System GM -
20 0ENPIQC_62320 Isometric Drawing System LFN - Chemical Dosing to Feedwater and Condensate -63
IFC-147 01-Jan-17 A 15-Jul-17 01-Jan-17 15-Jul-17 75% 0.00 0.00 0.00 0.00 0% CC DUB-10-LFN-TDT-IEM-870 01-Jan-17 15-Jul-17 Isometric Drawing System LFN -
20 0ENPIWA_22820 Isometric Drawing Solar Field Piping - (WA) - IFC 40 -63 20-Jan-17 A 23-Jun-17 20-Jan-17 23-Jun-17 20% 58.51 58.51 11.70 58.51 20% CC DUB-04-WA-TDT-IEM-870 20-Jan-17 23-Jun-17 Isometric Drawing Solar Field Piping - (WA) - IFC
20 0ENPIQJ_62390 Isometric Drawing System QJ - Central Gas Supply, also inert gas - IFC 60 -47 28-Jan-17 A 16-Jul-17 28-Jan-17 16-Jul-17 75% 0.00 0.00 0.00 0.00 0% SC/CC DUB-10-QJA-TDT-IEM-870 28-Jan-17 16-Jul-17 Isometric Drawing System QJ -
20 0ENPILA_61680 Isometric Drawing System LA - Feedwater System - IFC 60 -196 06-Apr-17 A 14-Aug-17 06-Apr-17 14-Aug-17 83.3% 133.65 133.65 111.30 133.65 83.28% CC DUB-10-LAA-TDT-IEM-870 06-Apr-17 14-Aug-17 Isometric Drawing System LA -
20 0ENPILB_61660 Isometric Drawing System LB - Main Steam System - IFC 60 -167 06-Apr-17 A 04-Aug-17 06-Apr-17 04-Aug-17 80% 296.77 296.77 237.42 296.77 80% CC DUB-10-LBA-TDT-IEM-870 06-Apr-17 04-Aug-17 Isometric Drawing System LB -
20 0ENPRVB_62710 Performance Calculations - IFC 29 -68 26-Apr-17 A 23-Jun-17 26-Apr-17 23-Jun-17 0% 25.03 25.03 0.00 25.03 0% SC DUB-00-V-BC-IEM-100 26-Apr-17 23-Jun-17 Performance Calculations - IFC
20 0ENPILC_61640 Isometric Drawing System LC - Condensate System - IFC 60 -126 06-May-17 A 04-Aug-17 06-May-17 04-Aug-17 55.6% 91.60 91.60 50.93 91.60 55.6% CC DUB-10-LCA-TDT-IEM-870 06-May-17 04-Aug-17 Isometric Drawing System LC -
345 4 17-Aug-16 A 30-Jul-17 17-Aug-16 30-Jul-17 72.41 72.41 0.00 72.41 0% 17-Aug-16 27-Jul-17 30-Jul-17, Black Start Diesel Building
Black Start Diesel Building
20 0ENELUM_62680 Raceways. Emergency/Black start Diesel Area - IFD 30 -161 17-Aug-16 A 30-Jul-17 17-Aug-16 30-Jul-17 0% 48.27 48.27 0.00 48.27 0% SC DUB-00-UMJ-EDB-IEM-001 17-Aug-16 30-Jun-17 Raceways. Emergency/Black start Diesel Area - IFD
20 0ENELUMJ62670 Lighting System. Emergency/Black start Diesel Area - IFC 45 7 13-Jun-17 A 27-Jul-17 13-Jun-17 27-Jul-17 0% 24.14 24.14 0.00 24.14 0% SC DUB-00-UMJ-EDO-IEM-001 13-Jun-17 27-Jul-17 Lighting System. Emergency/Bla
21 -177 18-Jan-17 A 08-Jul-17 18-Jan-17 07-Feb-17 0.00 0.00 0.00 0.00 0% 18-Jan-17 08-Jul-17 08-Jul-17, Electrochlorination Building
Electrochlorination Building
17 0PRCIU__62310 Electrochlorination Building. Steel Structure Workshop Drawings 21 -177 18-Jan-17 A 08-Jul-17 18-Jan-17 07-Feb-17 0% 0.00 0.00 0.00 0.00 0% CC 18-Jan-17 08-Jul-17 Electrochlorination Building. Stee
21 62 01-Jan-17 A 12-Jul-17 01-Jan-17 11-Feb-17 0.00 0.00 0.00 0.00 0% 01-Jan-17 12-Jul-17 12-Jul-17, Warehouse Shelter
Warehouse Shelter
17 0PRCIUS_62190 Warehouse Shelters. Steel Structure Workshop Drawings 21 62 01-Jan-17 A 12-Jul-17 01-Jan-17 11-Feb-17 0% 0.00 0.00 0.00 0.00 0% CC 01-Jan-17 12-Jul-17 Warehouse Shelters. Steel Struc
224 -111 21-Nov-16 A 24-Jul-17 21-Nov-16 24-Jul-17 1847.95 1847.95 1806.74 1847.95 97.77% 21-Nov-16 10-Jul-17 24-Jul-17, HTF - Auxiliary Pumps
HTF - Auxiliary Pumps
20 0PRMEWT_23960 Manufacturing - Auxiliary & Overflow HTF pumps 224 -111 21-Nov-16 A 24-Jul-17 21-Nov-16 24-Jul-17 97.77% 1847.95 1847.95 1806.74 1847.95 97.77% CC 21-Nov-16 10-Jul-17 Manufacturing - Auxiliary & Overflow HTF pumps
99 -140 22-Apr-17 A 25-Jul-17 22-Apr-17 25-Jul-17 20.25 20.25 0.00 20.25 0% 22-Apr-17 14-Jul-17 25-Jul-17, HTF - Purification & Condensing
HTF - Purification & Condensing
20 0ENINWT_21255 Logic Diagram. Storage and Maintenance HTF. (WTD) - IFC 40 -141 22-Apr-17 A 30-Jun-17 22-Apr-17 30-Jun-17 0% 0.00 0.00 0.00 0.00 0% CC DUB-04-WTU-YDL-IEM-751 22-Apr-17 30-Jun-17 Logic Diagram. Storage and Main
20 0ENCIWT_21070 HTF System.Storage Tanks and Ullage Area. Ground slab 40 -140 26-May-17 A 25-Jul-17 26-May-17 25-Jul-17 0% 20.25 20.25 0.00 20.25 0% CC DUB-04-UWT-CDR-IEM-545 26-May-17 14-Jul-17 HTF System.Storage Tanks and
48 0 22-Dec-16 A 04-Jul-17 22-Dec-16 04-Jul-17 184.08 184.08 92.04 184.08 50% 22-Dec-16 04-Jul-17 04-Jul-17, Gasoline Station
Gasoline Station
20 0ENCIUY_61352 Gasoline Station. Foundation. - IFC 41 8 22-Dec-16 A 26-Jun-17 22-Dec-16 26-Jun-17 50% 110.45 110.45 55.23 110.45 50% CC DUB-00-UYT-CDF-IEM-101 22-Dec-16 26-Jun-17 Gasoline Station. Foundation. - IFC
20 0ENCIUY_91350 Gasoline Station Foundation. 41 8 22-Dec-16 A 26-Jun-17 22-Dec-16 26-Jun-17 50% 0.00 0.00 0.00 0.00 0% CC DUB-00-UYT-CDF-IEM-101 22-Dec-16 26-Jun-17 Gasoline Station Foundation.
20 0ENCIUY_91351 Gasoline Station. Tanks Foundation 41 8 22-Dec-16 A 26-Jun-17 22-Dec-16 26-Jun-17 50% 0.00 0.00 0.00 0.00 0% CC DUB-00-UYT-CDR-IEM-101 22-Dec-16 26-Jun-17 Gasoline Station. Tanks Foundation
20 0ENCIUY_91352 Gasoline Station General Arrangements 41 8 22-Dec-16 A 26-Jun-17 22-Dec-16 26-Jun-17 50% 0.00 0.00 0.00 0.00 0% CC DUB-00-UYT-CDF-IEM-120 22-Dec-16 26-Jun-17 Gasoline Station General Arrangements
20 0ENCIUY_91353 Gasoline Station Floor Slabs. 41 8 22-Dec-16 A 26-Jun-17 22-Dec-16 26-Jun-17 50% 0.00 0.00 0.00 0.00 0% CC DUB-00-UYT-CDF-IEM-110 22-Dec-16 26-Jun-17 Gasoline Station Floor Slabs.
20 0ENCIUY_61362 Gasoline Station. Steel Structure. - IFC 41 -9 28-Dec-16 A 04-Jul-17 28-Dec-16 04-Jul-17 50% 73.63 73.63 36.82 73.63 50% CC DUB-00-UYT-CC-IEM-101 28-Dec-16 04-Jul-17 Gasoline Station. Steel Structure. - IFC
20 0ENCIUY_91360 Gasoline Station. Calculations. 41 -9 28-Dec-16 A 04-Jul-17 28-Dec-16 04-Jul-17 50% 0.00 0.00 0.00 0.00 0% CC DUB-00-UYT-CC-IEM-101 28-Dec-16 04-Jul-17 Gasoline Station. Calculations.
20 0ENCIUY_91361 Gasoline Station Structure. 41 -9 28-Dec-16 A 04-Jul-17 28-Dec-16 04-Jul-17 50% 0.00 0.00 0.00 0.00 0% CC DUB-00-UYT-CDS-IEM-101 28-Dec-16 04-Jul-17 Gasoline Station Structure.
48 -178 09-Mar-17 A 24-Jul-17 09-Mar-17 23-Jun-17 0.00 0.00 0.00 0.00 0% 09-Mar-17 24-Jul-17 24-Jul-17, Foam Station
Foam Station
20 0ENCIUS_92501 Foam Station Shelter. Equipment foundations. 30 -199 09-Mar-17 A 23-Jun-17 09-Mar-17 23-Jun-17 0% 0.00 0.00 0.00 0.00 0% SC DUB-00-USJ-CDF-IEM-101 09-Mar-17 23-Jun-17 Foam Station Shelter. Equipment foundations.
20 0ENCIUS_61092 Foam Station Shelter. Architectural Drawing. - IFC 41 -178 10-Mar-17 A 24-Jul-17 10-Mar-17 23-Jun-17 25% 0.00 0.00 0.00 0.00 0% SC DUB-00-USJ-CDF-IEM-105 10-Mar-17 24-Jul-17 Foam Station Shelter. Architectural Drawing. - IFC
36 -181 22-Dec-16 A 23-Jun-17 22-Dec-16 23-Jun-17 102.39 102.39 40.96 102.39 40% 22-Dec-16 23-Jun-17 23-Jun-17, SF - Catalogue Supports
SF - Catalogue Supports
20 0ENPIWA_22920 Solar field standard catalogue elements list (MTO 2) - IFC 36 -181 22-Dec-16 A 23-Jun-17 22-Dec-16 23-Jun-17 40% 102.39 102.39 40.96 102.39 40% CC DUB-10-WA-TLS-IEM-842 22-Dec-16 23-Jun-17 Solar field standard catalogue elem
90 -134 22-Feb-17 A 06-Jul-17 22-Feb-17 06-Jul-17 0.00 0.00 0.00 0.00 0% 22-Feb-17 06-Jul-17 06-Jul-17, Flow Vortex
Flow Vortex
20 0ENINCM_62810 Suppliers Documentation Review. Flow Vortex 90 -134 22-Feb-17 A 06-Jul-17 22-Feb-17 06-Jul-17 0% 0.00 0.00 0.00 0.00 0% SC DUB-10-T-YT-IEM-752 22-Feb-17 06-Jul-17 Suppliers Documentation Review. Flow Vortex
180 -122 18-Aug-16 A 27-Jun-17 18-Aug-16 27-Jun-17 2211.56 2211.56 2207.36 2211.56 99.81% 18-Aug-16 27-Jun-17 27-Jun-17, Fuel Site Tanks
Fuel Site Tanks
20 0PRMEVB_61860 Transport to Site - Fuel Site Tanks 180 -122 18-Aug-16 A 27-Jun-17 18-Aug-16 27-Jun-17 99.81% 2211.56 2211.56 2207.36 2211.56 99.81% SC 18-Aug-16 27-Jun-17 Transport to Site - Fuel Site Tanks
267 -111 30-Sep-16 A 25-Aug-17 30-Sep-16 25-Aug-17 0.00 0.00 0.00 0.00 0% 30-Sep-16 25-Aug-17 25-Aug-17, Process Pumps
Process Pumps
20 0PRMEPC_62160 Manufacturing - Auxiliary cooling water pumps (2x100%) 267 -107 30-Sep-16 A 21-Aug-17 30-Sep-16 21-Aug-17 0% 0.00 0.00 0.00 0.00 0% SC 30-Sep-16 21-Aug-17 Manufacturing - Auxiliary coolin
20 0PRMEGA_62170 Manufacturing - Vertical Seawater Water Pumps (Intake) 203 -137 05-Dec-16 A 25-Aug-17 05-Dec-16 25-Aug-17 0% 0.00 0.00 0.00 0.00 0% SC 05-Dec-16 25-Aug-17 Manufacturing - Vertical Seawa
64 -137 08-Dec-16 A 22-Jul-17 08-Dec-16 22-Jul-17 0.00 0.00 0.00 0.00 0% 08-Dec-16 22-Jun-17 22-Jul-17, Gas (N2) Supply
Gas (N2) Supply
20 0ENMEQJ_20790 Gas (N2) Supply System Suppliers Documentation Review 64 -137 08-Dec-16 A 22-Jul-17 08-Dec-16 22-Jul-17 0% 0.00 0.00 0.00 0.00 0% CC DUB-00-T-MT-IEM-507 08-Dec-16 22-Jun-17 Gas (N2) Supply System Supplie
30 -202 23-Dec-16 A 29-Jun-17 23-Dec-16 06-Jul-17 0.00 0.00 0.00 0.00 0% 23-Dec-16 29-Jun-17 29-Jun-17, Deareator
Deareator
20 0PRCIU__62030 Deareator Structure - Steel Structure Workshop Drawings 30 -202 23-Dec-16 A 29-Jun-17 23-Dec-16 06-Jul-17 0% 0.00 0.00 0.00 0.00 0% CC 23-Dec-16 29-Jun-17 Deareator Structure - Steel Struc
30 -5 07-Jun-16 A 05-Jul-17 07-Jun-16 05-Jul-17 0.00 0.00 0.00 0.00 0% 07-Jun-16 05-Jul-17 05-Jul-17, Gate House
Gate House
20 0ENCIUY_91080 Industrial Gate House. Calculations. 30 -5 07-Jun-16 A 05-Jul-17 07-Jun-16 05-Jul-17 50% 0.00 0.00 0.00 0.00 0% SC/CC DUB-00-UYE-CC-IEM-101 07-Jun-16 05-Jul-17 Industrial Gate House. Calculations.
90 -89 28-Oct-16 A 12-Jul-17 28-Oct-16 12-Jul-17 139.62 139.62 118.68 139.62 85% 28-Oct-16 12-Jul-17 12-Jul-17, Steam Turbine-Generator and Auxiliaries
Steam Turbine-Generator and Auxiliaries
20 0ENINMA_61990 Wiring and connection Diagram. Steam Turbine. System MA - IFC 90 -89 28-Oct-16 A 12-Jul-17 28-Oct-16 12-Jul-17 85% 139.62 139.62 118.68 139.62 85% CC DUB-03-MA-YDC-IEM-755 28-Oct-16 12-Jul-17 Wiring and connection Diagram.
30 -109 03-Jan-17 A 30-Jun-17 03-Jan-17 30-Jun-17 0.00 0.00 0.00 0.00 0% 03-Jan-17 30-Jun-17 30-Jun-17, Bottle Storage
Bottle Storage
20 0ENCIQJ_92561 Bottle Storage House. Calculations. 30 -109 03-Jan-17 A 30-Jun-17 03-Jan-17 30-Jun-17 0% 0.00 0.00 0.00 0.00 0% SC DUB-00-UTG-CC-IEM-101 03-Jan-17 30-Jun-17 Bottle Storage House. Calculations.
117 -113 05-Feb-17 A 05-Sep-17 05-Feb-17 05-Sep-17 115.31 115.31 102.31 115.31 88.73% 05-Feb-17 05-Sep-17 05-Sep-17, Pressure Gauges and Switches
Pressure Gauges and Switches
20 0PRINCM_62935 Manufacturing - Pressure Gauges and Switches (Combined Cycle) 117 -113 05-Feb-17 A 05-Sep-17 05-Feb-17 05-Sep-17 88.73% 115.31 115.31 102.31 115.31 88.73% CC 05-Feb-17 05-Sep-17 Manufacturing - Pressure Ga
100 -123 22-Feb-17 A 28-Jun-17 22-Feb-17 28-Jun-17 0.00 0.00 0.00 0.00 0% 22-Feb-17 28-Jun-17 28-Jun-17, Pressure Vessels
Pressure Vessels
20 0ENMEVB_20900 Pressure Vessels Suppliers Documentation Review 100 -123 22-Feb-17 A 28-Jun-17 22-Feb-17 28-Jun-17 0% 0.00 0.00 0.00 0.00 0% CC DUB-10-T-MT-IEM-502 22-Feb-17 28-Jun-17 Pressure Vessels Suppliers Documentation Review

Remaining Level of Effort ( New Bar ) Page 1 of 2 TASK filters: (Untitled Filter)_9, DUBA - Activity Sattus, DUBA -
Actual Level of Effort Tertiary Baseline EXPECTED, DUBA - PORTION, DUBA FASE.
Primary Baseline Actual Work Oracle Corporation
JUL'17 DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE DUBA - ACTUALIZA 26-Jul-17 08:05
Filtro Activity ID Activity Name Original Total Start Finish DUBA - DUBA - DUBA - Physical Budgeted BL Project Actual Labor At Completion Units % DUBA - Documento DUBA Last Month Last Month 2016 2017 2018 2019
Started Expected Finished % Labor Units Labor Units Units Labor Units Complete CICLO ELIMINATED
Start Finish J J JJ J JJ J
Duration Float Complete 567 91 11 1 11 222 2 22 2 333 33 33 4
100 -39 06-Mar-17 A 22-Jun-17 06-Mar-17 13-Jun-17 0.00 0.00 0.00 0.00 0% 06-Mar-17 22-Jun-17 22-Jun-17, Hoists
Hoists
19 0ENMESM_61250 Cranes, Hoists and Lifts Data Sheets Suppliers Documentation Review - IFC 100 -39 06-Mar-17 A 22-Jun-17 06-Mar-17 13-Jun-17 0% 0.00 0.00 0.00 0.00 0% CC DUB-10-T-MT-IEM-536 06-Mar-17 22-Jun-17 Cranes, Hoists and Lifts Data She
139 -139 03-Feb-17 A 15-Aug-17 03-Feb-17 15-Aug-17 26412.08 26412.08 19595.12 26412.08 74.19% 03-Feb-17 15-Aug-17 15-Aug-17, Fire Fighting Protection System
Fire Fighting Protection System
20 0ENMESG_20850 Fire Fighting System Equipment Suppliers Documentation Review 106 -197 03-Feb-17 A 17-Jul-17 03-Feb-17 17-Jul-17 20% 0.00 0.00 0.00 0.00 0% SC/CC DUB-10-T-MT-IEM-543 03-Feb-17 22-Jun-17 Fire Fighting System Equipment
20 0PRMESG_21070 Manufacturing - Fire Fighting System Detail Design, Collecting and 125 -139 28-Feb-17 A 15-Aug-17 28-Feb-17 15-Aug-17 74.19% 26412.08 26412.08 19595.12 26412.08 74.19% SC/CC 28-Feb-17 15-Aug-17 Manufacturing - Fire Fighting S
20 0ENPISG_62060 Isometric Drawing System SGA - Fire Fighting System - IFC 60 -212 22-May-17 A 22-Jul-17 22-May-17 22-Jul-17 0% 0.00 0.00 0.00 0.00 0% SC/CC DUB-10-SGA-TDT-IEM-870 22-May-17 22-Jul-17 Isometric Drawing System SGA
64 -118 11-Jan-17 A 30-Jun-17 11-Jan-17 15-Mar-17 0.00 0.00 0.00 0.00 0% 11-Jan-17 30-Jun-17 30-Jun-17, Air Compressed System
Air Compressed System
20 0PRCIU__62640 Manufacturing - Compressed Air Building Cladding 64 -118 11-Jan-17 A 30-Jun-17 11-Jan-17 15-Mar-17 0% 0.00 0.00 0.00 0.00 0% SC/CC 11-Jan-17 30-Jun-17 Manufacturing - Compressed Air Building Cladding
93 -101 29-Nov-16 A 25-Aug-17 29-Nov-16 25-Aug-17 16530.97 16530.97 14046.37 16530.97 84.97% 29-Nov-16 25-Aug-17 25-Aug-17, Security Systems a
Security Systems and Telecommunications
20 0PRINCY_30330 Manufacturing - Security and Telecom System Detail Design and 93 -101 29-Nov-16 A 25-Aug-17 29-Nov-16 25-Aug-17 84.97% 16530.97 16530.97 14046.37 16530.97 84.97% SC/CC 29-Nov-16 25-Aug-17 Manufacturing - Security and T
92 -124 22-Sep-16 A 17-Jul-17 22-Sep-16 17-Jul-17 0.00 0.00 0.00 0.00 0% 22-Sep-16 29-Jun-17 17-Jul-17, Differential Pressure T
Differential Pressure Transmitters and Pressure
20 0ENINCM_50304 Documentation Checking. Pressure and Differential Pressure Transmitters 92 -124 22-Sep-16 A 17-Jul-17 22-Sep-16 17-Jul-17 0% 0.00 0.00 0.00 0.00 0% SC/CC DUB-10-T-YT-IEM-733 22-Sep-16 29-Jun-17 Documentation Checking. Press
21 -157 15-Mar-17 A 22-Jun-17 15-Mar-17 22-Jun-17 2.38 2.38 0.71 2.38 30% 15-Mar-17 22-Jun-17 22-Jun-17, Plastic Pipe
Plastic Pipe
20 0PRPIVB_40120 Economical Evaluation and Order - Plastic Pipes 21 -157 15-Mar-17 A 22-Jun-17 15-Mar-17 22-Jun-17 30% 2.38 2.38 0.71 2.38 30% 15-Mar-17 22-Jun-17 Economical Evaluation and Order - Plastic Pipes
191 -154 27-Jan-17 A 31-Jul-17 27-Jan-17 31-Jul-17 0.00 0.00 0.00 0.00 0% 27-Jan-17 31-Jul-17 31-Jul-17, Piping Miscellaneous
Piping Miscellaneous
20 0PRPIVB_61950.6 Manufacturing - Strainers - Piping Miscellaneous 191 -154 27-Jan-17 A 31-Jul-17 27-Jan-17 31-Jul-17 0% 0.00 0.00 0.00 0.00 0% SC 27-Jan-17 31-Jul-17 Manufacturing - Strainers - Piping Miscellaneous
88 -103 22-Feb-17 A 22-Jun-17 22-Feb-17 20-May-17 0.00 0.00 0.00 0.00 0% 22-Feb-17 22-Jun-17 22-Jun-17, Pneumatic Valves
Pneumatic Valves
17 0ENINCM_63420 Documentation Checking. Control Valves 88 -103 22-Feb-17 A 22-Jun-17 22-Feb-17 20-May-17 0% 0.00 0.00 0.00 0.00 0% SC/CC DUB-10-T-YT-IEM-722 22-Feb-17 22-Jun-17 Documentation Checking. Control Valves
42 -52 07-Jun-17 A 18-Jul-17 07-Jun-17 18-Jul-17 0.00 0.00 0.00 0.00 0% 07-Jun-17 18-Jul-17 18-Jul-17, Feedwater Pumps
Feedwater Pumps
20 0PRMELA_21001 Transport to Site - Feedwater Pumps (GE) 42 -52 07-Jun-17 A 18-Jul-17 07-Jun-17 18-Jul-17 33% 0.00 0.00 0.00 0.00 0% CC 07-Jun-17 18-Jul-17 Transport to Site - Feedwater Pumps (GE)
224 -43 21-Nov-16 A 30-Jun-17 21-Nov-16 30-Jun-17 1914.97 1914.97 1846.80 1914.97 96.44% 21-Nov-16 30-Jun-17 30-Jun-17, Miscellaneous Centrifugal Pump
Miscellaneous Centrifugal Pump
20 0PRMEVA_62050 Manufacturing - Miscellaneous Centrifugal Pumps (HTF System) 224 -43 21-Nov-16 A 30-Jun-17 21-Nov-16 30-Jun-17 96.44% 1914.97 1914.97 1846.80 1914.97 96.44% CC 21-Nov-16 30-Jun-17 Manufacturing - Miscellaneous C
20 0ENMEVA_63120 Miscellaneous Centrifugal Pumps (HTF System) Suppliers Documentation Review126 -146 27-Nov-16 A 23-Jun-17 27-Nov-16 23-Jun-17 0% 0.00 0.00 0.00 0.00 0% CC DUB-10-T-MT-IEM-476 27-Nov-16 23-Jun-17 Miscellaneous Centrifugal Pumps
154 -130 07-Apr-17 A 22-Sep-17 07-Apr-17 22-Sep-17 47.42 47.42 25.69 47.42 54.18% 07-Apr-17 22-Sep-17 22-Sep-17, Flowmeters
Flowmeters
20 0PRINCM_63015 Manufacturing - Nozzles, Pitot and Ventruri Flow Elements (Combined Cycle) 154 -130 07-Apr-17 A 22-Sep-17 07-Apr-17 22-Sep-17 54.18% 47.42 47.42 25.69 47.42 54.18% CC 07-Apr-17 22-Sep-17 Manufacturing - Nozzles, Pito
30 -184 13-Feb-17 A 12-Jul-17 13-Feb-17 14-Mar-17 0.00 0.00 0.00 0.00 0% 13-Feb-17 12-Jul-17 12-Jul-17, Chemical Cleaning
Chemical Cleaning
16 0PRMESU_60710 Bid Period - Subcontractor - Chemical Cleaning 30 -184 13-Feb-17 A 12-Jul-17 13-Feb-17 14-Mar-17 30% 0.00 0.00 0.00 0.00 0% CC 13-Feb-17 12-Jul-17 Bid Period - Subcontractor - Chemical Cleaning
45 -225 18-Jun-17 A 01-Aug-17 18-Jun-17 01-Aug-17 0.00 0.00 0.00 0.00 0% 18-Jun-17 01-Aug-17 01-Aug-17, Water Treatment Plant Building
Water Treatment Plant Building
20 0PRCIUGD62000 Water Treatment Plant Building Main Steel Structure Workshop Drawings 45 -225 18-Jun-17 A 01-Aug-17 18-Jun-17 01-Aug-17 0% 0.00 0.00 0.00 0.00 0% SC 18-Jun-17 01-Aug-17 Water Treatment Plant Building
68 -165 24-Apr-17 A 28-Jun-17 24-Apr-17 28-Jun-17 64.00 64.00 59.37 64.00 92.77% 24-Apr-17 28-Jun-17 28-Jun-17, SF- Liners
SF- Liners
20 0PRSTWA_28020 Transport to Site - Bearing for solar field 68 -165 24-Apr-17 A 28-Jun-17 24-Apr-17 28-Jun-17 92.77% 64.00 64.00 59.37 64.00 92.77% CC 24-Apr-17 28-Jun-17 Transport to Site - Bearing for solar field
67 -199 14-Nov-16 A 30-Jun-17 14-Nov-16 30-Jun-17 254.03 254.03 190.52 254.03 75% 14-Nov-16 30-Jun-17 30-Jun-17, Main Cooling Water System
Main Cooling Water System
20 0ENCIUP_62630 Main Cooling Water System. Auxiliaries. Foundation, Sectionas & Details - IFC 67 -199 14-Nov-16 A 30-Jun-17 14-Nov-16 30-Jun-17 75% 254.03 254.03 190.52 254.03 75% SC DUB-00-UPA-CC-IEM-201 14-Nov-16 30-Jun-17 Main Cooling Water System. Auxi
13 -153 13-Feb-17 A 30-Jun-17 13-Feb-17 30-Jun-17 198.81 198.81 149.11 198.81 75% 13-Feb-17 30-Jun-17 30-Jun-17, Main Cooling Water S
Main Cooling Water System Pumping Chamber
20 0ENCIUP_61362 Main Cooling Water System. Pumping Chamber. Internal Structures. Geometry And13
Reinforcement
-153 13-Feb-17
- IFC A 30-Jun-17 13-Feb-17 30-Jun-17 75% 198.81 198.81 149.11 198.81 75% SC DUB-00-UPC-CDR-IEM-508 13-Feb-17 30-Jun-17 Main Cooling Water System. Pum
45 -51 05-Nov-16 A 30-Jun-17 05-Nov-16 30-Jun-17 0.00 0.00 0.00 0.00 0% 05-Nov-16 30-Jun-17 30-Jun-17, Demi Water Distribution System
Demi Water Distribution System
20 0ENELUGD61380 Raceways. Demineralised water plant Package (Coordination) - IFD 45 -75 05-Nov-16 A 27-Jun-17 05-Nov-16 27-Jun-17 0% 0.00 0.00 0.00 0.00 0% SC DUB-10-T-EDB-IEM-003 05-Nov-16 27-Jun-17 Raceways. Demineralised water p
20 0ENELUGD61170 Lighting System. Demineralised water plant Package (Coordination) - IFD 30 -51 11-Nov-16 A 30-Jun-17 11-Nov-16 30-Jun-17 50% 0.00 0.00 0.00 0.00 0% SC DUB-10-T-EDO-IEM-003 11-Nov-16 30-Jun-17 Lighting System. Demineralised w
45 -11 22-May-17 A 05-Jul-17 22-May-17 05-Jul-17 10.73 10.73 0.00 10.73 0% 22-May-17 05-Jul-17 05-Jul-17, Step-Up Transformer ST
Step-Up Transformer ST
20 0ENELUB_62480 Lighting System. Transformers Area layout. ST Area - IFC 45 -11 22-May-17 A 05-Jul-17 22-May-17 05-Jul-17 0% 10.73 10.73 0.00 10.73 0% CC DUB-03-UBC-EDO-IEM-001 22-May-17 05-Jul-17 Lighting System. Transformers A
280 -11 21-Nov-15 A 04-Jul-17 21-Nov-15 04-Jul-17 0.00 0.00 0.00 0.00 0% 21-Nov-15 04-Jul-17 04-Jul-17, DCS
DCS
20 0ENINCJ_50220 Suppliers Documentation Review. DCS - IFC 280 -11 21-Nov-15 A 04-Jul-17 21-Nov-15 04-Jul-17 0% 0.00 0.00 0.00 0.00 0% SC/CC DUB-10-T-YT-IEM-720 21-Nov-15 04-Jul-17 Suppliers Documentation Review. DCS - IFC
136 -97 27-Apr-17 A 09-Sep-17 27-Apr-17 09-Sep-17 0.00 0.00 0.00 0.00 0% 27-Apr-17 09-Sep-17 09-Sep-17, Insulation
Insulation
20 0PRPISU_20403 Insulation Installation Subcontractor Material Collecting and Mobilization 21 -78 27-Apr-17 A 22-Jun-17 27-Apr-17 22-Jun-17 0% 0.00 0.00 0.00 0.00 0% CC 27-Apr-17 22-Jun-17 Insulation Installation Subcontract
20 0PRPISU_40430 Manufacturing - Insulation Installation Subcontractor Material 92 -77 27-Apr-17 A 27-Jul-17 27-Apr-17 27-Jul-17 0% 0.00 0.00 0.00 0.00 0% CC 27-Apr-17 27-Jul-17 Manufacturing - Insulation Insta
20 0PRPIWA_25105 Manufacturing - solar field insulation 116 -97 17-May-17 A 09-Sep-17 17-May-17 09-Sep-17 0% 0.00 0.00 0.00 0.00 0% CC 17-May-17 09-Sep-17 Manufacturing - solar field insulation
90 54 26-Jan-17 A 05-Jul-17 26-Jan-17 05-Jul-17 13.96 13.96 8.38 13.96 60% 26-Jan-17 05-Jul-17 05-Jul-17, System Sampling and Analysis
System Sampling and Analysis
20 0ENINQU_61900 Wiring and connection Diagram. Sampling and Chemical Analisys System. System QU
90 - IFC
54 26-Jan-17 A 05-Jul-17 26-Jan-17 05-Jul-17 60% 13.96 13.96 8.38 13.96 60% CC DUB-00-QU-YDC-IEM-755 26-Jan-17 05-Jul-17 Wiring and connection Diagram.
45 5 22-May-17 A 05-Jul-17 22-May-17 05-Jul-17 4.29 4.29 0.00 4.29 0% 22-May-17 05-Jul-17 05-Jul-17, Heat Recovery Steam
Heat Recovery Steam Generator Unit #1 (HRSG)
20 1ENELUH_62655 Lighting System. HRSG (Heat Recovery Steam Generator) Area. GT 1 (coordination)
45 - IFC5 22-May-17 A 05-Jul-17 22-May-17 05-Jul-17 0% 4.29 4.29 0.00 4.29 0% CC DUB-11-T-EDO-IEM-001 22-May-17 05-Jul-17 Lighting System. HRSG (Heat Re
30 -58 19-Nov-16 A 07-Jul-17 19-Nov-16 07-Jul-17 6.44 6.44 3.22 6.44 50% 19-Nov-16 07-Jul-17 07-Jul-17, Heat Recovery Steam
Heat Recovery Steam Generator Unit #2 (HRSG)
20 2ENELUH_62460 Lighting System. HRSG (Heat Recovery Steam Generator) Area. GT 2 (coordination)
30 - IFD
-58 19-Nov-16 A 07-Jul-17 19-Nov-16 07-Jul-17 50% 6.44 6.44 3.22 6.44 50% CC DUB-12-T-EDO-IEM-001 19-Nov-16 07-Jul-17 Lighting System. HRSG (Heat Re
218 -29 02-Oct-16 A 23-Jun-17 02-Oct-16 23-Jun-17 3554.74 3554.74 3341.46 3554.74 94% 02-Oct-16 23-Jun-17 23-Jun-17, GRP Pipes
GRP Pipes
20 0PRPIPA_61890 GRP Pipes Suppliers Documentation Review 90 -118 02-Oct-16 A 23-Jun-17 02-Oct-16 23-Jun-17 27% 0.00 0.00 0.00 0.00 0% CC DUB-10-T-TT-IEM-830 02-Oct-16 23-Jun-17 GRP Pipes Suppliers Documentation Review
20 0PRPIPA_61850 Manufacturing - GRP Pipes 213 -29 06-Oct-16 A 23-Jun-17 06-Oct-16 19-Dec-16 94% 3554.74 3554.74 3341.46 3554.74 94% CC 06-Oct-16 23-Jun-17 Manufacturing - GRP Pipes
20 0PRPIPA_61920 Manufacturing - GRP Pipes Rest 90 -29 21-Dec-16 A 23-Jun-17 21-Dec-16 23-Jun-17 0% 0.00 0.00 0.00 0.00 0% CC 21-Dec-16 23-Jun-17 Manufacturing - GRP Pipes Rest

Remaining Level of Effort ( New Bar ) Page 2 of 2 TASK filters: (Untitled Filter)_9, DUBA - Activity Sattus, DUBA -
Actual Level of Effort Tertiary Baseline EXPECTED, DUBA - PORTION, DUBA FASE.
Primary Baseline Actual Work Oracle Corporation