NAMA : DHENDY S.

JABATAN : DRAFTER
PERIODE :

JUNI 2017
NO URAIAN P/R
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
1 Semen Indonesia
Frame Rubber Rain Cover BC1
- Assy & Single Part Drawing
- Erection Drawing

Compressor Room
Instalasi jaringan pipa

As Built Drawing
- Struktur BC2
- Mekanikal BC2
- Struktur BC1
- Mekanikal BC1

Dinas Ke Site Cilegon

2 Docking GMF

3 Jetty & Tank Timor Leste

NOTE : P/R (Planning dan Realization)


KETERANGAN

koordinasi perubahan desain dengan PT. SI

koordinasi dengan tim di site


koordinasi dengan tim di site
koordinasi dengan tim di site