Meeting Routine
Meeting Routine
1 Cement Indonesia -
-
2 Jembatan BG-30 -
3 Jembatan BG-60 -
4 Jembatan BG-25 -
5 Jembatan CG-25 -
6 Jembatan Sei Wampu -
7 Sky Walk da Antapani -
8 Ducting Hanazono -
9 Elnusa -
13 Karlita -
14 Cilengsi -
15 Trunajoyo -
16 Office lt-2 -
Keterangan Date-1 Date-2
End Date
Joint Survey hari 11/11/2016
Routine meeting Jam 10.00
Gambar
Material
Fabrikasi
Pontianak 11/11/2016
Cipta Konstruksi 11/25/2016
TPJ 11/7/2016 11/18/2016
TPJ 11/7/2016 11/25/2016
Bikin Surat ke TPJ perihal surat Crane 22-11-2016 11/30/2016
Cihampelas
PJU
FGB
Box 225 X 250
Stair
Handril Platform 11/10/2016
Handrail Stair 11/11/2016 11/12/2016
Angkur dan template
Antapani
PJU
Struktur Trafic Light
Angkur dan template
Line-1, Lain-3 dan line 2 belum jalan 12/1/2016
Cutting line-1
Cutting line-3
Roll Line-1
welding Line-1
Assembly line-1 12/10/2016
Akan dilakukan meeting dengan Hanazono mengenai permasalahan DHJ
Grating tebal 3 mm menjadi 5 mm ada tambahan Kerja
Material datang Checker Plate 6 mm 11/9/2016
Rajanto untuk koordinasi pengiriman tgl 10/11/2016 malam
Erection Drawing
Packing
Mill sheet
Curva S 11/9/2018
karena over weight 80%
Design memasuki defleksi, material upgrade tebal dan lebar
Speck 6 mm dan 8 mm sudah ready 100 ton
Design belum approved
Schedule 60 hari setelah gambar di approved
Kontrak tanggal 1/11/2016 dikirim diwaskita 4/11/2016
Dokumen kirim ke eng
Scope of work
sondir
Engineering
Kerjaan Sipil
Struktur steel plate TSP 15 dan TSP 6, TSP 9 untuk 2 unit
Schedulle 4 bulan + 1 bulan = total 5 bulan
3 bangunan, 2 bangunan , 1 lagi dicalculation
Joint Survey dengan Hanggar semarang 11/10/2016
Rencana Pabrikasi 12/1/2016
Rencana erection 1/1/2012
Total 900 ton
Produksi
erection
Outstanding anchor 11/9/2016
Hoist capasitas 20 ton ; gambar turun 9/11/2016 ; untuk 2 unit
Cutting mulai hari ini 11/9/2016
Roda ada 4 stock, tetapi tetap diorder 8
Pabrikasi hoist 11/24/2016
Diputuskan hari ini untuk subcontractor
Selesai 11/30/2016
258 Tower Sutet, 150 KV; 270 KV ; 500 KV
Schedulenya 1 tahun
Estimasi PO 1/1/2017
Trial 1 tower Type 150 kv AA+0 11/28/2016
Engineering 11/14/2016
Fabrikasi 11/21/2016
Material tidak diorder lagi, sudah ready stock 3 bulan lalu
Rencana 2 minggu
Progress 28%, Karena crane kato
Lokasi Kerja
Meeting dengan Pak Jaka 11/9/2016
Wire mesh ada
Keterangan
RFD
RFD
RFD
4 Type Star
10 module
RFD
ok
ok
RFD
eng 100%
66%
0%
30%
24%
7%
ok
ok
0%
100%
belum
28%
Project Cement Indonesia
No Engineering
Drawing Mto Spb
1
2
3
4
5
6
7
8
9
10
Fabrikasi
Material Cutting Bending Welding
Pembayaran
Pengiriman
Assembly Dp Termin-1
Termin-2
Agenda 17-11-2016
No Project SPK
1 Cement Indonesia
9 Elnusa
12 Hanggar Semarang
13 Karlita
14 Cilengsi
15 Trunajoyo
1928
29/09/2016
Tahap 2
17 Jembatan B 45 0355
Terima SPK 10/11/2016
Tonase (KG) 80,971.89
Keterangan Start End
Target
Joint Survey hari 11/11/2016
Routine meeting Jam 10.00
Gambar
Material
Fabrikasi
Drawing
SPB
PO - Kirim
Fabrikasi =) Cut and Dril
=) Asembly
=) Welding
=) Painting 20/11/16
=) Kirim 21/11/16
Drawing
MTO 11/11/2016
Material
Tripanajaya
11/7/2016 11/20/2016
Drawing
Material
18-11-2016
Drawing
MTO 16/11/2016
List 16/11/2016
Material
Fabrikasi =) Cut and Dril
=) Asembly
=) Welding
11/9/2016
Rajanto untuk koordinasi pengiriman tgl 10/11/2016 malam
Erection Drawing
Packing
Mill sheet
Curva S 11/9/2018
karena over weight 80%
Design memasuki defleksi, material upgrade tebal dan lebar
Speck 6 mm dan 8 mm sudah ready 100 ton
Design belum approved
Schedule 60 hari setelah gambar di approved
Kontrak tanggal 1/11/2016 dikirim diwaskita 4/11/2016
Dokumen kirim ke eng
Scope of work
sondir
Engineering
Kerjaan Sipil
Struktur steel plate TSP 15 dan TSP 6, TSP 9 untuk 2 unit
Schedulle 4 bulan + 1 bulan = total 5 bulan
3 bangunan, 2 bangunan , 1 lagi dicalculation
Joint Survey dengan Hanggar semarang 11/10/2016
Rencana Pabrikasi 12/1/2016
Rencana erection 1/1/2012
Total 900 ton
Produksi
erection
Outstanding anchor 11/9/2016
Hoist capasitas 20 ton ; gambar turun 9/11/2016 ; untuk 2 unit
Cutting mulai hari ini 11/9/2016
Roda ada 4 stock, tetapi tetap diorder 8
Pabrikasi hoist 11/24/2016
Diputuskan hari ini untuk subcontractor
Selesai 11/30/2016
258 Tower Sutet, 150 KV; 270 KV ; 500 KV
Schedulenya 1 tahun
Estimasi PO 1/1/2017
Trial 1 tower Type 150 kv AA+0 11/28/2016
Engineering 11/14/2016
Fabrikasi 11/21/2016
Material tidak diorder lagi, sudah ready stock 3 bulan lalu
Rencana 2 minggu 29/09/2016
Drawing 24/10/2016
SPB
Fabrikasi =) Welding, painting 14/10/2016
=) Kirim 10/10/2016
Surat Jalan 10/10/2016
Install 18/10/2016
Progress 26/11/2016
Drawing 07/11/2016
SPB 28/10/2016
Fabrikasi =) Assembly 28/10/2016
=) Welding, painting 05/11/2016
=) Kirim 08/11/2016
Surat Jalan 08/11/2016
Install
Progress
PT. Cipta Konstruksi 11/11/2016 27/11/2016
Drawing
MTO 16/11/16
Material
Closed
Closed
Closed
Closed
Galvanise finish
RFD
RFD
RFD
4 Type Star
10 module
RFD
ok
ok
RFD
141122-AYFE001
Pipe 87.7% , Flange 100%
Finish with note delay plus minus 25 days
assembly list Part 20%
62%
Target next week partial delivery
ok
ok
0%
blm ada feed back
SPH Insulator
SPH Konduktor
SPH Civil
100%
belum
Using stock
No SPB 142651
Next
Next
by customer 13/11/16 release to produksi WS Setu 14/11/16 (Assembly)
Loose part (belum release) DELAY 2 Hari
Finish
WF 198x99
RB D36, L=6000
PL 21 SM490YV
PL 38
No SPB 142686 16/11/16
No SPB 142692 belum sign pak arief
BELUM TURUN MEMO PRODUKSI
Column1
O/S
SPEED UP FABRIKASI PROSES WELDED
1/16 (Assembly)