Professional Documents
Culture Documents
Task Book - Operator1 - LNG PNG
Task Book - Operator1 - LNG PNG
Re-qualify Date
Date Complete
Competency Gap
Learning Method
Due Date
(Initial)
Code
MRC (Y/N)
Criticality
(Y/N)
ALL FOUNDATION
TRAINING CONDUCTED
1 2 3 4 5 6
Date Complete
Locations to OJT
Learning Method
Knowledge /
Task List Practical (K Gap Closure Plan
Importance
/ P)
(A,B,C,D)
Safety General
5 Be fully conversant with the location of all ESD switches P LNG Process H A
6 Operate eye wash station and emergency shower P LNG Process H A
7 Gas Detector Training (Personal H2S) P LNG Process M A
8 Gas Detector Training (LEL, O2, H2S) P LNG Process M A
2 of 19
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP Version 08/24/2017
Date Complete
Locations to OJT
Learning Method
Knowledge /
Task List Practical (K Gap Closure Plan
Importance
/ P)
(A,B,C,D)
14 Risk Assesment K LNG Process M A
16 Be able to use a Self Contained Breathing Apparatus (SCBA) P LNG Process M A/C
1
Familiarized special Badge, Clean shaven and LNG Access Control P LNG Process L A
3 Explain the purpose of the Fire & Gas system LNG Process
4
Explain the function and location of the following Fire & Gas equipment P LNG Process M
6 Be able to use a Self Contained Breathing Apparatus (SCBA) P LNG Process M A/C
7 Operate eye wash station and emergency shower P LNG Process M
8 Know to Implemented LOTO (lock Out, Tag Out) P LNG Process M
9 Implemented wearing PPE ( Personal Protective Equipment) P LNG Process H
10 Performed and Implemented SWP and JSA P LNG Process L
1 Prepare a sketch of the Sea Water , Cooling Water , Portable water supply
System and operating Parameter. P LNG Process M A
2 Prepare a sketch of the Utility Instrument Air , Plant Air System P LNG Process M A
3 Prepare a sketch and Explain of underground pipelines P LNG Process
4 Prepare a sketch of the Feed Gas flows to Treating Units P LNG Process M A
3 of 19
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP Version 08/24/2017
Date Complete
Locations to OJT
Learning Method
Knowledge /
Task List Practical (K Gap Closure Plan
Importance
/ P)
(A,B,C,D)
5 Prepare a sketch of the Flare system, identify main components and their LNG Process
operating parameters P H
6 Prepare a sketch of the Drain systems showing flow. P LNG Process H
7 LNG Process
Explain the function and how to operate of the SDV and BDV P H
Prepare a sketch of the Drain systems showing flow, instrumentation and P LNG Process
8 set points. HM A
P LNG Process
9 Prepare a sketch of the Steam trap line , identify if not working properly M
10 Take Condensate sample, Explain procedure, operating parameters and P LNG Process
location of sample points M
11 Sketch a pig reciever and explain its purpose P LNG Process M
B TREATING UNIT
1 Prepare a sketch of Flow Diagram Unit, including Process Variable Control ( P LNG Process M
Pressure, Level ,Flow, Temperature)
2 Explain how to implemented , excecution the bellow tasks and record the P LNG Process M
performances :
- Adsorption Mercury (Hg) K/P LNG Process M
4 of 19
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP Version 08/24/2017
Date Complete
Locations to OJT
Learning Method
Knowledge /
Task List Practical (K Gap Closure Plan
Importance
/ P)
(A,B,C,D)
- Absorption CO2 & H2S and Regeneration K/P LNG Process M A
- Chemical Reaction of Carbonate and DEA solution K/P LNG Process M A
- Equipment function K/P LNG Process M
- Prepare the Pumps, Fin Fan, Cooler , Reboiler , Filters for P LNG Process
Maintenance L A
P LNG Process M
- Start or put on service the above equipment after Maintenance
3 LNG Process
Following Daily Operator activities and record as working paper. P L
4 Explain steps of ESD. P LNG Process M
5 LNG Process L
Perform and explain what are the routine checks in the area plant. P
LNG Process
6 Explain how to implemented , Shut Down Unit as procedure. K/P M
7 LNG Process
Explain how to implemented ,Start up after Maintenace as procedure. P M
8 LNG Process
Take carbonate samples, Explain procedure and location of sample P M
11 Take DEA sample. Explain procedure and location of sample P LNG Process
M
12 What is the maximum allowable parts per million (PPM) of moisture and K/P LNG Process M
CO2 and H2S out of treating unit, what happens if that limit is exceeded
13 What is the maximum allowable parts per million (PPM) CO2, H2S and K/P LNG Process
Moisture the gas out of treating unit. What happens if that limit is
exceeded M
14 Trauble Shooting for all above items K/P LNG Process M
LNG Process
5 of 19
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP Version 08/24/2017
Date Complete
Locations to OJT
Learning Method
Knowledge /
Task List Practical (K Gap Closure Plan
Importance
/ P)
(A,B,C,D)
Dehydration System LNG Process
Prepare a sketch of Flow Diagram, including Process Variable Control P LNG Process M
1 ( Pressure, Level ,Flow, Temperature)
K LNG Process L A
b) Reactivation cycle ; Heating, Cooling, Depressurising and Repressurising
c) Perform to Nitrogen purge or derime the system P LNG Process L A
d) Familiar with equipment design for operating system P LNG Process L A
Scrubbing System
1 Prepare a sketch of Flow Diagram, including Process Variable Control P LNG Process L A
( Pressure, Level ,Flow, Temperature)
6 Perform to isolate steam and drain steam cond. of Scrub. Tower Reboiler P LNG Process L A
7 Maintain the operating condition ; temp, pressure, level & flow P LNG Process L A
8 Capable of performing trouble shooting P LNG Process L A
1 Prepare a sketch of Flow Diagram Unit, including Process Variable Control K/P LNG Process M
( Pressure, Level ,Flow, Temperature)
2 Explain location and how to implemented , excecution the bellow tasks LNG Process
then follow to record the performances : K/P M
6 of 19
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP Version 08/24/2017
Date Complete
Locations to OJT
Learning Method
Knowledge /
Task List Practical (K Gap Closure Plan
Importance
/ P)
(A,B,C,D)
- Reaction furnace Process theory K/P SRU Plant M
- Back wash strainers of sea water exchangers K/P LNG Process M
- Utilities Chemical injections for HRSG F LNG Process L
1 P LNG Process M A
Sketch the MCR Compressor package and identify the major components
2 Perform Units routine check and log sheet. P LNG Process M A
3 Explain how to Start up and Shut down Unit as procedure P LNG Process M A
4 P LNG Process L A
What is the maximum allowable parts per million of moisture when unit
ready to online and what happens if that limit is exceeded
5 Explain how to implemented , excecution the bellow tasks and record the P LNG Process L A
performances :
7 of 19
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP Version 08/24/2017
Date Complete
Locations to OJT
Learning Method
Knowledge /
Task List Practical (K Gap Closure Plan
Importance
/ P)
(A,B,C,D)
1 LNG Process
Prepare a sketch of Flow Diagram of MCR System, including Process
Variable Control ( Pressure, Level ,Flow, Temperature) K/P
2 Explain location and how to implemented , excecution the bellow tasks LNG Process
then follow to record the performances : K/P
- Turbine Air Inlet Filter K/P LNG Process
- Starting gas components K/P LNG Process
- Axial Compressor K/P LNG Process
- Combustion Chamber K/P LNG Process
LNG Process
- Sealing system P
LNG Process
- Inlet guide vane P
LNG Process
- Start up and Shut down Dry Gas Seal P
LNG Process
- Start up and Shut down of HRSG P
LNG Process
- Start up/ Shut down air blower P
LNG Process
- To adjust deverter and dumper, when the mechine stop P
LNG Process
- To adjust turbine speed for balancing the product, if needed P
LNG Process
- Compressor anti surge system K/P
8 of 19
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP Version 08/24/2017
Date Complete
Locations to OJT
Learning Method
Knowledge /
Task List Practical (K Gap Closure Plan
Importance
/ P)
(A,B,C,D)
M A
M A
M A
M A
L A
9 of 19
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP Version 08/24/2017
Date Complete
Locations to OJT
Learning Method
Knowledge /
Task List Practical (K Gap Closure Plan
Importance
/ P)
(A,B,C,D)
L A
M B
10 of 19
Verified Competent
7
Verified Competent
8
Verified Competent
9
11 of 19
Version 08/24/2017
Verified Competent
(Initial) and Work
Location
Verified Competent
(Initial) and Work
Location
Verified Competent
(Initial) and Work
Location
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP
12 of 19
Version 08/24/2017
Verified Competent
(Initial) and Work
Location
Verified Competent
(Initial) and Work
Location
Verified Competent
(Initial) and Work
Location
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP
13 of 19
Version 08/24/2017
Verified Competent
(Initial) and Work
Location
Verified Competent
(Initial) and Work
Location
Verified Competent
(Initial) and Work
Location
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP
14 of 19
Version 08/24/2017
Verified Competent
(Initial) and Work
Location
Verified Competent
(Initial) and Work
Location
Verified Competent
(Initial) and Work
Location
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP
15 of 19
Version 08/24/2017
Verified Competent
(Initial) and Work
Location
Verified Competent
(Initial) and Work
Location
Verified Competent
(Initial) and Work
Location
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP
16 of 19
Version 08/24/2017
Verified Competent
(Initial) and Work
Location
Verified Competent
(Initial) and Work
Location
Verified Competent
(Initial) and Work
Location
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP
17 of 19
Version 08/24/2017
Verified Competent
(Initial) and Work
Location
Verified Competent
(Initial) and Work
Location
Verified Competent
(Initial) and Work
Location
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP
18 of 19
Version 08/24/2017
Verified Competent
(Initial) and Work
Location
Verified Competent
(Initial) and Work
Location
Verified Competent
(Initial) and Work
Location
LNG PROCESS FOR PNG-LNG OPERATOR TRAINING ROADMAP
19 of 19
Version 08/24/2017