GUIDELINES IN THE
PROFESSIONAL ELECTRICAL
ENGINEERING LICENSURE
EXAMINATIONS
2015 IIEE National Mid-Year Convention
May 22-23, 2015
SM Lanang, Davao City
OUTLINE
Philippine Electrical Code
Professional Regulatory Board of Electrical
Engineering
Field of Practice for Electrical Engineering
Qualifications of Applicants for Registration as
Professional Electrical Engineer.
Rule 14. Requirements for Registration as
Professional Electrical Engineer
GRID/DISTRIBUTION
DEVELOPMENT PLANNING
CRITERIA
R. A. 7920
New Electrical Engineering Law
Repeal RA 184
An Act For, A More Responsive and
Comprehensive Regulation For the
Practice, Licensing, and Registration of
Electrical Engineers and Electricians.
R. A. 7920
Sec. 4 Powers and Duties of the Board
The Board shall exercise executive
/administrative or quasi-legislative
(rule-making) or quasi-judicial
(investigative) powers in carrying
out the provisions of this Act.
Licensing
Definition a permission granted by competent authority
to engage in a practice of profession or business or in an
activity subject to certain rules and regulations.
A PEE who designed, signed, and sealed an electrical plans
means he/she guaranteed the safety of the electrical
plans for 15 years in accordance to Civil Code.
PEE, REE or RME who signed as in-charge of installations
also guaranteed the safety of the electrical installations for
15 years.
You can only guaranteed the safety of your electrical
designs/installations if you are well-versed in the Philippine
Electrical Code.
LICENSING is a PRIVELEGE
from a Governing Body NOT A RIGHT!!
Flowchart
INTERVIEW (40%)
Punctuality at appointed time - 10%
Grasp of Subject Matter - 40%
Accuracy in answering technical questions - 30%
Composure and confidence - 10%
Verbal facility - 10%
INTERVIEW (40%)
Punctuality at appointed time - 10%
Grasp of Subject Matter - 40%
Accuracy in answering technical questions - 30%
Composure and confidence - 10%
Verbal facility - 10%
Q&A
Send your questions/inquiries at these e-mail
addresses:
jaimevmendoza@gmail.com
fvm.inc@gmail.com
GOOD Morning!
&
HYPERLINKS (FORMS)
PRC
Form 101
PEE AFFIDAVIT
CHAPTER 3 Methodology
3.1 FACTS Devices and Classification
3.1.1 Static VAR Compensator (SVC)
3.1.2 Thyristor Controlled Series Compensator
3.1.3 Static Synchronous Compensator
PRC Form
104
Curriculum
Vitae
Picture must
Be in coat &
Tie
PROFESSIONAL REGULATORY
BOARD OF ELECTRICAL ENGINEERING
2 May 2014
You may now file a formal application with the Professional Regulation Commission
and proceed with the writing of your technical engineering report. Please submit five
(5) bookbound copies of the report in standard A4 size bond paper (substance 24
or 90 gsm) together with this reply letter, comprehensive bio-data, single-file PDF
copy of the full Technical Engineering Report (including all attachments) saved in
THREE (3) USB flash disks, and application forms (see attached). Use Verdana
Font and Font Size is 12, Line Spacing of 1.5 lines, and the following margins: Left
1.5 inches; Top, Bottom and Right 1 inch.
!
P.!PAREDES!ST.,!CORNER!N.!REYES!STREET,!SAMPALOC,!MANILA,!PHILIPPINES!
P.O.!BOX!2038,!MANILA!
Technical Report
Technical paper covering an evaluation, an
analysis or a critical discussion of an electrical
engineering project or subject, on one or several
technical aspects such as: design, construction,
installation, commissioning, testing, operation,
maintenance, repair, research and the like. The
technical paper shall be supported by engineering
principles and data. Published or unpublished
scientific paper or treatise on electrical engineering
theories and applications may be considered as
complying with the requirement;
SAMPLE TITLES
AN AUMANN-SHAPLEY APPROACH TO BILATERAL
TRANSMISSION LOSS PRICING IN A GROSS-POOL
ENERGY MARKET USING INDEPENDENT MARGINAL
LOSSES AND TRANSACTION LOSS FACTORS
UPGRADING OF THE PROTECTION SYSTEM OF THE
50 MVA 230 kV-69 kV POWER TRANSFORMER AT
LABO SUBSTATION, CAMARINES NORTE
RE-DESIGN OF SYNCHRONIZING SWITCHGEARS OF
DISCOVERY CENTRE BUILDINGS EXISTING
GENERATORS FOR 100% BACK-UP POWER
ELECTRICAL SYSTEM DESIGN OF A 45-STOREY
RESIDENTIAL BUILDING FOR ONE LEGASPI PLACE
PROJECT
DESIGN, INSTALLATION AND COMMISSIONING OF
THE 13.8 kV POWER CIRCUIT BREAKERS AT MOUNT
APO GEOTHERMAL POWER PLANT 1 & 2
BOARD OF ELECTRICAL ENGINEERING GUIDELINES IN THE PROFESSIONAL
ELECTRICAL ENGINEERING LICENSURE
PROFESSIONAL REGULATION COMMISSION
EXAMINATIONS
2015 IIEE National Mid-Year Convention May 22-23, 2015 SM Lanang, Davao City 50
APPLICATION FLOWCHART
START
VALIDATE/VERIFY
CREDENTIALS
DISCUSSIONS OF
PROPOSED TOPIC
PRESENT
APPROVE N ALTERNATE
TOPIC? ENGINEERING
REPORT
Y
BOARD OF ELECTRICAL ENGINEERING
1 GUIDELINES IN THE PROFESSIONAL
ELECTRICAL ENGINEERING LICENSURE
PROFESSIONAL REGULATION COMMISSION
EXAMINATIONS
2015 IIEE National Mid-Year Convention May 22-23, 2015 SM Lanang, Davao City 52
APPLICATION FLOWCHART
1
PREPARE TECHNICAL
ENGINEERING REPORT
AND SUBMIT WITHIN SIX
(6) MONTHS
SUBMIT APPLICATION TO
PRC TOGETHER WITH
ENGINEERING REPORT ORAL EXAMINATION
COMPLETE WITH ALL