PROPOSAL

RAB JALAN SALAK

HARGA
NO JENIS PEKERJAAN VOLUME SAT SATUAN

I PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank 3,400.00 M' 57,963.00
3 Bongkar Saluran Beton 646.80 M3 646,650.00
4 Pelaporan dan Dokumentasi Foto 1.00 Ls 5,000,000.00
SUB JUMLAH
II PEKERJAAN TANAH
1 Galian Tanah Saluran 4,760.00 M3 87,300.00
3 Urugan tanah Kembali Bekas Galian 2,380.00 M3 23,666.67
4 Urugan Pasir 680.00 M3 149,360.00
SUB JUMLAH
III PEKERJAAN BETON
1 Pengadaan Saluran Beton U 2.00x2.00 (pre cast) 3,352.00 Bh 8,500,000.00
2 Pengadaan Box Culvert 2.00x2.00 (pre cast) 48.00 Bh 23,100,000.00
3 Pasang Saluran Beton U 2.00x2.00 (pre cast) 3,352.00 Bh 200,000.00
4 Pasang Box Culvert 2.00x2.00 (pre cast) 48.00 Bh 300,000.00
SUB JUMLAH
JUMLAH
PPN 10%
TOTAL
DIBULATKAN
TERBILANG

TIGA PULUH EMPAT MILYAR ENAM RATUS DUA PULUH TUJUH JUTA TIGA RATUS TIGA PULUH TIGA RIBU RUPIA
JUMLAH HARGA

197,074,200.00
418,253,220.00
5,000,000.00
620,327,420.00

415,548,000.00
56,326,674.60
101,564,800.00
573,439,474.60

28,492,000,000.00
1,108,800,000.00
670,400,000.00
14,400,000.00
30,285,600,000.00
31,479,366,894.60
3,147,936,689.46
34,627,303,584.06
34,627,303,000.00

A PULUH TIGA RIBU RUPIAH


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN PERSIAPAN
A.004 Mengerjakan 1 m' pengukuran dan pemasangan bouwplank
Bahan
Kayu Meranti 5/7 0.0120 m 1,870,000.00 22,440.00
Paku Biasa 2" - 5" 0.0200 kg 21,650.00 433.00
Kayu Papan Meranti (2 x 20 x 400) 0.0070 m 1,870,000.00 13,090.00
Jumlah (1) 35,963.00
Tenaga
Pekerja 0.1000 OH 90,000.00 9,000.00
Tukang Kayu 0.1000 OH 110,000.00 11,000.00
Kepala Tukang 0.0100 OH 130,000.00 1,300.00
Mandor 0.0050 OH 140,000.00 700.00
Jumlah (2) 22,000.00
Jumlah (1) + (2) 57,963.00
A.011 Membongkar 1 m beton bertulang
Pekerja 6.6670 OH 90,000.00 600,030.00
Mandor 0.3330 OH 140,000.00 46,620.00
Jumlah 646,650.00
PEKERJAAN TANAH
B.002 Menggali 1 m tanah biasa sedalam 2 meter
Tenaga
Pekerja 0.9000 OH 90,000.00 81,000.00
Mandor 0.0450 OH 140,000.00 6,300.00
Jumlah 87,300.00
B.010 Mengurug kembali 1 m galian
Tenaga
Pekerja 0.2500 OH 90,000.00 22,500.00
Mandor 0.0083 OH 140,000.00 1,166.67
Jumlah 23,666.67
B.012 Mengurug 1 m pasir urug
Bahan
Pasir Urug 1.2000 m 100,800.00 120,960.00
Jumlah (1) 120,960.00
Tenaga
Pekerja 0.3000 OH 90,000.00 27,000.00
Mandor 0.0100 OH 140,000.00 1,400.00
Jumlah (2) 28,400.00
Jumlah (1) + (2) 149,360.00