[kV]_1

POLE TOWER
Conductor [mm2] Conductor [$/km]

S/C

D/C

LATTICE TOWER
Conductor [mm2] Conductor [$/km]

S/C

D/C

Data acquisition for cost calculation


1) Material cost per conductor [$/km]
Conductor
2) Installation [$/km]
Structures (suspension or retention tower, lattice or pole). Four 3) Material cost [$/km]
combinations. 4) Installation [$/km]
5) Material cost[$/km]
Foundations (per structure). Four combinations.
6) Installation [$/km]
7) ROW and access (clearance), shield
Civil works (man labor) wires installation [$/km]

8) Shield wire, insulators, grounding,


Others (Modular) conductor & shield wire hardware,
spacers and accessories[$/km]

9) Engineering (design, topography,


Others (Modular and not modular) survey, environmental studies),
administration & supervision [$]

Costs breakdown (or data acquisition)


Conductor 1)
Structures 2)
Foundations 3)
Man labor 2) + 4) + 6)
Others (Modular) 8)
Others (Not modular) 9)
[kV]_1

POLE TOWER
Structures [$/km] Foundations [$/km] Man labor[$/km] Others [$/km]

LATTICE TOWER
Structures [$/km] Foundations [$/km] Man labor[$/km] Others [$/km]
Others [$] (not modular)

others [$] (not modular)


115 [kV]

POLE TOWER
Conductor kcmil Conductor Structures Foundations
605 37970505 363763520.024272 76720907.600857
S/C

605 37970505 388036520.024272 97228763.99054


D/C

Take as towers civil work

LATTICE TOWER
Conductor kcmil Conductor Structures Foundations
605 39050235 85169179.7469201 47793313.6372736
S/C

605 39050235 117075679.477659 61278925.2595554


D/C

Take as towers civil work

Data

DESCRIPCIN UNIDAD
CONSTRUCTIVA
Res. 024 de 2016 ESTRUCTURAS LINEAS
UC AREAS DESNUDAS DDP MONTAJE OBRA CIVIL
N4L64 Poste metlico de 27 m lnea 51855840.0080905 1325373.10030011 5310517.957875
N4L65 Poste metlico de 27 m lnea 104098000 4660823.82472155 30394676.863616
N4L66 Poste metlico de 27 m lnea 56226840.0080905 4635595.3636 7080690.6105
N4L67 Poste metlico de 27 m lnea 109678000 6044063.5890431 37993346.07952
N4L68 Torre metlica lnea area de 20429589.8734601 12405962.0230358 9223699.27778055
N4L69 Torre metlica lnea area de 44310000 15695046.125129 29345915.0817125
N4L70 Torre metlica lnea area de 28836839.7388296 16767619.9981811 12298265.7037074
N4L71 Torre metlica lnea area de 59402000 20128066.5832113 36682393.8521406

CONSTRUCTIVA
Res. 024 de 2016 CONDUCTORES LINEAS
UC AREAS CONDUCTOR ACSR DDP MONTAJE OBRA CIVIL
N4L84 Conductor ACSR 605 kcmil 35991000 15631325.5536 0

DESCRIPCIN UNIDAD
Res. 024 de 2016 CONSTRUCTIVA
UC CABLE DE GUARDA DDP MONTAJE OBRA CIVIL
N4L89 Cable de guarda 2356000 3001113.26 0
DESCRIPCIN UNIDAD
Res. 024 de 2016 CONSTRUCTIVA
UC PUESTA A TIERRA DDP MONTAJE OBRA CIVIL
N4L91 Sistema de puesta a tierra di 735637.958807242 169751.9338 0
N4L92 Sistema de puesta a tierra di 243813.16657437 45266.21 0

DESCRIPCIN UNIDAD
Res. 024 de 2016 CONSTRUCTIVA
UC CABLE DE FIBRA PTICA DDP MONTAJE OBRA CIVIL
N4L93 Cable de fibra ptica All-D 18635537.2179478 2670112.564 0

Description of quantities

Cdigo Descripcin Unidad Cantidades

LNEA URBANA - P km 1
N4L66 Poste metlico de und 4
N4L67 Poste metlico de und 2
N4L84 Conductor ACSR 60 km 6.33
N4L89 Cable de guarda km 0
N4L92 Sistema de puesta und 6
N4L93 Cable de fibra pt km 1.05

LNEA URBANA - P km 1
N4L64 Poste metlico de und 4
N4L65 Poste metlico de 2 und 2
N4L84 Conductor ACSR 60 km 3.17
N4L89 Cable de guarda km 0
N4L92 Sistema de puesta und 6
N4L93 Cable de fibra pt km 1.05

LNEA RURAL - T km 1
N4L70 Torre metlica lne und 3
N4L71 Torre metlica lne und 1
N4L84 Conductor ACSR 60 km 6.51
N4L89 Cable de guarda km 0
N4L91 Sistema de puesta a und 4
N4L93 Cable de fibra pt km 1.08

LNEA RURAL - To km 1
N4L68 Torre metlica lne und 3
N4L69 Torre metlica lne und 1
N4L84 Conductor ACSR 60 km 3.26
N4L89 Cable de guarda km 0
N4L91 Sistema de puesta a und 4
N4L93 Cable de fibra pt km 1.08

NOTA:
1. Las cantidades estimadas en sta hoja tienen presente los siguientes criterios:
- Diseo y construccin de Lneas de transmisin area nuevas a 115kV.
- Las estructuras de apoyo deben ser metlicas, completamente auto soportadas,
- El clculo de la longitud del cable conductor, se realiz dependiendo del tipo de c
- En las estructuras en poste y torre metlica, se instalar un solo cable de guarda
- En el rea urbana se emplearn postes normalizados metlicos completamente a
- Para las zonas rurales se utilizarn torres metlicas auto soportadas.
Man labor Others (modular) Others (not modular)
65846127.7796875 20786379.9117171 11785804.3000201

128016419.475374 20786379.9117171 11785804.3000201

owers civil work INCOMPLETE DATA (insulators, accesories, etc)

Man labor Others (modular) Others (not modular)


94936313.5896686 22240116.3857156 11743771.1828199

158972614.675009 22240116.3857156 11743771.1828199

owers civil work INCOMPLETE DATA (insulators, accesories, etc)

ADMINISTRACIN COSTOS VALOR


INGENIERIA INTERVENTORA EJECUCIN INSPECCION FINANCIEROS TOTAL UC
5892902.15001003 0 0 0 0 64384633.2162757
5892902.15001003 0 0 0 0 145046402.838348
5892902.15001003 0 0 0 0 73836028.1322006
5892902.15001003 0 0 0 0 159608311.818573
5871885.59140997 0 0 0 0 47931136.7656864
5871885.59140997 0 0 0 0 95222846.7982514
5871885.59140997 0 0 0 0 63774611.032128
5871885.59140997 0 0 0 0 122084346.026762

ADMINISTRACIN COSTOS VALOR


INGENIERIA INTERVENTORA EJECUCIN INSPECCION FINANCIEROS TOTAL UC
0 0 0 0 0 51622325.5536

ADMINISTRACIN COSTOS VALOR


INGENIERIA INTERVENTORA EJECUCIN INSPECCION FINANCIEROS TOTAL UC
0 0 0 0 0 5357113.26
ADMINISTRACIN COSTOS VALOR
INGENIERIA INTERVENTORA EJECUCIN INSPECCION FINANCIEROS TOTAL UC
0 0 0 0 0 905389.892607242
0 0 0 0 0 289079.37657437

ADMINISTRACIN COSTOS VALOR


INGENIERIA INTERVENTORA EJECUCIN INSPECCION FINANCIEROS TOTAL UC
0 0 0 0 0 21305649.7819478

los siguientes criterios:


nuevas a 115kV.
amente auto soportadas, en forma de Poste o Torre de Celosa.
dependiendo del tipo de circuito sumando cada una de sus fases.
un solo cable de guarda tipo OPGW 24/ITU-T G.
metlicos completamente auto soportados.
o soportadas.
Costo de conductores $/km
Costo de estructuras $/unidad
Project [MVA] 200
Length [km] 10
Voltage [kV] 115
I[kA] 1.00408742
Subcond [kcmil] 605
Ampacity approx. [A] 706
Subconductors 1
Tower type Lattice
Circuits (1 or 2) 2
Phases 3

COL$ EUR$ % of total


Items kEUR$/km
(millones) (millones) investment
Conductor 2343.01 0.67 67.49 40.90
Structures 1170.76 0.34 33.72 20.44
Foundations 612.79 0.18 17.65 10.70
Man labor 1589.73 0.46 45.79 27.75
Others 11.74 0.00 0.34 0.21
Sub-total modular 5716.29 1.65 164.66 99.79
Others (not modular) 11.74 0.00 0.34 0.21
Sub-total not modular 11.74 0.00 0.34 0.21
Total 5728.03 1.65 165.00 100.00

TC - 13/07/2017 0.00028805 EUR$/COL$


dd/mm/yy