Inspection Request

Project Name: Myanmar Aquarium Project

IR Ref : IR /____004__________ To : AQUA

IR Date : 1.August.2017 Attn. : Timothy Graham

IR Subject : Block B , Ground floor, Exhibit 1.4 & 1.5


The following parts of works are ready
Date Inspection requested 1.August.2017
for inspection as indicated.
Time of Requested Inspection 2:00 pm

Location Description of the work to be inspected

Block B , Ground floor


1. Exhibit 1.4 & 1.5

In response to your request, the works were inspected on _____01/08/2017_______ at ____2.30_____ pm/am
(1) Approved without comment you may proceed.
(2) Approved to the comments below, re-inspection not required.
(3) Disapproved see comments below re-inspection required.

Comments

1. Failure to meet minimum 50mm minimum cover above reo bar, exhibit base slab.
2. AQUA recommends resetting reo bars to achieve minimum cover.
3. AQUA Inspected LSS Plumbing and confirm compliance with Tender Documents Plumbing Size &
Puddle flange. 2. AQUA was not provided a pressure test of plumbing to review.
4. 3. Note Plumbing inspected is as per Tender Design LSS Installer requirements may differ from
Tender Design.
5. 4. AQUA to inspect post casting and prior to waterproofing to ensure compliance.

Sign as issued (CONTRACTOR) Sign as received Consultant

Name: Aung Thu Win Name:


Timothy Graham__

Position: SAE Position: ____Director__________

Date: 1. August .2017 Date: ___01/08/2017_

FO-OP-10 REV-00 Page: 1/1