This document appears to be estimating excavation costs for various types of soil and excavation methods. It provides unit rates for excavating ordinary soil to 3m depth using manual labor or mechanical excavation. For manual excavation the cost is Rs. 111.52 per cubic meter and for mechanical excavation using a hydraulic excavator the cost is Rs. 67.89 per cubic meter. Overheads and contractor's profits are included at 14% of labor and equipment costs. Notes provide additional guidance on potential costs for dewatering and shuttering/bracing.
Facilities Planning and Design An Introduction For Facility Planners, Facility Project Managers and Facility Managers, 2nd Ed (Jonathan Lian) (Z-Library)
This document appears to be estimating excavation costs for various types of soil and excavation methods. It provides unit rates for excavating ordinary soil to 3m depth using manual labor or mechanical excavation. For manual excavation the cost is Rs. 111.52 per cubic meter and for mechanical excavation using a hydraulic excavator the cost is Rs. 67.89 per cubic meter. Overheads and contractor's profits are included at 14% of labor and equipment costs. Notes provide additional guidance on potential costs for dewatering and shuttering/bracing.
This document appears to be estimating excavation costs for various types of soil and excavation methods. It provides unit rates for excavating ordinary soil to 3m depth using manual labor or mechanical excavation. For manual excavation the cost is Rs. 111.52 per cubic meter and for mechanical excavation using a hydraulic excavator the cost is Rs. 67.89 per cubic meter. Overheads and contractor's profits are included at 14% of labor and equipment costs. Notes provide additional guidance on potential costs for dewatering and shuttering/bracing.
This document appears to be estimating excavation costs for various types of soil and excavation methods. It provides unit rates for excavating ordinary soil to 3m depth using manual labor or mechanical excavation. For manual excavation the cost is Rs. 111.52 per cubic meter and for mechanical excavation using a hydraulic excavator the cost is Rs. 67.89 per cubic meter. Overheads and contractor's profits are included at 14% of labor and equipment costs. Notes provide additional guidance on potential costs for dewatering and shuttering/bracing.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side
Note : Classifications of Earth Work Specification are as
per 302.2.1(a) of MORD and 301.2.1 of MORT&H (I) Ordinary soil (A) Manual Means (i) Upto 3 m depth Unit = cum Taking output = 10 cum a)Labour Mate day - Mazdoor (Unskilled) day 3.64 No. 268.75 978.25 b&c) Overheads & Contractors Profit 14.00% 978.25 136.96 Cost for 10 cum = a+b+c 1115.21 Rate per cum = (a+b+c)/10 111.52 Note : 1. Cost of dewatering may be added, where required, up to 5 per cent of labour cost. Assessment for dewatering shall be made as per site conditions. 2. The cost of shoring and shuttering, where needed, may be added on cost of excavation for open foundation. 3. The excavated earth if found suitable, can be used partly for backfilling in trenches & partly for road work. Hence cost of disposal has not been added except for marshy soil. This note is common to all cases of item 11.1 excluding 11.1 V (B) Mechanical Means i Upto 3 m depth Unit = cum Taking output = 240 cum a)Labour Mate day - Mazdoor (Unskilled) day 8.32 268.75 2236.00 b) Machinery Hydraulic Excavator 1 cum bucket capacity hour 6.00 2009.50 12057.00 c&d) Overheads & Contractors Profit 14.00% 14293.00 2001.02 Cost for 240 cum = a+b+c+d 16294.02 Rate per cum = (a+b+c+d)/240 67.89 Note : 1. Cost of dewatering upto 5% of a+b may be added, where required, up to 10 per cent of labour cost. Assessment for dewatering shall be made as per site conditions.
Facilities Planning and Design An Introduction For Facility Planners, Facility Project Managers and Facility Managers, 2nd Ed (Jonathan Lian) (Z-Library)