Contractor Owner

Material Approval Request


From: To:
Ramsis Engineering Co. WLL Bapco MAR Ref: 46

Project Title: Date: 13/04/2017


AB PIPELINE PROJECT - ONSHORE BAHRAIN INSTALLATIONS

Owner: Bahrain Petroleum Company B.S.C. (Closed) Ramsis Ref. No : MAR NO.: 046

We request approval of the following material to be used in the above works

X Inst &
Mech Civil/Stru Elect Others
Comm
1. Material IMG Wrapping Material
2. Manufactuer IMG Composites Ltd
3. Specification Reference ISO/TS/24817
4. Drawing Reference
5. Proposed Location AB Pipeline site in Bahrain
7. Estimated Delivery Period 2 Weeks
8. Estimated Date Required at Site Partial delivery (26th April 2017) , Balance delivery (7th May 2017)
Catalogue Material Submittal
Specifications Others/References X
10. Enclosures BOQ Unpriced P.O Copy
Material Test Certificate
Data Sheets X Drawings
Contracts Comments: Attached below documents:
1- ARAMCO Approval: (Pages 2-4)
2- Approved Vendors: (Page 5)
3- Products' Data Sheet: A- CompoSol Knitted Glass (Page 6) B- CompoSol C.R.C (Page 7)
C- Composol R.E.P (Page 8)
Signature: Date: 13th April 2017

Owner Comments:

Approved Approved with comments Revise & Resubmit Rejected


Signature: Date: