E/pophale sir/corrigendum and addendum tender no.

Corrigendum
Name :- Design, Supply, Install and Maintain 1000 feeders and Feeder based SCADA system on existing LED street light fitti
Tender no. 5/2017

Sr.No. Bidder's Queries

1) Tata projects Ltd.


1.1 The Bidder should have been operating and maintaining
a single SCADA project of minimum 5 crores
successfully in last the past 3 (years) years for energy
sector The completion report and performance
certificate shall be submitted.
Clarifications from Tata projects Ltd.
TATA Projects has so far only implemented/ installed
SCADA system across Power plant. There was no O&M
phase in the same. However the O&M phase is a part of
a currently undergoing project. Request you to please
consider Implementation/installation of SCADA system
experience as a part of your eligibility criteria.

1.2 Approximate per Feeder Load for Designing of SCADA


Panel.

1.3 SCADA Panel should be Single Phase or Three Phase?

1.4 Please share PMC Survey report of Each Feeder along


with Location of Each Feeder
1.5 On Page No. 21, of Tender Document, It is mentioned,
it should be able to display the power failure details of
a particular switching point and the relevant luminaires,
as this tender is for SCADA Panels only, and it is not
possible to display power failure of relevant Luminaires,
Please clarify.

1.6 On Page No. 21, of Tender Document, It is mentioned,


it should be able to track the failure of lampsin a
particular switching point.As this tender is for SCADA
Panels only, and it is not possible to track individual
lamps failure,Please clarify.

1.7 On Page No. 22, of Tender Document, It is


mentionedNumber of operational &Non-operational
lights,as this tender is for SCADA Panels only, and it is
not possible to track Operational & Non Operational
Lamps,Please clarify.

1
E/pophale sir/corrigendum and addendum tender no.5

Sr.No. Bidder's Queries


1.8 On Page No. 22, of Tender Document, it is mentioned,
Feeder based SCADA system should have a self-healing
mechanism and in case of failure, Bidder to ensure
resumption of service within 24 hours, Please Clarify
Self-Healing Mechanism.

2
E/pophale sir/corrigendum and addendum tender no.5

Sr.No. Bidder's Queries


1.9 On Page No. 22 of Tender Document, it is
mentioned,System to report Jamming/ hacking
attempts and maintain status-quo in case of Jamming/
hacking attempts i.e. if lights are ON, they should
remain ON till the default OFF time recorded in the
system. In case lights are OFF at the time of Jamming
attempt/ hacking, lights should remain OFF till default
ON time recorded in the system. Please Clarify
Jamming/Hacking.

1.10 On Page 23, Point C, It is mentionedDimming


functionality, Please Clarify.

2) Philips lighting India Ltd.


2.1 Completing the survey of all the 1000 Feeder pillars,
installing & maintaining would not
be possible in given time period of 4 months. This
should be extended to at feast 6
months excluding monsoon period.

2.2 Eligibility criteria Since the project is of Street


lighting & LED street lights are to be
controlled, we request PMC to consider the experience
relevant to Street lighting only.
We would request you to consider OEMs for the same

2.3 Page No .12 e) we would provide the extra quantity


if required. However PMC has to
pay the bidder extra amount on the basis of unit rates
offered in the tender.

2.4 Kindly confirm the minimum & maximum lighting load


on each feeder pillar
2.5 Can we provide CRCA enclosure with epoxy polyester
powder coating suitable for
outdoor applications. P1 confirm

2.6 Kindly confirm the control methodology, individual light


point or group control
2.7 Feeder based SCADA system would provide critical
alarms & indication on the GUI in
case of failure, which would be rectified by us within
the stipulated time period

2.8 SIM Card Charges would have to be borne by PMC.


2.9 This FP will only have CCMS components only or will
also have LV S/G too?
2.10 Tender submission date needs to be extended by at
least 3-4 weeks as we have to do
relevant survey too, enabling us to bid for same.

3
E/pophale sir/corrigendum and addendum tender no.5

Sr.No. Bidder's Queries

3) Ravindra Lad
3.1 Please Mention PLC/SCADA Make.
3.2 Can you have Provide the Energy Meter Protocol the
Existing Feeder Installed Energy Meter? Please Confirm.

3.3 Do you have Dimming facility to existing Led Light?


Please verify the existing led light Driver is Dimmable or
Not.

3.4 Please Mention the FRS Material specification to


Feeder.

3.5 Please Mention the Generate the Report Format.


3.6 Please Verify What you want Exact you Have Mention
Automatic (With timer) Remote (With GPRS/GSM) and
Manual switching Option.

3.7 Please mention load to every feeder.


3.8 Can you have extended the time period to installation
Scada /PLCSystem?

4) Maven systems Pvt. Ltd.


4.1 Distributed load per feeder panel / light in KW
4.2 3 phase or single phase feeder input?
4.3 Server location
4.4 Dimming feature
4.5 Uninterrrupted operation,even during single phase
failure ( Individual Phase wise control )
4.6 Sim card charges
4.7 Energy meter

5 MONARCH TECHNOLOGIES(PUNE) PVT. LTD.


5.1 Detail Feeder list is required for all the locations along
with the distances between the locations.
5.2 Main SCADA location & distance.
5.3 Existing Energy meter total qty per location.
5.4 Energy meter should have the Modbus RS485
communication port available.
5.5 Connectivity between the location should be on FO or
Wireless??
5.6 If wireless then the line of sight to be confirmed.
5.7 Whether the LED illumination sensor to be consider?

5.8 If the sensor is already available then what will be input


received from the sensor eg. Digital Input or Analog
input with 4-20 mili amp signal ?

5.9 SLD of the electrical system is required to calculate the


I/O count of the PLC/SCADA system

4
E/pophale sir/corrigendum and addendum tender no.5

Sr.No. Bidder's Queries


5.10 Report formats if any specific format is to be followed.

5
E/pophale sir/corrigendum and addendum tender no.5

SCADA system on existing LED street light fittings.

Remarks

A) The Bidder should have been installing, operating


and maintaining a single SCADA project of
minimum 5 crores successfully in last 3 years for
energy sector. The completion report and performance
certificate shall be submitted.

As per tender conditions.

Three phase

Data can be shared to successful bidder.

As per tender conditions.

As per tender conditions.

As per tender conditions.

6
E/pophale sir/corrigendum and addendum tender no.5

Remarks
As per tender conditions.

7
E/pophale sir/corrigendum and addendum tender no.5

Remarks
As per tender conditions.

Dimming not required to Existing lights.

As per tender conditions.

As per tender conditions.

As per tender conditions.

As per survey to be carried out by bidder.

FRS or CRCA applicable.

Switching Feeder based

As per tender conditions.

As per tender conditions.


As per tender conditions.

As per tender conditions.

8
E/pophale sir/corrigendum and addendum tender no.5

Remarks

As per tender conditions.


As per tender conditions.

Please refer corrigendum no. 1.10

Please refer corrigendum no. 2.5

As per tender conditions.


As per tender conditions.

As per tender conditions.


As per tender conditions.

As per tender conditions.


Please refer corrigendum no. 1.3
As per tender conditions.
Please refer corrigendum no. 1.10
As per tender conditions.

As per tender conditions.


As per tender conditions.

As per tender conditions.

As per tender conditions.


As per tender conditions.
As per tender conditions.

As per tender conditions.

As per tender conditions.


As per tender conditions.

As per tender conditions.

As per tender conditions.

9
E/pophale sir/corrigendum and addendum tender no.5

Remarks
As per tender conditions.

10