REVIEW FOR APPROVAL DRAWING/ DOCUMENT
CCR OUT

DRAWING/ DOCUMENT NUMBER


DRAWING/ DOCUMENT TITLE
No. PLN REV. CONTRACTOR REV. STATUS
1. N4-01962 0 B STUDY OF UPS SYSTEM

Comm
Commt
t PLN COMMENTS CONTRACTORS RESPONSE
No.
No.

1. Please provide PLN Drawing No.

2. Complete the document with page numbers with format page x of x.

3. Please provide specification rated output power factor of UPS.

4. The UPS shall be furnish for vital Electrical System and Instrumentation &
Control System.

5. The incoming supplies for the UPS system shall be fed from two different
sources. It is refer to CDA TECH-E11 on Section E206 Uninterruptible AC
Power Supply " The normal supply shall be fed from GT Esential MCC
and ST Essential MCC, the back up supply for maintenance by pass also
shall be fed from GT Essential MCC and ST Essential MCC."

6. Please confirm the detail of "accessory station desk" load

Dated of issued : Reviewed by : Checked by :

1 of 1 PT PLN (Persero)Pusat Enjiniring Ketenagalistrikan


PLTGU Muara Karang (450 - 550 MW)