Professional Documents
Culture Documents
Inspection Request Schedule (1.9)
Inspection Request Schedule (1.9)
01.Sep 04:00 BR batch plant CE-C0983 R1 Loading Dry concrete for pipe support foundations of DS7. Witness
Sampling water that used for mix concrete of pipe support foundations
01.Sep 06:00 CPECC camp CE-C0984 R1 of DS7. Witness