BEAM LOADING:
BEAM DL LL BEAM DL LL
SECOND 75 PSF 105 PSF ROOF 15 PSF 8 PSF
B1 0.105 0.175
B1A - -
B1B 0.209 0.348
B2 0.209 0.350
B3 0.209 0.350
B4 0.105 0.175
B4A 0.209 0.350
B5 0.105 0.175
B6 0.209 0.350
B6A 0.578 0.963
B6B 0.105 0.175
B7 0.209 0.350
B8 0.209 0.350
B9 0.209 0.350
CB1 0.578 0.963
CB1A 0.105 0.175
RB1 - -
PROJECT : PROPOSED SCHOOL AND OFFICE BUILDING
LOCATION : KHANDAHAR AIR FIELD, AFGHANISTAN
DATE : NOVEMBER 20, 2009
ORIGINAL
- - - - -
TB1 35.73 - 35.73 TB1 35.73 -
- -
DL DL - -
- -
LL LL - -
1.57 1.57 1.57 1.57
EL/WL EL/WL
18.79 - 18.79 18.79 -
6.11 20.0310 10.0155 6.11 20.0310
PT & ADJACENT BEAMS RELEASED
SIMPLY SUPPORTED
- - - -
35.73 TB1 35.73 - 35.73
DL
-
LL
-
1.57 1.57
EL/WL
18.79 18.79 - 18.79
10.0155 7.00 22.9600 11.4800
Project : PROPOSED SCHOOL AND OFFICE BUILDING
Location : KHANDAHAR AIR FIELD, AFGHANISTAN
Owner : U.S. FORCES
Architect : BOYET DUMAGAY
SCHEDULE OF BEAMS
Fc' = 3,000 Psi Fy = 40,000 Psi Fvy = 33,000 Psi
BEAM WIDTH DEPTH SPAN 10mm STIRRUPS
LOCATION LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) ( 2-legs )
top 7 - 20 mm 2 - 20 mm 7 - 20 mm 10 @ 5 , 4 @ 10 Conventional
-
bottom 2 - 20 mm 4 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 20 mm 2 - 20 mm 4 - 20 mm 12 @ 5 , 4 @ 10 Post-Tension
2 - 16mm
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 3 - 16 mm 2 - 16 mm 3 - 16 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 16 mm 4 - 16 mm 2 - 16 mm rest @ 30 cm O.C. Beam
top 8 - 20 mm 2 - 20 mm 8 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 6 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 16 mm 2 - 16 mm 5 - 16 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 3 - 16 mm 3 - 16 mm 3 - 16 mm rest @ 30 cm O.C. Beam
top 5 - 20 mm 2 - 20 mm 5 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 4 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 2 - 20 mm 3 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 4 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 20 mm 2 - 20 mm 6 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 3 - 20 mm 8 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 3 - 25 mm 7 - 25 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 3 - 25 mm 8 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 7 - 20 mm 2 - 20 mm 7 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 3 - 20 mm 8 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 20 mm 2 - 20 mm 6 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 5 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 20 mm 2 - 20 mm 6 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 4 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 20 mm 2 - 20 mm 4 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 3 - 16 mm 2 - 16 mm 3 - 16 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 16 mm 4 - 16 mm 2 - 16 mm rest @ 30 cm O.C. Beam
top 6 - 20 mm 2 - 20 mm 6 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 6 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 16 mm 2 - 16 mm 4 - 16 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 3 - 16 mm 3 - 16 mm 3 - 16 mm rest @ 30 cm O.C. Beam
top 5 - 20 mm 2 - 20 mm 5 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 5 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 4 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 20 mm 2 - 20 mm 6 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 6 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 3 - 25 mm 7 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 7 - 20 mm 2 - 20 mm 7 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 6 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 20 mm 2 - 20 mm 4 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 20 mm 2 - 20 mm 5 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 16 mm 2 - 16 mm 4 - 16 mm 10 @ 5 , 4 @ 10 Conventional
-
bottom 2 - 16 mm 3 - 16 mm 2 - 16 mm rest @ 30 cm O.C. Beam
Page 4 of 16
Project : PROPOSED SCHOOL AND OFFICE BUILDING
Location : KHANDAHAR AIR FIELD, AFGHANISTAN
Owner : U.S. FORCES
Architect : BOYET DUMAGAY
SCHEDULE OF BEAMS
Fc' = 3,000 Psi Fy = 40,000 Psi Fvy = 33,000 Psi
BEAM WIDTH DEPTH SPAN 12mm STIRRUPS
: PROPOSED SCHOOL AND OFFICE
LEFT SUPPORT
BUILDING : MIDSPAN
PROPOSED SCHOOL AND OFFICE BUILDING STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) ( 2-legs )
top 9 - 25 mm 2 - 25 mm 9 - 25 mm 14 @ 5 , 6 @ 10 Conventional
TB1 35 65 10.00 2 - 16mm
bottom 8 - 25 mm 3 - 25 mm 8 - 25 mm rest @ 30 cm O.C. Beam
top 16 - 25 mm 2 - 25 mm 16 - 25 mm 16 @ 5 , 6 @ 10 Conventional
TB2 40 80 10.00 2 - 16mm
bottom 12 - 25 mm 4 - 25 mm 12 - 25 mm rest @ 30 cm O.C. Beam
top 12 - 25 mm 2 - 25 mm 12 - 25 mm 16 @ 5 , 6 @ 10 Conventional
TB3 40 75 10.00 2 - 16mm
bottom 12 - 25 mm 3 - 25 mm 12 - 25 mm rest @ 30 cm O.C. Beam
top 16 - 25 mm 2 - 25 mm 16 - 25 mm 16 @ 5 , 6 @ 10 Conventional
TB4 40 85 10.00 2 - 16mm
bottom 12 - 25 mm 4 - 25 mm 12 - 25 mm rest @ 30 cm O.C. Beam
top 9 - 25 mm 2 - 25 mm 9 - 25 mm 14 @ 5 , 6 @ 10 Conventional
TB5 35 65 10.00 2 - 16mm
bottom 7 - 25 mm 3 - 25 mm 7 - 25 mm rest @ 30 cm O.C. Beam
top 12 - 25 mm 2 - 25 mm 12 - 25 mm 14 @ 5 , 6 @ 10 Conventional
TB6 40 70 10.00 2 - 16mm
bottom 9 - 25 mm 3 - 25 mm 9 - 25 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 2 - 25 mm 7 - 25 mm 10 @ 5 , 6 @ 10 Conventional
TB7 30 50 10.00 2 - 16mm
bottom 5 - 25 mm 3 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam
top 8 - 25 mm 2 - 25 mm 8 - 25 mm 12 @ 5 , 6 @ 10 Conventional
TB8 30 60 9.50 2 - 16mm
bottom 5 - 25 mm 3 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 2 - 25 mm 7 - 25 mm 12 @ 5 , 6 @ 10 Conventional
TB9 30 60 10.50 2 - 16mm
bottom 7 - 25 mm 3 - 25 mm 7 - 25 mm rest @ 30 cm O.C. Beam
top 10 - 25 mm 2 - 25 mm 10 - 25 mm 14 @ 5 , 6 @ 10 Conventional
TB9A 35 70 10.50 2 - 16mm
bottom 9 - 25 mm 3 - 25 mm 9 - 25 mm rest @ 30 cm O.C. Beam
top 12 - 25 mm 2 - 25 mm 12 - 25 mm 14 @ 5 , 6 @ 10 Conventional
TB10 40 70 10.50 2 - 16mm
bottom 12 - 25 mm 3 - 25 mm 12 - 25 mm rest @ 30 cm O.C. Beam
top 14 - 25 mm 2 - 25 mm 14 - 25 mm 16 @ 5 , 6 @ 10 Conventional
TB10A 40 75 10.50 2 - 16mm
bottom 12 - 25 mm 3 - 25 mm 12 - 25 mm rest @ 30 cm O.C. Beam
Page 5 of 16
Project : PROPOSED SCHOOL AND OFFICE BUILDING
Location : KHANDAHAR AIR FIELD, AFGHANISTAN
Owner : U.S. FORCES
Architect : BOYET DUMAGAY
SCHEDULE OF BEAMS
Fc' = 3,000 Psi Fy = 40,000 Psi Fvy = 33,000 Psi
BEAM WIDTH DEPTH SPAN 16mm STIRRUPS
LOCATION LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) ( 4-legs )
top 7 - 25 mm 22 - 25 mm 7 - 25 mm 18 @ 5 , 6 @ 10 , 5 @ 18 Conventional
FTB1 50 95 12.00 4 - 16mm
bottom 7 - 25 mm 5 - 32 mm 7 - 25 mm rest @ 30 cm O.C. Beam
top 10 - 25 mm 30 - 25 mm 10 - 25 mm 22 @ 5 , 6 @ 10 , 5 @ 16 Conventional
FTB2 60 115 12.00 4 - 16mm
bottom 10 - 25 mm 6 - 25 mm 10 - 25 mm rest @ 30 cm O.C. Beam
top 10 - 25 mm 30 - 25 mm 10 - 25 mm 32 @ 5 , 7 @ 8 , 5 @ 15 Conventional
FTB3 60 115 12.00 4 - 16mm
bottom 10 - 25 mm 5 - 25 mm 10 - 25 mm rest @ 30 cm O.C. Beam
top 12 - 25 mm 24 - 25 mm 12 - 25 mm 30 @ 5 , 7 @ 9 , 5 @ 18 Conventional
FTB4 50 110 12.00 4 - 16mm
bottom 12 - 25 mm 6 - 25 mm 12 - 25 mm rest @ 30 cm O.C. Beam
top 10 - 25 mm 24 - 25 mm 10 - 25 mm 30 @ 5 , 6 @ 10 , 5 @ 18 Conventional
FTB5 50 100 12.00 4 - 16mm
bottom 10 - 25 mm 7 - 25 mm 10 - 25 mm rest @ 30 cm O.C. Beam
Project : PROPOSED SCHOOL AND OFFICE BUILDING
Location : KHANDAHAR AIR FIELD, AFGHANISTAN
Owner : U.S. FORCES
Architect : BOYET DUMAGAY
SCHEDULE OF BEAMS
Fc' = 3,000 Psi Fy = 40,000 Psi Fvy = 33,000 Psi
BEAM WIDTH DEPTH SPAN 12mm STIRRUPS
LOCATION LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) (2-legs)
top 5 - 25 mm 3 - 25 mm 5 - 25 mm 12 @ 5 , 5 @ 10 Conventional
TB1 30 55 5.63 2-12mm
bottom 5 - 25 mm 3 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 20 mm 2 - 20 mm 6 - 20 mm 10 @ 5 , 4 @ 10 Conventional
TB2 25 50 8.58 -
bottom 4 - 20 mm 4 - 20 mm 4 - 20 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 3 - 25 mm 7 - 25 mm 12 @ 5 , 5 @ 10 Conventional
TB3 35 60 8.58 2-16mm
bottom 5 - 25 mm 3 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam
Page 7 of 16
Project : PROPOSED SCHOOL AND OFFICE BUILDING
Location : KHANDAHAR AIR FIELD, AFGHANISTAN
Owner : U.S. FORCES
Architect : BOYET DUMAGAY
SCHEDULE OF BEAMS
Fc' = 3,000 Psi Fy = 40,000 Psi Fvy = 33,000 Psi
COLUMN WIDTH (cm) DEPTH (cm) AREA NO. OF BAR AREA
REMARKS
DESIGNATION ( X-X ) ( Y-Y ) REQUIRED BARS DIAMETER SUPPLIED
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 12 25 9.130 Fail
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 6.758 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 10 25 7.609 Fail
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
Page 8 of 16
Project : PROPOSED SCHOOL AND OFFICE BUILDING
Location : KHANDAHAR AIR FIELD, AFGHANISTAN
Owner : U.S. FORCES
Architect : BOYET DUMAGAY
Page 9 of 16
PROJECT : PROPOSED SCHOOL AND OFFICE BUILDING
LOCATION : KHANDAHAR AIR FIELD, AFGHANISTAN
OWNER : U.S. FORCES
ARCHITECT : BOYET DUMAGAY
CF2:
C5+C6 C9+C10 C9+C10 C5+C6 C5+C5 FOOTING
DL 169.94 338.48 292.08 165.99 52.18 656.78
LL 71.27 194.09 168.42 77.87 14.18
TOTAL 241.21 532.57 460.50 243.86 66.36 656.78
DL PRESSURE 753.07
LL PRESSURE 236.35
TOTAL 989.41 989.41
CF2:
C12 C14 C11 C8 FOOTING
DL 404.77 516.89 289.01
LL 93.37 344.47
TOTAL 498.14 861.36 289.01
DL PRESSURE 1,442.72
LL PRESSURE 521.76
TOTAL 1,964.49 1,964.49
CF3:
C7 C8 C8 C7
DL + 20%DL (FTNG WT) 140.33 236.01 236.01 140.33
LL 69.39 148.69 148.69 69.39
TOTAL 209.72 384.70 384.70 209.72
L W AREA ( ft2)
15.60 8.00 1,342.65
DL PRESSURE 831.19
LL PRESSURE 324.85
TOTAL 1,156.04 1,156.04
TOTAL
1,675.45
525.83
2,201.28
0.989
TOTAL
1,210.67
437.84
1,648.51
1.964
TOTAL
1,116.00
436.16
1,552.16
Project : PROPOSED SCHOOL AND OFFICE BUILDING
Location : KHANDAHAR AIR FIELD, AFGHANISTAN
Owner : U.S. FORCES
Architect : BOYET DUMAGAY
Page 12 of 16
PROJECT : PROPOSED SCHOOL AND OFFICE BUILDING
LOCATION : KHANDAHAR AIR FIELD, AFGHANISTAN
OWNER : U.S. FORCES
ARCHITECT : BOYET DUMAGAY
BEAM LOADING:
SIZE OF PI
BEAM JOINT # DL LL EL TOTAL PU PU (EL) N PILES WIDTH
3.6 6,726.23
3.6 7,962.77
3.6 6,650.51
3.6 7,538.92
4.5 7,131.06
3.6 7,825.05
3.6 6,892.68
3.6 7,692.21
2.7 7,200.10
4.5 7,616.52