Quy Trinh Tran Thach Cao

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PRELIMINARIES:

FINISHING SEQUENCE
Shop-drawing
Method statement
Safety Trade: GYPSUM BOARD
( IITP-HT-06)
Working conditions

CHECK MATERIAL

APPROVAL

Mark ceiling levels on wall Install aluminum V at marked Use straight line and pen to mark Install rods and adjust height in
Show starting point of board
Check flatness of wall levels. rod spacing in accordance with accordance with required
installation on plan
Levels of M&E services above requirements of selected grid distance between concrete floor
Board types for various areas, board
ceiling system and ceiling
spacing
Finishing levels.
Location & dimensions of openings
Details and special locations

NOTE :
TEST M&E SERVICES
AREA : ........................
Spacing of main runners in
ceiling type: .............. Install and strengthen Spacing of cross bars (directly
connection between main connected with boards) in accordance with requirements of
grid system : ....................... runner and cross bars accordance with requirements of selected grid system
Electrical
Rod spacing: .............. Fire fighting Adjust level before install selected grid system (1st adjustment of ceiling height )
board type : ........................ Air-conditioning boards
Ventilation (kitchen chimney )

AREA : ........................
ceiling type: ..............
grid system : .......................
Rod spacing: ..............
board type : ........................

AREA : ........................
ceiling type: ..............
Install and strengthen Adjust straightness and Use perforated tape and apply Check flatness, corner,
grid system : ....................... connection between main corners putty (specialized for ceiling) to connection
Rod spacing: .............. runner and cross bars treat connection between 02
Adjust level before install boards
board type : ........................ boards

You might also like