TOWER VERTICALITY TEST RESULT

(3-Legged Tower)

PROJECT NAME SITE NAME TYPE OF TOWER / TOWER SUPPLIER INSTRUMENT USED
PHILIPPINES MARITIME APO
21.0M, 3-LEGGED LIGHT DUTY
PROLIFERATION PREVENTION NATIONAL COAST WATCH TOWER / ETSI
PROJECT - INCREMENT II
REMOTE STATION

I. VERTICALITY
Tower Section A-B Section B-C
Level TOWER LAYS TOWER LAYS
(mm.) (mm.)
Left Right Left Right
a
b
c
d
e
f
g
h

II. TOLERANCE
1/500 X H (height of tower in millimeter) = mm.

SUB-CON REPRESENTATIVE CONTRACTOR REPRESENTATIVE RAYTHEON REPRESENTATIVE


NAME NAME NAME
DESIGNATION DESIGNATION DESIGNATION
SIGNATURE SIGNATURE SIGNATURE
DATE DATE DATE

Tower Verticality Test


CME-0004
Issued On: July2016 Page 1of1