Professional Documents
Culture Documents
000 Za e 009021 - A Vendor Documentation Requirement
000 Za e 009021 - A Vendor Documentation Requirement
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 2 of 23 Rev. A
INDEX
2 REFERENCE DOCUMENTS 3
3 DEFINITIONS 4
ATTACHMENT 1 19
ATTACHMENT 2 20
ATTACHMENT 3 21
ATTACHMENT 4 22
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 2 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 3 of 23 Rev. A
2 REFERENCE DOCUMENTS
COMPANYs documents
CONTRACT
6600033894 (OOK), 6600033895 (IK) and relevant Schedules
CONTRACTORs documents
000-ZA-E-009800 Document Management and Control Procedure
000-ZA-E-009080 Document Equipment and Material Numbering Procedure
000-ZA-E-009107 Project Progress Measurement Procedure
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 3 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 4 of 23 Rev. A
3 DEFINITIONS
For the purpose of this specification, the following definitions shall apply:
CONTRACTOR Saipem S.p.A.
For the purpose of this specification, the following abbreviations shall apply:
EDMS Engineering Document Management System
IDS Inspection Data Sheet
ITP Inspection Test Plan
MDR Manufacturer Data Record Book
MR Material Requisition
PIM Pre Inspection Meeting
PO Purchase Order
PQR Procedure Qualification Records
QCP Quality Control Plan
TEP Technical Enquiry Package
TSP Technical Supply Package
WPS Weld Procedure Specification
VDR Vendors Document Register
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 4 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 5 of 23 Rev. A
The VENDOR shall fill the yellow highlighted columns and submit list of
deliverables and time schedule for VENDOR documents FORM-1 (See
Attachment 2) within two weeks after the receipt of a purchase order or a letter of
intent. The reference for this list shall be the FORM-1 in Microsoft Excel format
that is available from CONTRACTOR.
This form will be filled in compliance with the list of document mentioned on the
SAUDI ARAMCO NMR (and document list foreseen in the Material Requisition)
that has to be considered as minimum contractual requirement; VENDOR shall
include the entire list of documents provided by his SUB-VENDORS.
The submission time schedule shall be in accordance with the dates expressed in
contractual documents (e.g. MR or PO).
The above filled form will be sent by VENDOR to CONTRACTOR that shall submit
this excel form to the document controller for the upload of documents in the
EDMS with associated status WORKING.
The above is valid for all documents except for the ones falling in the below list:
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 5 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 6 of 23 Rev. A
CONTRACTOR will proceed with the internal cycle of comments / approval (through
CONTRACTOR NDT certified III Level) and with the preparation of a Master Copy, which is
the VENDOR document being marked up with CONTRACTOR comments.
Approval cycle for documents d ITP:
Only approved revision to be officially transmitted to COMPANY as per following workflow:
once received ITP from VENDOR, it is reviewed/commented by CONTRACTOR and
transmitted back to VENDOR with CONTRACTOR comments. The same document with
CONTRACTOR comments is sent to COMPANY as part of the Inspection Assignment
Package (IAP)
ITP shall be prepared for all equipment and materials assigned a level 2,3 or 4 in SAEP-
1151, and for any equipment deemed necessary by CONTRACTOR.
If ITP is not approved (status B minimum see point 4.4) PIM cannot be performed.
COMPANY comments are discussed and integrated by VENDOR during Pre-Inspection
Meeting.
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 6 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 7 of 23 Rev. A
The VENDOR shall place the project sticker as shown in the 000-ZA-E-009080 on
each VVENDOR drawings beside the drawing title block or on the cover page of
the documents. If there is no space on the cover sheet, a cover sheet shall be
added for the project sticker. The project sticker is available from CONTRACTOR.
Additional information:
The following additional information shall be shown on VENDOR documents:
Item:
Service:
(AOC Dummy N.: MF XX (Dummy number is mentioned on the 1st page of P.O.)
o MFCI : If the Vendor legal head office is OOK
o MFIK : If the Vendor legal head office is IK
BI Number: 10-01506
All VENDOR documents and as-built drawings shall be issued file types listed
below in accordance with document SAEP-334.
Documents issued by VENDOR without the CONTRACTOR cover sheet will not
be considered and will be rejected.
For each document submission, the VENDOR shall update the Project cover sheet
and shall indicate the date of issue and the revision number.
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 7 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 8 of 23 Rev. A
Internal revisions, if any, between VENDOR and his sub-Contractors shall not be
delivered to CONTRACTOR and must not be cause of jumps in the numbering of
the official revisions.
The VENDOR shall send to CONTRACTOR the documents to the address shown
in Section 6. Form for the submission are listed on Section 6 below (unless
otherwise specified in P.O. or Material requisition).
The documents and data required from VENDOR are listed in Saudi Aramco SA-
7900 series forms (NONMATERIAL REQUIREMENTS forms) together with the
number of calendar weeks within which the documents shall be delivered after the
P.O. award. The calendar weeks declared shall be confirmed by VENDOR at the
bid phase.
After the receipt of P.O., VENDOR shall complete and submit to CONTRACTOR
the list of deliverables using the Vendor Document Register (VDR). Any deviation
after P.O. placement will not be allowed without official written approval by
CONTRACTOR.
Other document shall be added by VENDOR if necessary for full identification of
the supply.
When required in the P.O. and/or in the QA/QC Job Specifications, the delivery of
the electronic files of all documentation issued by VENDOR shall take place
simultaneously with the paper copy.
Electronic files shall be delivered on CD or DVD storage media.
All electronic documentation, unless otherwise specified in the Quality Project
Specification 000-ZA-E-009310 (QC REQUIREMENTS FOR SUPPLIERS OF
MATERIALS AND EQUIPMENTS) shall be produced in PDF format as well as in
the native format agreed with CONTRACTOR. The files shall be in a "workable
stand-alone" format, without any special features (links to other files, special fonts,
macros, etc.) which may affect the possibility of viewing and editing.
Documents issued by VENDOR without the above described procedure will not be
considered and will be rejected.
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 8 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 9 of 23 Rev. A
VENDOR shall deliver the required documentation for review, approval and/or
information only in accordance to the VDR.
VENDOR documents shall be reviewed by CONTRACTOR to verify compliance to
the requisition as well as other contractual documents. All documents required to
be approved shall be returned to the VENDOR with stamp showing the actual
status.
CONTRACTOR will send back to the VENDOR the commented copies within 30
calendar days from receipt date. Any CONTRACTOR review/approval does not
relieve VENDOR from his responsibility or liabilities under the Contract and/or P.O.
obligations.
CONTRACTOR review status shall be clearly shown on the project sticker on the
VENDOR document using the following review codes:
VENDOR shall revise and submit the document within 15 calendar days or
otherwise indicated in the P.O. or material requisition.
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 9 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 10 of 23 Rev. A
VENDOR is required to issue a complete Project Inspection and Test Plan (ITP)
including all inspections and testing to be performed at his workshop and/or at
sub-VENDORs shops during manufacturing activities.
All VENDOR procedures shall be available for review during the Inspection
activities.
4.5 Resubmission of Vendor Drawings
When the VENDOR receives VENDOR drawings returned with a review code of
B or C, the procedure described in subsection 4.3 and 4.4 shall be repeated
until review code becomes A.
Codes A and B allows VENDOR to proceed with the fabrication if
CONTRACTORs comments and understood and agreed by VENDOR. Code C
does not allow VENDOR to proceed with fabrication of its materials / equipment.
The revised VENDOR drawings shall be marked with revision clouds and revision
marks to clearly indicate the revised parts.
The text revised parts will be identified by a vertical line in the right-hand margin
against the revised text (word puts a line in the right-hand margin) or a triangle as
per Numbering Procedure 000-ZA-E-009080.
For graphics/pictures the revised parts will be indicated by a triangle holding the
revision index positioned adjacent to the revision.
Document in excel
Text parts : The revised parts will be identified by a triangle holding the revision
index.
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 10 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 11 of 23 Rev. A
Process data : The revised parts will be written in Italic and heavy type character
(reviewed PART). This means that the other data will not be
written in heavy type character.
Example :
After the final approval received from CONTRACTOR, VENDOR will issue all the
document in revision 00 as: Supplier Certified Final or Valid for Construction.
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 11 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 12 of 23 Rev. A
5.1 INTRODUCTION
The user manual shall have an introduction, which describes how the manual is
structured, and how it shall be used. Address and telephone number for contacts for
assistance shall also be given.
The content of the relevant book shall comply with the sequential order specified in
the typical list of contents.
The detailed index shall be reviewed with status A by CONTRACTOR prior to the
compilation of the Equipment Operating Instructions & Maintenance Manuals (see
Attachment 4).
Adjustments to this typical list may be agreed between CONTRACTOR and
VENDOR considering the specificity of each supply.
If the complete equipment package consists of several systems, the main system
should be described first, followed by descriptions of each subsystem and their
interconnections.
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 12 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 13 of 23 Rev. A
The information shall be given in a logical sequence and shall include all operations and
observations, which the operator shall undertake. These may be:
Description of the various forms of disturbance of operation that may occur, how they
can be identified and the consequences they may have for the operation shall be given.
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 13 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 14 of 23 Rev. A
The manual shall state all requirements for reports to the VENDOR in the form of
registrations and observations.
A description shall be given of all known hazards that may occur during operation. This
also applies to hazards, which are due to lack of observation of the VENDOR's
procedures as well as to external causes, e. g. lack of cooling water, loss of electrical
power, etc.
The manual shall give detailed information about protective measures, how to reduce
the consequences to a minimum and what procedures to follow in the event of an
accident.
5.6 MAINTENANCE
5.6.1 General
Maintenance includes all inspections, measurements, adjustments and operations
carried out directly on the equipment in order to ensure safe, reliable and economical
operation.
Maintenance documentation shall cover the maintenance, which can normally be done
by the user and the maintenance, which is not expected to be done by the user.
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 14 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 15 of 23 Rev. A
The inspections consist of what can be measured, seen, heard or felt without
interference in the equipment both during an operation and while at standstill.
The VENDOR shall give instructions and intervals (weeks or running hours) concerning
inspection points based on his own experience and the selected monitoring system.
- cleaning;
- lubrication schedule;
- adjustments;
- calibrations;
- replacement of wear parts;
- replenishments.
It is not normally required that this shall be covered by the instructions at the user's
disposal. However the VENDOR shall keep and upon request provide instructions
concerning overhaul and repairs at special shops. If agreed, the VENDOR shall also
keep all documentation for modification or rebuilding of the equipment.
The diagram shall list possible faults and irregularities, and refer to possible causes.
The diagram shall cover faults which may be discovered during operation and
maintenance. Furthermore it shall be described how the fault is to be corrected, if
necessary by referring to other maintenance instructions.
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 15 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 16 of 23 Rev. A
The VENDOR should prepare a registration form where the results of measurements
and observations can be noted systematically in order to give the VENDOR a better
basis for diagnosis when the user requests VENDOR's assistance.
The description of the preparations for storage shall include preservation and other
protection against external influences.
The description of maintenance during storage shall include preventive and corrective
measures to ensure that the functionality of the equipment is taken care of. The clause
shall also describe how the equipment is prepared for operation after storage.
The VENDOR shall also state how spare parts to be stored and preserved.
VENDOR to describe all the instruction of preservation activities to be carried out for the
equipment after is removed from shipping box and installed on its final position before
equipment is commissioned.
The list should be made in such a way that spare parts intended for installation and
commissioning and spare parts intended for operation, are identified separately.
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 16 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 17 of 23 Rev. A
Address
E_mail address to request blank Project Specialist Leader
FORM-1 submission (Name of PSL will be communicated after
the placement of P.O.)
xxxxxxxx
xxxxxxxx
Via A. De Gasperi, 16
20097 San Donato Milanese, Milano Italy
Telephone: +3902520xxxxx
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 17 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 18 of 23 Rev. A
Electronic copy:
Refer to 000-ZA-E-009310 QC
Manufacturer Data Record Book requirements for Vendors
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 18 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 19 of 23 Rev. A
Attachment 1
DWG/SPEC. N
___________________
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 19 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 20 of 23 Rev. A
Attachment 2
FORM -1
Excel file attached
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 20 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 21 of 23 Rev. A
Attachment 3
WELDING PACKAGE TECHNICAL APPROVAL WORKFLOW
AOC PMT DESIGNATED
SP DISCIPLINE SP WELDING ENG.
VENDOR REPRESENTATIVE WELDING
(PSL) (TMC)
(PMT) REPRESENT. (DWR)
1) VENDOR SUBMIT
2) EXPEDITE AND CHECK
WELDING PACKAGE (WP)
VENDORS WP, LOAD
AS PER PREVIOUSLY
DOCUMENTATION IN AIM
AGREED SUBMITTAL
SCHEDULE
7) DOCUMENTATION
REQUIRE AOC REVIEW
PER SAEP 352 OR SAMSS
13) FABRICATION
12) RECEIVE 1,2,5
AOC STATUS CODES 1,2 & 5 11) AOC
LETTER/TRANSMITTAL
CODE
LOG AND DISTRIBUTE
TO VENDOR AND PIC
(PROJECT INSPECTOR
COORDINATOR) 3,4
14) CORRECT WP AND IF Company comments are
RESUBMIT present, comment sheet to be
AOC STATUS CODES 3 & 4 sent to TMC for review
= Welding Package shall include: Weld Map; WPS/PQR; Weld Descriptions (when required by
applicable SAES); the following information: Design Codes, Minimum Design Metal Temperature,
Service (WET H2S, H2, NaOH, etc.)
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 21 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 22 of 23 Rev. A
Attachment 4
1 Introduction
Main Data
2
3 Technical Description
5 Operating Instructions
Maintenance
6
General
6.1
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 22 of 23
PLANT LOCATION CUSTOMER JOB UNIT
KHURAIS SAUDI ARABIA ARAMCO OVERSEAS COMPANY B.V. 032184 000
PROJECT / UNIT
Doc no. 000-ZA-E-009021
KHURAIS FACILITIES EXPANSION & SATELLITE GOSP
Sh. 23 of 23 Rev. A
This document has been prepared by Saipem Spa for Aramco Overseas Company.
It contains information that is Confidential and such information is intended to be for the exclusive use of the individual or entity named above.
It shall be neither shown to third parties nor used for purposes other than those for which it has been disclosed. Page 23 of 23